Technology to improve reliability Riyadh May 2018 JinkoSolar Co., - - PowerPoint PPT Presentation

technology to improve reliability
SMART_READER_LITE
LIVE PREVIEW

Technology to improve reliability Riyadh May 2018 JinkoSolar Co., - - PowerPoint PPT Presentation

Technology to improve reliability Riyadh May 2018 JinkoSolar Co., Ltd. Conf nflic icting ng Demand mand Maximum P erformance Most Lowest Cost Durable P roducts Resea search ch and and Developm velopment ent Prominent R&D


slide-1
SLIDE 1

JinkoSolar Co., Ltd.

Technology to improve reliability

Riyadh May 2018

slide-2
SLIDE 2

Conf nflic icting ng Demand mand

Maximum P erformance Lowest Cost Most Durable P roducts

slide-3
SLIDE 3

3

Resea search ch and and Developm velopment ent

 Prominent R&D Team with around 200 R&D personnel holding Doctor/Master degrees driving significant product improvements  Using DuPont's advanced materials to produce high-efficiency and low-cost solar cells  Cooperating with global universities and research institutions, developing the latest technology  Own several core technology patents on ingot, wafer, cell and modules processing  Continuous R&D investment

slide-4
SLIDE 4

4

Quali lity ty Cont ntro rol

 EMS- Electronic Management System

  • 16 in-line quality control points in module workshop
  • Precise data-recording & supervision for all the manufacturing QC points

 Product Traceability Control

  • Tracking card with unique barcodes tracing from module back to ingot
  • SAP process traceability system with 26-year data storage.
  • 40 in quality checkpoints in the entire process

 Employ Electroluminescence Test (EL) to inspect for potentially defective cells.

slide-5
SLIDE 5

5

Cert rtific ification ation

Product Certificates

MCS TUV UL CQC JET ISO 9001:2008 ISO 14001:2004 OHSAS 18001:2007

System Certificates

slide-6
SLIDE 6

Additio itional nal Cert rtific ificat ation ion

AMMONIA R E SIST ANC E IEC61716 S A L T MIST R E SIST ANC E IEC61701 DUST AND SAND IE C60068-2- 68 Anti- PID 85℃/85% RH, -1000V IEC62804

Agriculture Coastal Temperature & humidity Desert

slide-7
SLIDE 7

IEC Cert rtific ificati ation

  • n
slide-8
SLIDE 8

Field ld Failures ures

slide-9
SLIDE 9

Tech chnical nical Bankabi kabili lity ty

Certification Test beyond IEC Other Voluntary Tests R&D Activities Participation in development

  • f standards
slide-10
SLIDE 10

10

LAB ABS

slide-11
SLIDE 11

11

Micr cro-crac cracking ng

Portable EL Microcracking can lead to hotspot, power degradation and snail trails Generally the snail-trails will happen after more than half a year on-site, through simulation we can predict the probability and severity . Microcrack & Snail-trails Simulation

slide-12
SLIDE 12

Obse served ved Back ckshe sheet et failures ures

slide-13
SLIDE 13

Focu cus s on Yield

slide-14
SLIDE 14

14

Half cell

slide-15
SLIDE 15

15

Advantages of Half cell

slide-16
SLIDE 16

16

Shading Advantages of Half cell

slide-17
SLIDE 17

17

Hot Spot Elimination

Cell Shading condition Maxim temperature from test Delta Mc-Si Full cell 115.4 / ½ half cell 96.0 19.4 Mono PERC Full cell 122.4 / ½ half cell 98.0 24.4

  • Current, thus

Power of half-cell is halved

  • Lower Power

dissipated on shaded cell

  • Around 20°C

lower temp. In hot spot test

  • Less risk for

system operation

slide-18
SLIDE 18

Bifacial: Tech. Concept Conventional Bifacial Front Side Back Side Front Side Back Side

18

Internal Jinko

ARC n+ P-type mono wafer Al contact

Grid EVA

CELL CELL BACKSHEET GLASS Sunlight ARC n+/p+ P-type/N-type mono wafer

Grid

ARC

Grid

EVA CELL CELL GLASS Sunlight GLASS Sunlight

slide-19
SLIDE 19

0% 5% 10% 15% 20%

白漆 黄沙 水泥 草地 水面

P-type bifacial module(bifacial factor 0.7)

Per watt power generation gain (only front side power concerned)(%)

17%-19% 7%-9% 6%-7% 6%-7% 4%-5% 80%-85% 22%-25% 30%-33% 10%-20% 2%-5%

Surface Reflectance

19

Bifacial: Real Power Generation Gain

Address:Jinko factory, Haining,30.32° north latitude, 120.42° east longitude Tilt angle:30 °, close to the latitude; Mounting height:the distance from the lower edge to the ground is 1.2m; Capacity:1.5kW/array.

White paint Sand Grass Water Cement

Internal Jinko

slide-20
SLIDE 20

20 www.jinkosolar.com 20

South Africa | 91 MW Lebanon | 1 MW Jordan | 23 MW Kuwait | 10 MW

Some me Refer erences nces

slide-21
SLIDE 21

21

Thank You!