Te Tech chnical nical as aspe pects cts
- f the project
ct Cave of Han Han
Workshop Grottes de Han 2017
Vladimir Vashkevich Adrian Kondacs Cave Lighting CL GmbH Grotte-de-Han: A New Era of Cave Illumination
Te Tech chnical nical as aspe pects cts of the project ct - - PowerPoint PPT Presentation
Grotte-de-Han: A New Era of Cave Illumination Te Tech chnical nical as aspe pects cts of the project ct Cave of Han Han Vladimir Vashkevich Cave Lighting CL GmbH Adrian Kondacs Workshop Grottes de Han 2017 ve of Han Tech chni nica
Workshop Grottes de Han 2017
Vladimir Vashkevich Adrian Kondacs Cave Lighting CL GmbH Grotte-de-Han: A New Era of Cave Illumination
Tech chni nica cal l aspe pect cts of the e proj
ect Cave ve of Han Vlad adim imir ir Vash shke kevi vich ch Adri rian an Kond ndacs cs
Project Manager, Technical Support Project Manager, Cave Lighting specialist
Tech chni nica cal l aspe pect cts of the e proj
ect Cave ve of Han
Cave ve Ligh ghti ting g CL GmbH
www.cavelighting.de
Tech chni nica cal l aspe pect cts of the e proj
ect Cave ve of Han
2011 2012 2013 2014 2015 2016 2017 2018
First contact Test Installation Drap aper erie ies Cave ve Ligh ghti ting g CL GmbH
www.cavelighting.de
Concept Kick-Off Light test Step 1 Step 2 Step 4 Step 3
Salle de Styx, Le Trophee, Galerie de Fer de Lance, Salle du Dome, Le Passage du Diable, Embarquement, Chemin de Halage, Sortie, Tunnel Salle du Renard, Salle du Scarabe, Salle de la Grenouille, Salle Vigneron Salle du Prcipice, Salle Cataclysme, Salle du Minarete, Les Mysterieuses, Galerie Lannoy
Development
23.08.2011
Tech chni nica cal l aspe pect cts of the e proj
ect Cave ve of Han
Cave ve Ligh ghti ting g CL GmbH
www.cavelighting.de
First contact and first ligh
Tech chni nica cal l aspe pect cts of the e proj
ect Cave ve of Han
Cave ve Ligh ghti ting g CL GmbH
www.cavelighting.de
First contact and first lighting
Tech chni nica cal l aspe pect cts of the e proj
ect Cave ve of Han
Cave ve Ligh ghti ting g CL GmbH
www.cavelighting.de
Test installation at Draperies June-2012
Les Draperies FLOODED AREA
Tech chni nica cal l aspe pect cts of the e proj
ect Cave ve of Han
Cave ve Ligh ghti ting g CL GmbH
www.cavelighting.de
Test installation at Draperies June-2012
Installed:
77 pcs.
48 pcs
29 pcs.
6 pcs.
Tech chni nica cal l aspe pect cts of the e proj
ect Cave ve of Han
Cave ve Ligh ghti ting g CL GmbH
www.cavelighting.de
Tech chni nica cal l aspe pect cts of the e proj
ect Cave ve of Han Cave ve Ligh ghti ting g CL GmbH
www.cavelighting.de
TM system
TM system?
Tech chni nica cal l aspe pect cts of the e proj
ect Cave ve of Han Cave ve Ligh ghti ting g CL GmbH
www.cavelighting.de Lighting system Control system
TM system
Audio Show control Multimedia Power supply
Communication
Guiding Show or artistic light Pathway lights Evacuation (safety) lights Central Power Cabinets Emergency (UPS, Batteries) General illumination Lights Cables Network, bus Phones Power Supply modules
Connection
Radio remote
Electrical Connections
Tech chni nica cal l aspe pect cts of the e proj
ect Cave ve of Han Cave ve Ligh ghti ting g CL GmbH
www.cavelighting.de Lighting system
General illumination Show or artistic light Pathway lights Evacuation (safety) lights
IP65 for control system and at least IP68 for luminaries;
sectors or among the halls);
Tech chni nica cal l aspe pect cts of the e proj
ect Cave ve of Han Cave ve Ligh ghti ting g CL GmbH
www.cavelighting.de Lighting system
General illumination Show or artistic light Pathway lights Evacuation (safety) lights
defined at the design phase;
Tech chni nica cal l aspe pect cts of the e proj
ect Cave ve of Han Cave ve Ligh ghti ting g CL GmbH
www.cavelighting.de Lighting system
General illumination Show or artistic light Pathway lights Evacuation (safety) lights
for escape period, in event the main supply fails, or a back-up power supply system (a generator, and accumulator);
subsidiary loop.
local UPS with battery; The parameters of the local emergency power have to be specified during the design phase;
Tech chni nica cal l aspe pect cts of the e proj
ect Cave ve of Han Cave ve Ligh ghti ting g CL GmbH
www.cavelighting.de Cave Lighting hardware Luminaries Control and Multimedia Units Power Supply Connection Accessories
Tech chni nica cal l aspe pect cts of the e proj
ect Cave ve of Han Cave ve Ligh ghti ting g CL GmbH
www.cavelighting.de Cave Lighting Luminaries PWM dimmable DMX controllable IP68 CL-LSQ 3W 300 lm
CW NW WW
100 200 400
IP67 CL-LMT 1W 60 lm
CW NW WW
900
IP68 7W 700 lm CL-ESQ
RGBW
260 400
17W 1200 lm IP68 CL-EQP
RGBW
160 260 400
12W 1200 lm
CW NW WW
IP68
100 200 400
CL-LQP
Tech chni nica cal l aspe pect cts of the e proj
ect Cave ve of Han Cave ve Ligh ghti ting g CL GmbH
www.cavelighting.de
Covers material clear optical polycarbonate LEXAN Resin LS2, UV-stabilized Housing Al-profile Housing covering Polymer Coating Housing color dark gray Side brace material stainless steel A2 / 1.4301 Distance between Al and steel parts min 0.5 mm Cable entry metal cable gland M12 Cable gland waterproof additionally internal sealed with silicone compound Metal parts (screws, nuts) stainless steel Parts sealing silicone O-ring IP rating IP68 / IEC 60529 Test conditions underwater 3 bar / 10 min
Mechan anic ical al constr truc ucti tion
Power supply voltage range 15VDC … 35VDC Nominal power supply voltage 24VDC Power supply regulation constant power Electrical protection
Fuse no internal fuse, externally fused Safety requirements EN60598
Electr tric ical al parame mete ters rs
Specially designed for show cave installation;
IP65 IP65
Tech chni nica cal l aspe pect cts of the e proj
ect Cave ve of Han Cave ve Ligh ghti ting g CL GmbH
www.cavelighting.de Cave Lighting Control Units CL-CN2 CL-MMC IP65 Radio Receiver IP65 CL-CP2 LED luminaries Control Unit provides powering, brightness and light scenes control for LED luminaries with PWM dimming. Switching point Control Unit provides user interaction control function within lighting installations. Multimedia Control Unit provides the audio and DMX signal source for sound and music illustrations. Radio Remote Control units provides wireless interactivity for guiding control of the system .
Tech chni nica cal l aspe pect cts of the e proj
ect Cave ve of Han Cave ve Ligh ghti ting g CL GmbH
www.cavelighting.de AC In DC Out LAN 24VDC 400VAC Backup Battery AC/DC Power modules UPS Network units Fiber optic cable Overvoltage Protection (SPD) Type I+II Overvoltage Protection (SPD) Type II Fuses Fuses Automation units (PLC or BK) Heater High Voltage Low Voltage Relays
network GND/PE
Tech chni nica cal l aspe pect cts of the e proj
ect Cave ve of Han
Cave ve Ligh ghti ting g CL GmbH
www.cavelighting.de
Tech chni nica cal l aspe pect cts of the e proj
ect Cave ve of Han Cave ve Ligh ghti ting g CL GmbH
www.cavelighting.de What color of light?
Basic definitions:
Warm White 3000K Decision Cool White 6300K
General and artistic lights
Neutral White 5000K
General, artistic, pathway lights Color light RGBW
Color light show
Tech chni nica cal l aspe pect cts of the e proj
ect Cave ve of Han Cave ve Ligh ghti ting g CL GmbH
www.cavelighting.de
Basic definitions:
What type of light control ? Decision
Static Dynamic Central No control DMX Dynamic
General and artistic lights at some areas
Static
General and pathway lights
DMX
Light-and Music Color Show
Central
Each power line controllable over Central Control
Tech chni nica cal l aspe pect cts of the e proj
ect Cave ve of Han Cave ve Ligh ghti ting g CL GmbH
www.cavelighting.de
Development: Input: Concept
(design-brief):
Start of development and planning:
Tech chni nica cal l aspe pect cts of the e proj
ect Cave ve of Han Cave ve Ligh ghti ting g CL GmbH
www.cavelighting.de
switching points
Tech chni nica cal l aspe pect cts of the e proj
ect Cave ve of Han Cave ve Ligh ghti ting g CL GmbH
www.cavelighting.de
Tech chni nica cal l aspe pect cts of the e proj
ect Cave ve of Han Cave ve Ligh ghti ting g CL GmbH
www.cavelighting.de
Tech chni nica cal l aspe pect cts of the e proj
ect Cave ve of Han Cave ve Ligh ghti ting g CL GmbH
www.cavelighting.de
Tech chni nica cal l aspe pect cts of the e proj
ect Cave ve of Han Cave ve Ligh ghti ting g CL GmbH
www.cavelighting.de
Control layouts
Tech chni nica cal l aspe pect cts of the e proj
ect Cave ve of Han Cave ve Ligh ghti ting g CL GmbH
www.cavelighting.de Guide interaction units Wired Wireless Number of push buttons: … 5 Key lock
Tech chni nica cal l aspe pect cts of the e proj
ect Cave ve of Han Cave ve Ligh ghti ting g CL GmbH
www.cavelighting.de
UV01 UV02 UV03 Touch Panel PLC UV10 UV09 UV08
192.168.80.110 192.168.80.120 192.168.80.130 192.168.80.100 192.168.80.200 192.168.80.190 192.168.80.180 192.168.80.105 Fiber-optic ring Office network Control Center
Tech chni nica cal l aspe pect cts of the e proj
ect Cave ve of Han Cave ve Ligh ghti ting g CL GmbH
www.cavelighting.de
Programmable Fieldbus Controller Wago 750-880 Web-Panel Wago 762-1121
Parameters: Diagonal 30,7 mm (12,1 inch) Resolution 800 x 600 Operating system Windows CE Power Supply 24VDC Parameters: Communication Ethernet / IP Baud rate 10/100 Mbs Program memory 1Mb Software development CoDeSys 2.3 Power Supply 24VDC
Tech chni nica cal l aspe pect cts of the e proj
ect Cave ve of Han Cave ve Ligh ghti ting g CL GmbH
www.cavelighting.de
Statuses of Power Cabinets ON Way lights OFF ON OFF Sections ON/OFF All lights
Main Screen
Main functions
Tech chni nica cal l aspe pect cts of the e proj
ect Cave ve of Han Cave ve Ligh ghti ting g CL GmbH
www.cavelighting.de
Power Cabinet statuses
System controls
Alarms and statuses
No error, ready Error, alarm, out of operation Non critical status Indicator legend
Tech chni nica cal l aspe pect cts of the e proj
ect Cave ve of Han Cave ve Ligh ghti ting g CL GmbH
www.cavelighting.de
Tech chni nica cal l aspe pect cts of the e proj
ect Cave ve of Han Cave ve Ligh ghti ting g CL GmbH
www.cavelighting.de
Switch ON static lights
Tech chni nica cal l aspe pect cts of the e proj
ect Cave ve of Han Cave ve Ligh ghti ting g CL GmbH
www.cavelighting.de
Start dynamic lights
Tech chni nica cal l aspe pect cts of the e proj
ect Cave ve of Han Cave ve Ligh ghti ting g CL GmbH
www.cavelighting.de
Start DMX light-and-music show
Tech chni nica cal l aspe pect cts of the e proj
ect Cave ve of Han Cave ve Ligh ghti ting g CL GmbH
www.cavelighting.de
2015 2016 2017 2018
Tech chni nica cal l aspe pect cts of the e proj
ect Cave ve of Han Cave ve Ligh ghti ting g CL GmbH
www.cavelighting.de
Tech chni nica cal l aspe pect cts of the e proj
ect Cave ve of Han Cave ve Ligh ghti ting g CL GmbH
www.cavelighting.de
Luminaries statistics (Step 1.. Step 3)
CL-LSQ CL-ESQ CL-LQP 1409 292 1726 CW: 48% NW: 50% 20 5 CL-EQP 2% Types Total Colors Pathway: 37% General, artistic and show: 63% Function Power consumption 9000 W
Tech chni nica cal l aspe pect cts of the e proj
ect Cave ve of Han Cave ve Ligh ghti ting g CL GmbH
www.cavelighting.de
Hardware statistics:
Control Units
CL-CN2 35 pcs. CL-MMC-02 1 pcs. Switching points 17 pcs. Radio Receiver 7 pcs. Power Cabinets 7 pcs. Control Units
Tech chni nica cal l aspe pect cts of the e proj
ect Cave ve of Han Cave ve Ligh ghti ting g CL GmbH
www.cavelighting.de
Step 4
20.11.2017 Light installation of Sections M, T
Mounting of 3 Power Cabinets Improvements of the Control System
DMX color show at Salle d’Ares
Tech chni nica cal l aspe pect cts of the e proj
ect Cave ve of Han Cave ve Ligh ghti ting g CL GmbH
www.cavelighting.de