te tech chnical nical as aspe pects cts
play

Te Tech chnical nical as aspe pects cts of the project ct - PowerPoint PPT Presentation

Grotte-de-Han: A New Era of Cave Illumination Te Tech chnical nical as aspe pects cts of the project ct Cave of Han Han Vladimir Vashkevich Cave Lighting CL GmbH Adrian Kondacs Workshop Grottes de Han 2017 ve of Han Tech chni nica


  1. Grotte-de-Han: A New Era of Cave Illumination Te Tech chnical nical as aspe pects cts of the project ct Cave of Han Han Vladimir Vashkevich Cave Lighting CL GmbH Adrian Kondacs Workshop Grottes de Han 2017

  2. ve of Han Tech chni nica cal l aspe pect cts of the e proj ojec ect Cave ch Vlad adim imir ir Vash shke kevi vich Adri rian an Kond ndacs cs Project Manager, Project Manager, Technical Support Cave Lighting specialist

  3. ve of Han Tech chni nica cal l aspe pect cts of the e proj ojec ect Cave The Cave ve Lighting ghting system for Grotte otte-de de-Ha Han: • What was at the beginning • How the system was developed • How the system was realized • What the system consists of • How the system works g CL GmbH Cave ve Ligh ghti ting www.cavelighting.de

  4. ve of Han Tech chni nica cal l aspe pect cts of the e proj ojec ect Cave History of the Project 23.08.2011 First contact Concept Kick-Off Step 1 Step 2 Step 3 Step 4 2011 2012 2013 2014 2015 2016 2017 2018 Light test Test Installation Salle du Renard, Salle du Prcipice, Salle de Styx, Le Passage du Diable, Development Drap aper erie ies Salle du Scarabe, Salle Cataclysme, Le Trophee, Embarquement, Salle de la Grenouille, Salle du Minarete, Galerie de Fer de Lance, Chemin de Halage, Salle Vigneron Les Mysterieuses, Salle du Dome, Sortie, Galerie Lannoy Tunnel g CL GmbH Cave ve Ligh ghti ting www.cavelighting.de

  5. ve of Han Tech chni nica cal l aspe pect cts of the e proj ojec ect Cave History of the Project 2011 First contact and first ligh g CL GmbH Cave ve Ligh ghti ting www.cavelighting.de

  6. ve of Han Tech chni nica cal l aspe pect cts of the e proj ojec ect Cave History of the Project 2011 First contact and first lighting g CL GmbH Cave ve Ligh ghti ting www.cavelighting.de

  7. ve of Han Tech chni nica cal l aspe pect cts of the e proj ojec ect Cave History of the Project Test installation at Draperies June-2012 Les Draperies FLOODED AREA g CL GmbH Cave ve Ligh ghti ting www.cavelighting.de

  8. ve of Han Tech chni nica cal l aspe pect cts of the e proj ojec ect Cave History of the Project Test installation at Draperies June-2012 Installed:  Luminaries 77 pcs. • CL-LSQ (3W) 48 pcs • CL-LQP (12W) 29 pcs.  Control units 6 pcs.  Total power consumption 600W g CL GmbH Cave ve Ligh ghti ting www.cavelighting.de

  9. ve of Han Tech chni nica cal l aspe pect cts of the e proj ojec ect Cave History of the Project After more than an year after Draperies it was decided to begin installation all the Cave! 2013 g CL GmbH Cave ve Ligh ghti ting www.cavelighting.de

  10. ve of Han Tech chni nica cal l aspe pect cts of the e proj ojec ect Cave ghting TM TM system Cave ve Lighting ng TM TM system? Wh What at is is th the Ca e Cave ve Li Ligh ghti ting system? g CL GmbH Cave ve Ligh ghti ting www.cavelighting.de

  11. ve of Han Tech chni nica cal l aspe pect cts of the e proj ojec ect Cave ghting TM TM system Cave ve Lighting Power General overview Cabinets illumination Power Supply Show or Power supply modules artistic light Lighting system Emergency Pathway (UPS, Batteries) lights Evacuation Cables Connection (safety) lights Electrical Connections Guiding Radio remote Lights Control system Multimedia Network, bus Communication Phones Central Audio Show control g CL GmbH Cave ve Ligh ghti ting www.cavelighting.de

  12. ve of Han Tech chni nica cal l aspe pect cts of the e proj ojec ect Cave General requirements: General illumination  Have to be switchable; Show or artistic light  Minimum heat emission; Lighting system Pathway  Water and moisture resistant: lights IP65 for control system and at least IP68 for luminaries; Evacuation (safety) lights  Hidden from visitors, as much as possible;  Spitted into independent zones (sections) (ex., into 100 meters sectors or among the halls);  Have to be controlled or monitored;  Cost effective energy;  Necessary and sufficient level of illumination; g CL GmbH Cave ve Ligh ghti ting www.cavelighting.de

  13. ve of Han Tech chni nica cal l aspe pect cts of the e proj ojec ect Cave General requirements: General illumination  Have to emphasize the physiographic characteristics of the cave; Show or artistic light  Support and provide guiding story; Lighting system Pathway  Could be defined as accent or flood; lights  Evacuation Highlights different elements of the cave. That elements would be (safety) lights defined at the design phase;  Different control light layouts could be used: static or dynamic;  Light effects : • fading (slow light on or off), • running light or shadows, • chaotic lights, • simulation of candela light • and so on. g CL GmbH Cave ve Ligh ghti ting www.cavelighting.de

  14. ve of Han Tech chni nica cal l aspe pect cts of the e proj ojec ect Cave General requirements: General illumination  Separated from the general lighting; Show or artistic light  Self-contained power supply which is capable of supplying lighting Lighting system for escape period, in event the main supply fails, or a back-up power Pathway supply system (a generator, and accumulator); lights  Evacuation Emergency lighting system for path lighting could be connected to a (safety) lights subsidiary loop.  Emergency lighting sub-system include: a power generator and/or a local UPS with battery; The parameters of the local emergency power have to be specified during the design phase; g CL GmbH Cave ve Ligh ghti ting www.cavelighting.de

  15. ve of Han Tech chni nica cal l aspe pect cts of the e proj ojec ect Cave Cave Lighting hardware Control and Luminaries Power Supply Connection Accessories Multimedia Units g CL GmbH Cave ve Ligh ghti ting www.cavelighting.de

  16. ve of Han Tech chni nica cal l aspe pect cts of the e proj ojec ect Cave Cave Lighting Luminaries DMX controllable PWM dimmable CL-LSQ CL-LQP CL-LMT CL-EQP CL-ESQ IP68 IP67 IP68 IP68 IP68 3W 12W 1W 17W 7W 1200 lm 60 lm 700 lm 300 lm 1200 lm RGBW CW NW WW CW NW WW CW NW WW RGBW 10 0 20 0 40 0 10 0 20 0 40 0 90 0 16 0 26 0 40 0 26 0 40 0 g CL GmbH Cave ve Ligh ghti ting www.cavelighting.de

  17. ve of Han Tech chni nica cal l aspe pect cts of the e proj ojec ect Cave LED Light Luminaries Mechan anic ical al constr truc ucti tion Covers material clear optical polycarbonate LEXAN Resin LS2, UV-stabilized Housing Al-profile Housing covering Polymer Coating Housing color dark gray Side brace material stainless steel A2 / 1.4301 Distance between Al and steel parts min 0.5 mm Cable entry metal cable gland M12 Cable gland waterproof additionally internal sealed with silicone compound Metal parts (screws, nuts) stainless steel Parts sealing silicone O-ring IP rating IP68 / IEC 60529 Test conditions underwater 3 bar / 10 min Electr tric ical al parame mete ters rs Power supply voltage range 15VDC … 35VDC Nominal power supply voltage 24VDC Power supply regulation constant power Electrical protection overvoltage / 39VDC, wrong polarity Fuse no internal fuse, externally fused Specially designed for show cave installation; Safety requirements EN60598 g CL GmbH Cave ve Ligh ghti ting www.cavelighting.de

  18. ve of Han Tech chni nica cal l aspe pect cts of the e proj ojec ect Cave Cave Lighting Control Units CL-CN2 CL-CP2 CL-MMC Radio Receiver IP65 IP65 IP65 IP65 Multimedia LED luminaries Switching point Radio Remote Control Unit Control Unit Control Unit Control units provides the provides powering, provides user provides wireless audio and DMX brightness and light interaction control interactivity for signal source for scenes control for function within guiding control of sound and music LED luminaries with lighting installations. the system . illustrations. PWM dimming. g CL GmbH Cave ve Ligh ghti ting www.cavelighting.de

  19. ve of Han Tech chni nica cal l aspe pect cts of the e proj ojec ect Cave Power Cabinet High Voltage Low Voltage AC/DC Power modules Overvoltage Protection (SPD) Fiber optic cable Type II Network units Automation units (PLC or BK) Fuses UPS Relays Heater Fuses Backup Battery Overvoltage Protection (SPD) Type I+II AC In DC Out LAN GND/PE 400VAC 24VDC network g CL GmbH Cave ve Ligh ghti ting www.cavelighting.de

  20. ve of Han Tech chni nica cal l aspe pect cts of the e proj ojec ect Cave Development of the Grotte-de-Han project Kick-Off 2013 2013 g CL GmbH Cave ve Ligh ghti ting www.cavelighting.de

  21. ve of Han Tech chni nica cal l aspe pect cts of the e proj ojec ect Cave Basic definitions: Decision What color of light? Cool White General and 6300K artistic lights Neutral White General, artistic, 5000K pathway lights Warm White 3000K Color light Color light RGBW show g CL GmbH Cave ve Ligh ghti ting www.cavelighting.de

Download Presentation
Download Policy: The content available on the website is offered to you 'AS IS' for your personal information and use only. It cannot be commercialized, licensed, or distributed on other websites without prior consent from the author. To download a presentation, simply click this link. If you encounter any difficulties during the download process, it's possible that the publisher has removed the file from their server.

Recommend


More recommend