t own of east gwillimbury
play

T own of East Gwillimbury Water and Wastewater M aster Plan Public - PowerPoint PPT Presentation

1 T own of East Gwillimbury Water and Wastewater M aster Plan Public Information Centre #2 April 10, 2019 PROJECT INTRODUCTION 2 PURPOSE OF THE PROJECT The T own of East Gwillimbury is undertaking a T own-wide Water and Wastewater M aster


  1. 1 T own of East Gwillimbury Water and Wastewater M aster Plan Public Information Centre #2 April 10, 2019

  2. PROJECT INTRODUCTION 2 PURPOSE OF THE PROJECT The T own of East Gwillimbury is undertaking a T own-wide Water and Wastewater M aster Plan. The M aster Plan will identify long-term strategies for servicing the current and future populations, based on the projected growth for the T own to the year 2041. Problem Statement: The T own of East Gwillimbury is projected to experience significant population and employment growth over the next 25 years. As a result of this growth, a safe, e efficient, and r reliable source of water and wastewater services will become increasingly important and challenging. The Town’s water and wastewater systems will need to be expanded as necessary to accommodate this growth. M ASTER PLANNING PROCESS Complete a comprehensive review of background documentation, existing water and wastewater system and key relevant studies A M aster Plan is a l long term plan that provides a ‘roadmap’ of the water and wastewater infrastructure requirements based on the Identify opportunities and constraints to improve the water and existing and future growth projections to the year 2041. wastewater network based on existing and future populations. At the end of this study, the key deliverables will be: Calculate the future water and wastewater flows, and update the T own’s water and wastewater models 1. The completed M aster Plan Report documenting the preferred solution, process and analyses that were conducted. Develop alternative servicing solutions for future growth 2. A list of future infrastructure projects recommended for the T own to implement the M aster Plan, with high-level cost estimates and Evaluate the alternatives, using a set of criteria determined as part of the M aster Plan, to arrive at a preferred servicing solution timing. 3. A map indicating where these future infrastructure projects will be Prepare cost estimates and timing for recommended future located. infrastructure projects to implement the M aster Plan

  3. WHY ARE WE CONDUCTING THIS REVIEW? 3 PLANNED GROWTH The T own is undertaking a review of the 2009 Water and Wastewater M aster Plan to accommodate the T own’s current and projected growth and to ensure that sufficient servicing can be provided to facilitate growth to 2041. Since the Y ork Region water and sewer networks form a backbone to the East Gwillimbury networks, this M aster Plan builds on Y ork Region’s M aster Plan. The current M aster Plan also reflects updates to provincial policy. The settlement areas such as Green Lane West, Holland Landing, Sharon, Queensville and M ount Albert are intended to accommodate the T own’s forecasted growth. Provincial Growth Forecasts to the Y ear 2041 118,659 140,000 120,000 100,000 � Provincial Policy Statement, 2014 The Master Plan will be � 80,000 Growth Plan for the Greater Golden Horseshoe, 2017 Update 45,095 developed within the � Oak Ridges M oraine Plan, 2002 context of existing � 60,000 25,760 Y ork Region Official Plan, 2010 � Provincial, Regional, and Y ork Region Water and Wastewater M aster Plan, 2016 40,000 � 9,875 Lake Simcoe Protection Plan, 2009 local policies � East Gwillimbury Official Plan, 2010 20,000 � East Gwillimbury Water and Wastewater M aster Plan, 2009 0 2016 2041 Population Employment

  4. M UNICIP AL CLASS ENVIRONM ENTAL ASSESSM ENT 4 WHAT IS A M UNICIP AL CLASS EA The M unicipal Class Environmental Assessment (EA) was approved in 1990 under the Ontario Environmental Assessment Act as a way to streamline the planning of municipal infrastructure while managing environmental impacts, receive stakeholder and resident feedback, and ensure a transparent evaluation and decision process. The M unicipal Class EA Planning and Design process can include up to a total of 5 5 phases. The required phases to be completed are based on the type of study that is being conducted. At a minimum, a M aster Plan must follow the first 2 2 phases. Phases 3 through 5 are usually completed as part of a separate process when the time comes to implement the recommended infrastructure projects. The East Gwillimbury Water and Wastewater PIC #1 M aster Plan will be completed using Approach 1 of the Class EA M aster Planning process. This means that the study is We are here (PIC #2) conducted at a broad level and will result in a list of recommended infrastructure projects. Specific Class EA’s for Schedule B projects will be completed closer to the time of the project ’s implementation and after the M aster Plan is finalized.

  5. SCREENING OF AL TERNATIVE SOLUTIONS 5 The alternative solutions have been screened based on the following : � Policy and Regulation Compatibility – Does the alternative comply with the Provincial and T own policies related to growth management and land development? � Does the Solution Address the Problem Statement - Alternatives that do not address the Problem Statement do not satisfy the M aster Plan’s core objective to support future growth to 2041. Future planning policies and opportunities to provide water and wastewater servicing for existing and future development would not be adhered to in selecting this alternative. 2. Water Efficiency / Conservation 1. Do Nothing The T own currently has a Water Conservation strategy that limits This alternative represents a scenario where no improvements or Outdoor Water Use (By-Law 2002-100). Implementation of expansions would be undertaken. This alternative does not comply further water conservation and reduction strategies to reduce with Provincial and T own policy related to growth. With the “Do water consumption may have marginal benefits. Water Nothing” alternative, municipal water and wastewater efficiency/conservation does not address future development infrastructure will be inadequate for future development. requirements Policy/regulation compatibility? Address Problem Statement? Policy/regulation compatibility? Address Problem Statement? Y es (partial). No. No. No. 3. Limit Growth 4. Upgrade and Expand the Water and Wastewater S ystem Network This alternative involves restricting population growth within the The T own is responsible for the distribution of water and collection T own. Lower growth rates may ensure sufficient supply to of wastewater for residents and businesses. This alternative accommodate future demand. However, in line with the Provincial improves the existing water distribution system to address Growth Plan, Y ork Region has identified targets for intensification pressure and fire flow issues and expands the system to service for municipalities. The T own will be unable to meet its targets by new developments. It also improves the wastewater collection limiting growth. system preventing surcharge and services new developments. Policy/regulation compatibility? Address Problem Statement? Policy/regulation compatibility? Address Problem Statement? Y es. Y es. Y es (partial). No.

  6. EVALUATION OF AL TERNATIVES 6 EVALUATION CRITERIA NATURAL ENVIRONMENT SOCIAL & CUL TURAL • • Impact to water quality, built heritage areas and Proximity to environmentally sensitive and areas or archaeological importance designated natural areas (e.g. Oak Ridges M oraine, EVALUATION COLOUR Greenbelt) • Aesthetic impact on existing and proposed RATING S YS TEM • development Impact on existing natural environment feature (e.g. Species at Risk) M ost Preferred / Low Impact • Consistency with Land Use designations, approved • Development Plans, and proposed Land Use changes Impact on Areas of Natural and Scientific Interest (ANSI) • Traffic impacts during construction Preferred / Low to • Impact on watercourses and aquatic habitat M oderate Impact TECHNICAL ECONOMIC Less Preferred / • • Constructability, duration of construction and site Capital costs M oderate Impact access • Operation costs • Ease of connection to existing infrastructure and ease • of modifications required to existing infrastructure M aintenance costs Least Preferred / High Impact • System reliability, redundancy and hydraulic performance • M aintaining or enhancing security of supply • Additional servicing opportunities

  7. STUDY AREA 7 EXISTING WATER SYSTEM – CENTRAL GROWTH AREA Water projects outlined in the M aster Plan either address existing system deficiencies or are required due to growth. Within the Central Growth Area, three projects had alternative solutions which were assessed based on the criteria outlined on Board 6. Project alternatives are presented on B Board 9. Water Issue #1: Lower Fire Flows noted in the Queensville Sideroad/Sand Road Area Water Issue #2: There is currently only one watermain connection between the new Holland Landing subdivision and the existing system on Bradford Street

  8. STUDY AREA 8 EXISTING WATER SYSTEM – M OUNT ALBERT The only water projects required within M ount Albert were due to growth. One of the projects in M ount Albert had alternative solutions which were assessed based on the criteria outlined on Board 6. Project alternatives are presented on B Board 10. Water Issue #3: Servicing required for the new development south west of M ount Albert Road and Ninth Line Y ork Region is currently carrying out an Environmental Assessment (EA) to investigate Water Quality in this area.

Download Presentation
Download Policy: The content available on the website is offered to you 'AS IS' for your personal information and use only. It cannot be commercialized, licensed, or distributed on other websites without prior consent from the author. To download a presentation, simply click this link. If you encounter any difficulties during the download process, it's possible that the publisher has removed the file from their server.