T a pia Ra nc h Wa te r Supply Assig nme nt
BOARD OF DI RE CT ORS ME E T I NG JUL Y 17, 2018 I T E M 6.1
T a pia Ra nc h Wa te r Supply Assig nme nt BOARD OF DI RE CT - - PowerPoint PPT Presentation
T a pia Ra nc h Wa te r Supply Assig nme nt BOARD OF DI RE CT ORS ME E T I NG JUL Y 17, 2018 I T E M 6.1 Ove rvie w o f Anne xa tio n Pro c e ss Applic a tio n/ De po sit a nd F unding Ag re e me nt De te rmine pro je c
BOARD OF DI RE CT ORS ME E T I NG JUL Y 17, 2018 I T E M 6.1
unding Ag re e me nt
nitia te L AF CO pro c e ss
QA
c o nditio ns pre c e de nt (inc luding DWR Appro va l)
AF CO a ppro va l
405 Sing le F a mily Ho me s 85 Ac Co mmo n L a ndsc a pe d Are a
Se pte mb e r 2002 F
ina l E I R b y BV-RRB fo r pro je c t to c re a te supply b y re re g ula tio n o f hig h flo w K e rn Rive r wa te r
Oc to b e r 2006 F
ina l E I R b y CL WA fo r Ac q uisitio n
11,000 AF
fo r in se rvic e a re a de ma nd
4,735 AF fo r five a ntic ipa te d a nne xa tio ns (E stima te o f 750 AF fo r T a pia Ca nyo n)
Ma y 2007 Purc ha se Ag re e me nt e xe c ute d
2008 – Do wnturn in ho using ma rke t Only L
e g a c y e nte re d into De po sit a nd F unding Ag re e me nt
2008 – Wa ng e r De c isio n re duc e d SWP re lia b ility
Ag e nc y re se rve d a ll BV-RRB wa te r fo r in se rvic e a re a use
2012 – 3000 AF
ma de a va ila b le to L e g a c y a nd T e so ro Anne xa tio ns
2014 – T
a pia unde r ne w o wne rship a ppro a c he d Ag e nc y re a nne xa tio n
2016 – 2015 UWMP Ado pte d 2017 – De po sit a nd F
unding Ag re e me nt E xe c ute d fo r T a pia Ca nyo n
2018 – Wa te r Re so urc e s a nd Wa te rshe d Co mmitte e re vie we d BVRRB
wa te r supply a va ila b ility
Appro a c h
Sing le -fa mily ho me de ma nd b a se d o n lo t size a nd de ma nd fa c to rs fro m
a dja c e nt ne w c o nstruc tio n
Co mmo n la ndsc a pe a re a s b a se d o n de ve lo pe rs la ndsc a pe pla ns a nd
c urre nt la ndsc a ping o rdina nc e s
L
/ Yr
Anne xing De ve lopme nt Pote ntially Using BV- RRB Supplie s 2015 UWMP E stimate (AF Y) Curre nt E stimate (AF Y) L e gac y
2,500 2,500
T e soro
500 389
T a pia
575 489
T
3,575 3,378
Supply Sourc e Ave rage / Nor mal Single Dry- Ye a r 4- Ye a r Dr
3- Ye a r Dr
E xisting Gr
31,545 40,215 36,175 35,875
E xisting Re c yc le d
450 450 450 450
E xisting Impor te d
70,707 22,087 45,177 33,167
Ba nk/ E xc ha ng e s
7,950 7,950 7,950
F utur e Gr
10,230 20,335 21,875 21,325
F utur e Re c yc le d
9,604 9,604 9,604 9,604
F uture Bank/ E xc hange s
22,000 22,000 22,000
T
122,536 122,641 143,231 130,371
De mand w/ Ac tive Conse r vation
93,900 103,300 103,300 103,300
Surplus
28,636 19,342 39,931 27,071
Alte rna tive Wa te r Supply Sc e na rio s c a n b e e xplo re d b y re vie wing
the 2017 Wa te r Supply Re lia b ility Re po rt Upda te
Diffe rs fro m UWMP Ana lysis
E
mplo ys a study pe rio d o f 2017-2050
De ma nds inc re a se thro ug ho ut study pe rio d L
Wa te r b a nking / e xc ha ng e pro g ra ms a re o pe ra te d thro ug h 86
hydro lo g ic se q ue nc e s
Pro vide s pro b a b ilitie s o f me e ting wa te r de ma nds
BASE SCE NARIO: Base d on 2015 UWMP de mand, supply, and stor age pr
am assumptions
SCE NARI O A SCE NARI O B SCE NARI O C
Ba se sc e na rio with:
Wa te rF ix Ba se sc e na rio with:
re duc tio ns
re lia b ility
e ss inc re a se in Sa ug us pumping c a pa c ity a nd re c yc le d wa te r use Ba se sc e na rio with:
a rg e supply re duc tio ns
a rg e re duc tio n in SWP supply re lia b ility
g ro undwa te r supplie s a nd re c yc le d wa te r use
Sour c e Nor mal- Ye ar Single Dr y- Ye ar
Ba se Ca se Sc e na rio C Ba se Ca se Sc e na rio C Diffe re nc e SWP T a b le A 60,000 42,800 7,600 7,600 Ro se da le Ba nk N/ A N/ A 20,000 10,000 10,000 Ne wha ll Se mitro pic Ba nk N/ A N/ A 4,950 No t in Sc e na rio 4,950 Ne w Ba nk N/ A N/ A 5,000 No t in Sc e na rio 5,000 Alluvium 31,100 (Ma x) 29,000 (50% Pro b .) 31,100 (Ma x) 27,400 (50%Pro b .) 27,400 20,600 6,800 Sa ug us 10,700 10,700 33,200 10,700 22,500 T
49,250
Co nc lusio ns:
Sto ra g e pro g ra ms ra the r tha n a dditio na l supplie s Additio na l withdra wa l c a pa c ity fro m sto ra g e pro g ra ms
Ca n a c hie ve 95% re lia b ility g o a l thro ug h va rio us pro g ra ms a nd/ o r
c o mb ina tio ns o f pro g ra ms
Po te ntia l a c tio ns use d in re lia b ility e va lua tio n:
E
xisting Rig hts Ro se da le -Rio Bra vo Ba nking Pro g ra m
I
nc re a se d ta ke c a pa c ity to 20 T AF Y b y 2035
Ac c e ss to F
ive Po int Rig hts in Se mitro pic (Pa rt o f NR Spe c ific Pla n)
Cre a te Sa ug us F
Othe r pro g ra ms c o uld a c hie ve simila r re lia b ility re sults
T ype of Cost T apia Canyon Shar e
Ac q uisitio n Co st 706,109 Ca rrying Co st (2007-2018) 3,399,083 Wa te r Sa le s Cre dits 330,075 T
3,775,117
Suffic ie nt BV-RRB wa te r supply is a va ila b le unde r 2015 UWMP
pla nning a ssumptio ns
Unde r le ss o ptimistic pla nning a ssumptio ns, the Ag e nc y ha s
suffic ie nt a ve ra g e wa te r supplie s a nd dry-ye a r de ma nds c a n b e me t thro ug h inve stme nts in sto ra g e pro g ra ms
T
he Wa te r Re so urc e s a nd Wa te rshe d Co mmitte e re c o mme nds tha t the Bo a rd o f Dire c to rs a ppro ve a re so lutio n de te rmining tha t 489 a c re -fe e t pe r ye a r o f Bue na Vista -Ro se da le Rio Bra vo Wa te r Supply is a va ila b le fo r po ssib le use fo r the pro po se d T a pia Anne xa tio n.