system integrity matrix or pwsrcac matrix of vmt concerns
play

System Integrity Matrix or PWSRCAC Matrix of VMT Concerns By Tom - PowerPoint PPT Presentation

System Integrity Matrix or PWSRCAC Matrix of VMT Concerns By Tom Kuckertz & Anna Carey TOEM Commi8ee Tracking VMT Integrity Concerns System Integrity Project (5050) Report of status of selected integrity items/ issues difficult


  1. System Integrity Matrix or PWSRCAC Matrix of VMT Concerns By Tom Kuckertz & Anna Carey TOEM Commi8ee

  2. Tracking VMT Integrity Concerns • System Integrity Project (5050) • Report of status of selected integrity items/ issues difficult with confusing results • Big picture – System Integrity Matrix – Projects versus matrix categories • Selected systems (photos and commentary) • Long range planning (LRP) tool? • QuesQons and answers PWSRCAC September 2013 Board MeeQng

  3. Many complex systems exist at Valdez Marine Terminal PWSRCAC September 2013 Board MeeQng

  4. Status Report Describing System Integrity Project Items/Issues • Ad hoc list of integrity issues/items • Updated for each TOEM Commi8ee meeQng • Updates – Haphazard? – Unorganized? – Incomplete? – Confusing? • Detail good but “big picture” absent PWSRCAC September 2013 Board MeeQng

  5. System Integrity Matrix The “Big Picture” • 33 projects / issues / assets listed (3 pages) • 7 informaQonal a8ributes about each of the 33 projects – Alyeska project idenQficaQon – System – Issue – Alyeska acQon – PWSRCAC acQvity – Expected compleQon date – PWSRCAC level of concern PWSRCAC September 2013 Board MeeQng

  6. First Page of System Integrity Matrix Alyeska System Issue Alyeska AcFon Pending to PWSRCAC AcFvity WRT Expected PWSRCAC Project Address Issue Issue CompleFon Level of Date Concern (H, M., L) Z655 Secondary Containment Industrial Waste Water Sewer System Refurbish system engineering Concern over lengthy 2013, 2014 H (IWWS) cannot pass leak test specifics unknown. delays and C‐Plan Temporary fixes pending renewal coordinaQon permanent fixes Z655 Secondary Containment VerificaQon of CBA liner integrity Pending receipt of Golder Inquiry about 60% Unknown OpportunisQc vs. systemaQc tesQng Associates Report prevenQon credit for response planning standard ???? Power GeneraQon Turbine/Generator A ‐‐ OverheaQng Lube oil blockage fixed Monitoring Alyeska’s Unknown Possibly bearing acQviQes resolved Z711 Power GeneraQon Stack stability invesQgaQon Ongoing study Monitoring Alyeska’s Unknown L acQviQes Z709 Power GeneraQon Industrial Wastewater Sewer System InspecQon and repair Monitoring Alyeska’s 2013 and L tesQng and repair acQviQes annual ???? Vapor Compressor Worn motor Refurbished motor on site Monitoring Alyeska’s 2013 L and pending installaQon acQviQes Z683 Crude Oil Piping InspecQon of over‐water piping InspecQon of subset of Project 5590 2013? 2013 Berth insulaQon covered girth welds Inspectability of VMT 2014? on Berths 4 and 5 Piping W051 Crude Oil Piping InspecQon of buried piping Pending inspectability study Project 5590 2016, 2017 H and selecQon of inspecQon Inspectability of VMT technology Piping ???? Crude Oil Piping Alyeska’s In‐line‐inspecQon project/ Under iniQal development Inquire to observe 2015? H program at VMT Beta test 2013? engineering meeQngs 2016? Z559 Crude Oil Piping Berth 4 loading arms base (weep) Temporary repairs Monitoring Alyeska’s 2013, 2014 2 perm fix opQons under accomplished, permanent acQviQes consideraQon repair with new/refurbished arms 2014 PWSRCAC September 2013 Board MeeQng

  7. ParFal View of Secondary Containment at Tank 1 PWSRCAC September 2013 Board MeeQng

  8. Berth fire protecQon Secondary water supply to berths PWSRCAC September 2013 Board MeeQng

  9. One of the Three Main Diesel‐Powered Fire Water Pumps PWSRCAC September 2013 Board MeeQng

  10. Heavy Snow at the Valdez Marine Terminal PWSRCAC September 2013 Board MeeQng

  11. WinterQme OperaQons May Require Manual Removal of Snow from Tank Tops PWSRCAC September 2013 Board MeeQng

  12. Four loading arms and one vapor arm are visible on Berth 4. The tees at which ballast water piping separates from oil piping are also visible. Counter-weights are used to balance the arms during loading operations PWSRCAC September 2013 Board MeeQng

  13. Interior of a Large Ballast Water Treatment Tank PWSRCAC September 2013 Board MeeQng

  14. Interior of Crude Oil Storage Tank PWSRCAC September 2013 Board MeeQng

  15. Row of Five Large Vapor Compressors PWSRCAC September 2013 Board MeeQng

  16. Power Vapor Facility PWSRCAC September 2013 Board MeeQng

  17. East Tank Farm – 14 500,000‐BBL Tanks PWSRCAC September 2013 Board MeeQng

  18. Gravity SeparaQon Tanks for Treatment of Ballast Water in Winter PWSRCAC September 2013 Board MeeQng

  19. Gravity SeparaQon and Biological Treatment Tanks PWSRCAC September 2013 Board MeeQng

  20. Causeway Leading to Berth 5 PWSRCAC September 2013 Board MeeQng

  21. East Metering Facility Including Pig Trap and BackPressure Control System PWSRCAC September 2013 Board MeeQng

  22. Summary • Concerns should be soundly based upon technical knowledge of the system of interest • System Integrity Matrix provides the starQng point for understanding system of interest • Can the System Integrity Matrix be used as a tool to assist the long range planning process? PWSRCAC September 2013 Board MeeQng

  23. Three Ph.D.s Pondering Rock‐Slope Stability Are You Pondering the System Integrity Matrix? PWSRCAC September 2013 Board MeeQng

  24. QuesQons & Answers PWSRCAC September 2013 Board MeeQng

  25. End PWSRCAC September 2013 Board MeeQng

Download Presentation
Download Policy: The content available on the website is offered to you 'AS IS' for your personal information and use only. It cannot be commercialized, licensed, or distributed on other websites without prior consent from the author. To download a presentation, simply click this link. If you encounter any difficulties during the download process, it's possible that the publisher has removed the file from their server.

Recommend


More recommend