System Integrity Matrix
- r
System Integrity Matrix or PWSRCAC Matrix of VMT Concerns By Tom - - PowerPoint PPT Presentation
System Integrity Matrix or PWSRCAC Matrix of VMT Concerns By Tom Kuckertz & Anna Carey TOEM Commi8ee Tracking VMT Integrity Concerns System Integrity Project (5050) Report of status of selected integrity items/ issues difficult
PWSRCAC September 2013 Board MeeQng
PWSRCAC September 2013 Board MeeQng
PWSRCAC September 2013 Board MeeQng
– Alyeska project idenQficaQon – System – Issue – Alyeska acQon – PWSRCAC acQvity – Expected compleQon date – PWSRCAC level of concern
PWSRCAC September 2013 Board MeeQng
Alyeska Project System Issue Alyeska AcFon Pending to Address Issue PWSRCAC AcFvity WRT Issue Expected CompleFon Date PWSRCAC Level of Concern (H, M., L) Z655 Secondary Containment Industrial Waste Water Sewer System (IWWS) cannot pass leak test Refurbish system engineering specifics unknown. Temporary fixes pending permanent fixes Concern over lengthy delays and C‐Plan renewal coordinaQon 2013, 2014 H Z655 Secondary Containment VerificaQon of CBA liner integrity OpportunisQc vs. systemaQc tesQng Pending receipt of Golder Associates Report Inquiry about 60% prevenQon credit for response planning standard Unknown ???? Power GeneraQon Turbine/Generator A ‐‐ OverheaQng bearing Lube oil blockage fixed Monitoring Alyeska’s acQviQes Unknown Possibly resolved Z711 Power GeneraQon Stack stability invesQgaQon Ongoing study Monitoring Alyeska’s acQviQes Unknown L Z709 Power GeneraQon Industrial Wastewater Sewer System tesQng and repair InspecQon and repair Monitoring Alyeska’s acQviQes 2013 and annual L ???? Vapor Compressor Worn motor Refurbished motor on site and pending installaQon Monitoring Alyeska’s acQviQes 2013 L Z683 Crude Oil Piping InspecQon of over‐water piping 2013 Berth InspecQon of subset of insulaQon covered girth welds
Project 5590 Inspectability of VMT Piping 2013? 2014? W051 Crude Oil Piping InspecQon of buried piping Pending inspectability study and selecQon of inspecQon technology Project 5590 Inspectability of VMT Piping 2016, 2017 H ???? Crude Oil Piping Alyeska’s In‐line‐inspecQon project/ program at VMT Under iniQal development Beta test 2013? Inquire to observe engineering meeQngs 2015? 2016? H Z559 Crude Oil Piping Berth 4 loading arms base (weep) 2 perm fix opQons under consideraQon Temporary repairs accomplished, permanent repair with new/refurbished arms 2014 Monitoring Alyeska’s acQviQes 2013, 2014
PWSRCAC September 2013 Board MeeQng
PWSRCAC September 2013 Board MeeQng
Secondary water supply to berths
PWSRCAC September 2013 Board MeeQng
PWSRCAC September 2013 Board MeeQng
PWSRCAC September 2013 Board MeeQng
PWSRCAC September 2013 Board MeeQng
PWSRCAC September 2013 Board MeeQng
PWSRCAC September 2013 Board MeeQng
PWSRCAC September 2013 Board MeeQng
PWSRCAC September 2013 Board MeeQng
PWSRCAC September 2013 Board MeeQng
PWSRCAC September 2013 Board MeeQng
PWSRCAC September 2013 Board MeeQng
PWSRCAC September 2013 Board MeeQng
PWSRCAC September 2013 Board MeeQng
PWSRCAC September 2013 Board MeeQng
PWSRCAC September 2013 Board MeeQng
PWSRCAC September 2013 Board MeeQng
PWSRCAC September 2013 Board MeeQng
PWSRCAC September 2013 Board MeeQng