St. Bede School STREAM Space & Capital Improvements Updated 12/12/17 Agenda Overview Project Scope & Structure Timeline Preliminary Drawings Fundraising Project Scope STREAM Space Master Plan for School
SLIDE 1
SLIDE 2
Agenda Overview
- Project Scope & Structure
- Timeline
- Preliminary Drawings
- Fundraising
SLIDE 3
Project Scope
- STREAM Space
- Master Plan for School Wide Capital Improvements
SLIDE 4
Why are we planning this project? Maintain our status as one of the top 3 feeder schools for Central & Oakland Catholic:
- St. Bede
- Carlow Campus School
- Sacred Heart
Retain Existing Students Increase Enrollment
SLIDE 5
Parish Project Team Committee Structure Steering Committee
- Curriculum
- Facilities
- Marketing
- Fundraising & Development
SLIDE 6
Tours of Other Schools
- St. Louise de Marillac
- Central Catholic High School
- Vincentian Academy
- South Fayette
Recognized as the benchmark for STEM Curriculum & Facilities
SLIDE 7
Carnegie Science Center Partnership
- Teacher Training
- Curriculum Development
SLIDE 8
Design Team VEBH Architects – Dan Engen, AIA Tower Engineering – Jim Kosinski, PE
SLIDE 9
Design Approach
STREAM Space Design Master Planning Purpose Produce Detailed Design Drawings Strategic Planning &Capital Budgeting Location of Focus STREAM Space (1st) Entire School Facility Timeframe for Design 3 Months 3 Months Timeframe for Execution Next 9-12 Months 3-5 Years Deliverable Final Design Drawings to Build the project List of Capital projects with Costs, Priorities and General Drawings
SLIDE 10
Current Design Drawings
SLIDE 11
STREAM Floor Plan
SLIDE 12
Science Lab
SLIDE 13
Research Lab
SLIDE 14
Art Lab
SLIDE 15
Project Center
SLIDE 16
Master Planning – Future Projects
- Administrative Office Renovation & Security
Improvements
- Air Conditioning & HVAC Upgrades
- Window Replacement
- Roof Replacement
- Classroom Flooring, Lighting and Painting
- Bathroom Renovations
SLIDE 17
Stipulations on Proceeding with Project
- Diocese is very supportive of the project
- The Parish CANNOT take on debt
- Final Scope will be determined by funds raised
SLIDE 18
18 PowerPoint Timesaver
Project Schedule – Milestones
- Design – In progress, completion in January,
2018
- Construction – Summer, 2018
- Curriculum Development - Ongoing
- Fund Raising – Ongoing
Need Funding in Place by April 2018
SLIDE 19
How Much Will This Cost? STREAM Space Budget: $500,000 to $600,000
- Design & Fundraising occurring concurrently
- Producing design options to make the scope/cost fit
the budget
- Budget includes Construction costs and “Soft
Costs” (i.e. Design, Equipment, etc.)
SLIDE 20
How will the STREAM Space be paid for?
- Private Donations (specifically for this project)
- Grants
- PTG Funds
- Donations by Parishioners and Parents
Targeting fundraising completion by Spring 2018
SLIDE 21
- St. Bede School - STREAM Space