St. Bede School STREAM Space & Capital Improvements Updated 12/12/17 Agenda Overview Project Scope & Structure Timeline Preliminary Drawings Fundraising Project Scope STREAM Space Master Plan for School


slide-1
SLIDE 1
  • St. Bede School

STREAM Space & Capital Improvements

Updated 12/12/17

slide-2
SLIDE 2

Agenda Overview

  • Project Scope & Structure
  • Timeline
  • Preliminary Drawings
  • Fundraising
slide-3
SLIDE 3

Project Scope

  • STREAM Space
  • Master Plan for School Wide Capital Improvements
slide-4
SLIDE 4

Why are we planning this project? Maintain our status as one of the top 3 feeder schools for Central & Oakland Catholic:

  • St. Bede
  • Carlow Campus School
  • Sacred Heart

Retain Existing Students Increase Enrollment

slide-5
SLIDE 5

Parish Project Team Committee Structure Steering Committee

  • Curriculum
  • Facilities
  • Marketing
  • Fundraising & Development
slide-6
SLIDE 6

Tours of Other Schools

  • St. Louise de Marillac
  • Central Catholic High School
  • Vincentian Academy
  • South Fayette

Recognized as the benchmark for STEM Curriculum & Facilities

slide-7
SLIDE 7

Carnegie Science Center Partnership

  • Teacher Training
  • Curriculum Development
slide-8
SLIDE 8

Design Team VEBH Architects – Dan Engen, AIA Tower Engineering – Jim Kosinski, PE

slide-9
SLIDE 9

Design Approach

STREAM Space Design Master Planning Purpose Produce Detailed Design Drawings Strategic Planning &Capital Budgeting Location of Focus STREAM Space (1st) Entire School Facility Timeframe for Design 3 Months 3 Months Timeframe for Execution Next 9-12 Months 3-5 Years Deliverable Final Design Drawings to Build the project List of Capital projects with Costs, Priorities and General Drawings

slide-10
SLIDE 10

Current Design Drawings

slide-11
SLIDE 11

STREAM Floor Plan

slide-12
SLIDE 12

Science Lab

slide-13
SLIDE 13

Research Lab

slide-14
SLIDE 14

Art Lab

slide-15
SLIDE 15

Project Center

slide-16
SLIDE 16

Master Planning – Future Projects

  • Administrative Office Renovation & Security

Improvements

  • Air Conditioning & HVAC Upgrades
  • Window Replacement
  • Roof Replacement
  • Classroom Flooring, Lighting and Painting
  • Bathroom Renovations
slide-17
SLIDE 17

Stipulations on Proceeding with Project

  • Diocese is very supportive of the project
  • The Parish CANNOT take on debt
  • Final Scope will be determined by funds raised
slide-18
SLIDE 18

18 PowerPoint Timesaver

Project Schedule – Milestones

  • Design – In progress, completion in January,

2018

  • Construction – Summer, 2018
  • Curriculum Development - Ongoing
  • Fund Raising – Ongoing

Need Funding in Place by April 2018

slide-19
SLIDE 19

How Much Will This Cost? STREAM Space Budget: $500,000 to $600,000

  • Design & Fundraising occurring concurrently
  • Producing design options to make the scope/cost fit

the budget

  • Budget includes Construction costs and “Soft

Costs” (i.e. Design, Equipment, etc.)

slide-20
SLIDE 20

How will the STREAM Space be paid for?

  • Private Donations (specifically for this project)
  • Grants
  • PTG Funds
  • Donations by Parishioners and Parents

Targeting fundraising completion by Spring 2018