Stream Reclamation

Kirsty van Reenen, Senior Resource Advisor, Environmental Regulation

slide-2
SLIDE 2

Reclamation definition – new vs existing

  • Under the operative Regional

Freshwater Plan there is no definition

  • PNRP definition only relates to

reclamation in the coastal marine area. But Policy P102 provides some guidance: ‘the piping or covering of a stream for a distance greater than that required to form a reasonable crossing point is considered to be reclamation of the river bed.

slide-3
SLIDE 3

Reclamation rules – new vs existing

  • Under the PNRP non-

complying except in

  • utstanding lakes.
  • Under the operative Regional

Freshwater Plan largely discretionary

slide-4
SLIDE 4

Key Policies

Operative Regional Freshwater Plan

  • Policy 7.2.15 – reclamation is
  • nly to be carried out in

certain circumstances PNRP

  • Policy P102 – Reclamation

shall be avoided except in certain circumstances where there are no practicable alternatives and the reclamation is of an ephemeral flow path.

slide-5
SLIDE 5

Other PNRP Policies

Policy # Policy Content P9 Avoid a reduction in the extent or quality of public access… P19 Adverse effects on Maori values shall be minimised… P31 Aquatic ecosystem health shall be maintained or restored… P32 Significant adverse effects on aquatic ecosystem health and mahinga kai shall be managed by… P33 More than minor adverse effects on habitats for indigenous fish species shall be avoided… P40 Protect and restore ecosystems and habitats with significant indigenous biodiversity values… P41 Activities shall avoid ecosystems and habitats with significant indigenous biodiversity values… P42 Manage the adverse effects of use and development in surrounding areas …

slide-6
SLIDE 6

Scenarios

  • Reclamation which is offset with riparian planting
  • Channel diversion/re-location
  • Reclamation with mitigation through daylighting
slide-7
SLIDE 7

Issues and observations

  • Non-complying activity status

and the gateway test

  • No guidance on weighing up

the NPSUDC and protection policies

  • Mismatch with policy 8 –

beneficial activities