YOUR FUTURE CAMPUS OPEN SPACE + COMMUNITY INTEGRATION A range - - PowerPoint PPT Presentation

YOUR FUTURE CAMPUS OPEN SPACE + COMMUNITY INTEGRATION A range of spaces: from active plazas to natural contemplative areas Opportunities for the public as well as the campus community Plaza Amphitheater Recreation Field


slide-1
SLIDE 1

YOUR FUTURE CAMPUS

OPEN SPACE + COMMUNITY INTEGRATION

  • A range of spaces: from active plazas

to natural contemplative areas

  • Opportunities for the public as well

as the campus community Plaza Amphitheater Recreation Field Innovation District Informal Recreation Active Recreation Hiking/Biking Trails Refmective Space Key Campus Art Opportunity Key Outdoor Performance Space Key Outdoor Social Space Early Learning Center

slide-2
SLIDE 2

NET ZERO GOALS

ENERGY

  • Passive Building Design
  • Solar Panels
  • Effjcient Lighting
  • Geoexchange
  • Social and Tech Solutions
  • Per Capita Goals
  • Recycling, Compost, Trash

Sorting Stations

  • Low water volume plumbing fjxtures
  • Reuse of non-potable water
  • Native landscaping

WASTE WATER

slide-3
SLIDE 3

PHASE 1A CAMPUS INFRASTRUCTURE

SYSTEMS

  • Pumped Sewer
  • Condenser Lines
  • Water Mains
  • Storm Water Management
  • Amphitheater
  • Gravity Sewer
  • Data Conduits
  • Curb/Gutter
  • Sidewalks
  • Oval Green
  • Electrical Conduits
  • Parking
  • Streets

SUMMER 2019-2021

ACADEMIC BUILDING 2

slide-4
SLIDE 4

INVESTING IN CITY TRANSPORTATION INFRASTRUCTURE

New roundabout at SW Colorado

  • Ave. and Columbia St.

New Simpson Ave. pedestrian/bike path to Century Dr.

slide-5
SLIDE 5

COMING FALL 2021

ACADEMIC BUILDING 2 FEATURES

  • 50,000 sq. ft.
  • 10 Classrooms
  • 2 Flex Labs
  • Clinical Skills and

Treatment Classrooms

  • Makers Spaces for

Media, Engineering, Outdoor Products

  • Capstone Project Space
  • Event Space
  • Study Space
slide-6
SLIDE 6

30,000 TRUCK TRIPS SAVED

1,000 TRIPS

=

Estimated one-way truck trips saved during campus development Phase 1A as a result of landfill reclamation.

Maul Foster & Alongi 2017 landfill reclamation study.

slide-7
SLIDE 7

SW SIMPSON AVE MT WASHINGTON DR SW CENTURY DR SW CHANDLER AVE

REMEDIATION & RECLAMATION PHASING

OREGON STATE UNIVERSITY - CASCADES

FUTURE PHASE REMEDIATION (23.2 ACRES) PHASE 1 RELOCATED WASTE FUTURE PHASE RELOCATED WASTE PHASE 1 (6.2 ACRES) PHASE 1 RECLAMATION (44.2 ACres) PHASE 1 REMEDIATION (10.3 ACRES) AREA 1 AREA 2 AREA 3

slide-8
SLIDE 8

AREA 2 - 10.3 AC WASTE = 456,000 CY COVER SOIL = 24,000 CY AREA 3 - 39.4 AC WASTE = 838,000 CY COVER SOIL = 245,900 CY PUMICE MINE (44.2 AC) CONSTRUCTION & DEMOLITION DEBRIS LANDFILL AREA 1 - 23.2 AC WASTE = 1,133,500 CY COVER SOIL = 258,000 CY

SW SIMPSON AVE MT WASHINGTON DR SW CENTURY DR SW CHANDLER AVE

EXISTING CONDITIONS

OREGON STATE UNIVERSITY - CASCADES