your future campus
play

YOUR FUTURE CAMPUS OPEN SPACE + COMMUNITY INTEGRATION A range - PowerPoint PPT Presentation

YOUR FUTURE CAMPUS OPEN SPACE + COMMUNITY INTEGRATION A range of spaces: from active plazas to natural contemplative areas Opportunities for the public as well as the campus community Plaza Amphitheater Recreation Field


  1. YOUR FUTURE CAMPUS OPEN SPACE + COMMUNITY INTEGRATION • A range of spaces: from active plazas to natural contemplative areas • Opportunities for the public as well as the campus community Plaza Amphitheater Recreation Field Innovation District Informal Recreation Active Recreation Hiking/Biking Trails Refmective Space Key Campus Art Opportunity Key Outdoor Performance Space Key Outdoor Social Space Early Learning Center

  2. NET ZERO GOALS ENERGY WASTE WATER • Passive Building Design • Social and Tech Solutions • Low water volume plumbing fjxtures • Solar Panels • Per Capita Goals • Reuse of non-potable water • Effjcient Lighting • Recycling, Compost, Trash • Native landscaping • Geoexchange Sorting Stations

  3. PHASE 1A CAMPUS INFRASTRUCTURE SYSTEMS SUMMER 2019-2021 • Pumped Sewer • Condenser Lines • Water Mains • Storm Water Management • Amphitheater • Gravity Sewer • Data Conduits ACADEMIC • Curb/Gutter BUILDING 2 • Sidewalks • Oval Green • Electrical Conduits • Parking • Streets

  4. INVESTING IN CITY TRANSPORTATION INFRASTRUCTURE New Simpson Ave. pedestrian/bike path to Century Dr. New roundabout at SW Colorado Ave. and Columbia St.

  5. COMING FALL 2021 ACADEMIC BUILDING 2 FEATURES • 50,000 sq. ft. • 10 Classrooms • 2 Flex Labs • Clinical Skills and Treatment Classrooms • Makers Spaces for Media, Engineering, Outdoor Products • Capstone Project Space • Event Space • Study Space

  6. 30,000 TRUCK TRIPS SAVED Estimated one-way truck trips saved during campus development Phase 1A as a result of landfill reclamation. Maul Foster & Alongi 2017 landfill reclamation study. 1,000 = TRIPS

  7. SW SIMPSON AVE PHASE 1 PHASE 1 (6.2 ACRES) REMEDIATION (10.3 ACRES) AREA 3 PHASE 1 AREA 1 RELOCATED MT WASHINGTON DR WASTE FUTURE PHASE RELOCATED WASTE FUTURE PHASE AREA 2 REMEDIATION SW CENTURY DR (23.2 ACRES) PHASE 1 RECLAMATION SW CHANDLER AVE (44.2 ACres) REMEDIATION & RECLAMATION PHASING OREGON STATE UNIVERSITY - CASCADES

  8. SW SIMPSON AVE AREA 3 - 39.4 AC WASTE = 838,000 CY COVER SOIL = 245,900 CY MT WASHINGTON DR AREA 1 - 23.2 AC CONSTRUCTION & WASTE = 1,133,500 CY DEMOLITION DEBRIS LANDFILL AREA 2 - 10.3 AC COVER SOIL = 258,000 CY SW CENTURY DR WASTE = 456,000 CY COVER SOIL = 24,000 CY PUMICE MINE (44.2 AC) SW CHANDLER AVE EXISTING CONDITIONS OREGON STATE UNIVERSITY - CASCADES

Download Presentation
Download Policy: The content available on the website is offered to you 'AS IS' for your personal information and use only. It cannot be commercialized, licensed, or distributed on other websites without prior consent from the author. To download a presentation, simply click this link. If you encounter any difficulties during the download process, it's possible that the publisher has removed the file from their server.