State of Reliability Report
Preview of Key Findings
Mark Lauby, Senior Vice President and Chief Reliability Officer
State of Reliability Report Preview of Key Findings Mark Lauby, - - PowerPoint PPT Presentation
State of Reliability Report Preview of Key Findings Mark Lauby, Senior Vice President and Chief Reliability Officer Summary of Key Findings Excluding weather, the bulk-power system (BPS) remains within Adequate Level of Reliability (ALR)
Mark Lauby, Senior Vice President and Chief Reliability Officer
RELIABILITY | ACCOUNTABILITY 2
RELIABILITY | ACCOUNTABILITY 3
RELIABILITY | ACCOUNTABILITY 4
Misoperation Failed AC Substation Equipment Power System Condition Lightning Failed AC Circuit Equipment Weather, Excluding Lightning
0.1 0.11 0.12 0.13 0.14 0.15 0.16 0.17 0.18 0.19 0.2
0.02 0.04 0.06 0.08 0.1
Expected Transmission Outage Severity Correlation with Transmission Outage Severity
RELIABILITY | ACCOUNTABILITY 5
Significant Decrease in Forced Transmission Outages Resulting in Loss of Load
RELIABILITY | ACCOUNTABILITY 6
Eastern Interconnection Western Interconnection ERCOT Interconnection Québec Interconnection
RELIABILITY | ACCOUNTABILITY 7
RELIABILITY | ACCOUNTABILITY 8
5 10 15 20 25 30 35 40 45 2006 2007 2008 2009 2010 2011 2012 2013 2014
Number of EEA3 Events Year
EEA3 Events NERC-Wide
5 10 15 20 25 30 35 40 2006 2007 2008 2009 2010 2011 2012 2013 2014
Number of EEA3 Events
EEA3 Events by Region
FRCC MRO NPCC RF SERC SPP TRE WECC
RELIABILITY | ACCOUNTABILITY 9