State of Reliability Report Preview of Key Findings Mark Lauby, - PowerPoint PPT Presentation

State of Reliability Report Preview of Key Findings Mark Lauby, Senior Vice President and Chief Reliability Officer Summary of Key Findings Excluding weather, the bulk-power system (BPS) remains within Adequate Level of Reliability (ALR)


  1. State of Reliability Report Preview of Key Findings Mark Lauby, Senior Vice President and Chief Reliability Officer

  2. Summary of Key Findings • Excluding weather, the bulk-power system (BPS) remains within Adequate Level of Reliability (ALR) objectives  Weather continues to stress BPS reliability • No load loss due to cyber or physical security events • Average transmission outage severity declined • Significant decrease in transmission forced outages resulting in loss of load • Stable frequency response trend • Increased risk in protection system misoperations • Continued decline in Energy Emergency Alert Level 3 2 RELIABILITY | ACCOUNTABILITY

  3. Weather Stresses BPS Reliability 3 RELIABILITY | ACCOUNTABILITY

  4. Continued Decline in Average Transmission Outage Severity 0.2 Failed AC Substation 0.19 Equipment Power System 0.18 Condition 0.17 Expected Transmission Outage Severity Failed AC Circuit 0.16 Misoperation Equipment 0.15 Lightning 0.14 Weather, Excluding 0.13 Lightning 0.12 0.11 0.1 -0.1 -0.08 -0.06 -0.04 -0.02 0 0.02 0.04 0.06 0.08 0.1 Correlation with Transmission Outage Severity 4 RELIABILITY | ACCOUNTABILITY

  5. Significant Decrease in Forced Transmission Outages Resulting in Loss of Load 5 RELIABILITY | ACCOUNTABILITY

  6. Frequency Response Trend Stable Eastern Interconnection Western Interconnection ERCOT Interconnection Québec Interconnection 6 RELIABILITY | ACCOUNTABILITY

  7. No Load Loss Due To Physical or Cyber Security Events • BES Security Metric 1: Reportable Cyber Security Incidents  3 Reportable Cyber Security Incidents in 2014  None resulted in loss of load • BES Security Metric 2: Reportable Physical Security Events  47 reports of physical security threat events  9 caused physical damage or destruction  None resulted in loss of load 7 RELIABILITY | ACCOUNTABILITY

  8. Use of EEA Level 3 Continues to Decline 45 EEA3 Events NERC-Wide 40 Steady decline NERC-wide 35 Number of EEA3 Events 30 since 2011 25 20 15 10 5 0 2006 2007 2008 2009 2010 2011 2012 2013 2014 40 EEA3 Events by Region Year 35 Number of EEA3 Events 30 25 20 Overall regional rate 15 10 declining 5 0 2006 2007 2008 2009 2010 2011 2012 2013 2014 FRCC MRO NPCC RF SERC SPP TRE WECC 8 RELIABILITY | ACCOUNTABILITY

  9. 9 RELIABILITY | ACCOUNTABILITY

Download Presentation
Download Policy: The content available on the website is offered to you 'AS IS' for your personal information and use only. It cannot be commercialized, licensed, or distributed on other websites without prior consent from the author. To download a presentation, simply click this link. If you encounter any difficulties during the download process, it's possible that the publisher has removed the file from their server.