sp pd technical report consor5um weekly mee5ng
play

SP-PD Technical Report Consor5um Weekly Mee5ng 21 August, 2018 - PowerPoint PPT Presentation

SP-PD Technical Report Consor5um Weekly Mee5ng 21 August, 2018 David Warner Colorado State University Outline: APA/CE cables CE test stand plans Technical Board report Addi5onal ProtoDUNE running Schedule Design Reviews


  1. SP-PD Technical Report Consor5um Weekly Mee5ng 21 August, 2018 David Warner Colorado State University

  2. Outline: • APA/CE cables • CE test stand plans • Technical Board report – Addi5onal ProtoDUNE running – Schedule – Design Reviews – SP-PD WBS Cos5ng 8/21/18 D. Warner 2

  3. Dune FD Cable Rou5ng 8/21/18 D. Warner 3

  4. Pulling CE Cables Through APA Side tube 8/21/18 D. Warner 4

  5. Impact on PD • The conduit tube will be installed in the APA side tube aSer PD installa5on – It will not be possible to insert or remove PDs once the conduit is installed – We have requested that conduit installa5on be delayed un5l aSer the cold-box tes5ng at the ITF. – The conduit tube will not be full of cables un5l the APA stack is built underground. It may be possible to remove the conduit underground if problems are found in pre-installa5on tes5ng • This is a cri5cal area for the integra5on group to play a roll and keep an eye on this! 8/21/18 D. Warner 5

  6. Update on CE Test Stand Running • New design PD cable connectors installed in CE test stand APA • Moun5ng rails for up to 4 Supercells (1 full module, but split into 2 slots) in place • MPPCs in hand. First spin of moun5ng PCBs also in hand. Second spin (small repair from V1) will be in hand in ~ 2 weeks • Mechanical design complete • Filter plates for first 2 Supercells expected in August/ early September • Schedule requires PD modules in mid to late October-- 2 Supercells should be ready for the first run 8/21/18 D. Warner 6

  7. Running plans for CE test stand • We expect modified mu2e electronics and SSPs will be compared in the run – Funding for mu2e electronics s5ll cri5cal – Modified SSP (RJ-45 connectors, external HV) must be iden5fied for run • We expect the first run will allow head-to-head comparison of 2-sided ARAPUCA and X- ARAPUCAs • Opportuni5es exist for scien5fic involvement in the run (who is planning to analyze the results?) 8/21/18 D. Warner 7

  8. Addi5onal ProtoDUNE Running 8/21/18 D. Warner 8

  9. Possible benefits of addi5onal ProtoDUNE running to SP-PD: • Test full-scale ac5ve ganging • Full-scale test of new cabling scheme • Interference test with final CE system • Tes5ng of reflector foils? 8/21/18 D. Warner 9

  10. 8/21/18 D. Warner 10

  11. 8/21/18 D. Warner 11

  12. 8/21/18 D. Warner 12

  13. 8/21/18 D. Warner 13

Download Presentation
Download Policy: The content available on the website is offered to you 'AS IS' for your personal information and use only. It cannot be commercialized, licensed, or distributed on other websites without prior consent from the author. To download a presentation, simply click this link. If you encounter any difficulties during the download process, it's possible that the publisher has removed the file from their server.

Recommend


More recommend