Souther n R esident Killer Whale Wor kgr oup Co -Cha ir, PF - - PowerPoint PPT Presentation

souther n r esident killer whale wor kgr oup
SMART_READER_LITE
LIVE PREVIEW

Souther n R esident Killer Whale Wor kgr oup Co -Cha ir, PF - - PowerPoint PPT Presentation

Agenda Item E.4.a Supplemental SRKW WG Presentation 1 November 2019 Pho to : Ho lly F e a rnb a c h, NOAA Souther n R esident Killer Whale Wor kgr oup Co -Cha ir, PF MC Ad Ho c SRKW Wo rkg ro up Je ro my Jo rding , NOAA s NMF S


slide-1
SLIDE 1

1

Souther n R esident Killer Whale Wor kgr

  • up

Upda te o n Dra ft Sa lmo n F ishe ry Risk Asse ssme nt

Agenda Item E.4.a Supplemental SRKW WG Presentation 1 November 2019

Co -Cha ir, PF MC Ad Ho c SRKW Wo rkg ro up Je ro my Jo rding , NOAA’ s NMF S WCR SF D

Pho to : Ho lly F e a rnb a c h, NOAA

slide-2
SLIDE 2

2

Over view

2

  • I

n April 2019 the Co unc il ta ske d a n Ad -Ho c Wo rkg ro up with re a sse ssing the e ffe c ts o f Co unc il-a re a o c e a n sa lmo n fishe rie s o n So uthe rn Re sid e nt K ille r Wha le s a nd po te ntia lly re c o mme nd c o nse rva tio n me a sure (s) o r ma na g e me nt to o l(s), tha t limit Co unc il fishe ry impa c ts

  • n Chino o k sa lmo n pre y a va ila b ility fo r SRK

W.

T he Wo rkg ro up inc lude s re pre se nta tive s fro m We st Co a st trib e s; the sta te s o f Ca lifo rnia , Ore g o n, Wa shing to n, a nd I da ho ; the PF MC; a nd NMF S’ We st Co a st Re g io n, No rthwe st F ishe rie s Sc ie nc e Ce nte r, a nd So uthwe st F ishe rie s Sc ie nc e Ce nte r.

T he Wo rkg ro up g a ve its la st upda te a t the Co unc il’ s Se pte mb e r 2019 me e ting

slide-3
SLIDE 3

3

Ad-Hoc Wor kgr

  • up Schedule

Pro g re ss to da te

Sinc e the Se pte mb e r Co unc il me e ting the Wo rkg ro up ha s he ld a n a dditio na l two -da y me e ting a nd two we b ina rs to a ddre ss the Co unc il's q ue stio ns fro m the Se pte mb e r me e ting , furthe r its a na lysis, a nd pro g re ss to wa rds fina lizing its risk a sse ssme nt a nd re c o mme nda tio ns. Suppo rting ma te ria ls ha ve b e e n po ste d o nline fo r pub lic disse mina tio n.

https:/ / www.fishe rie s.no a a .g o v/ we st-c o a st/ so uthe rn-re side nt-kille r-wha le s- a nd -fishe rie s-inte ra c tio n-wo rkg ro up

E a c h wo rkg ro up me e ting thus fa r, inc luding we b ina rs, ha s a llo we d fo r multiple pub lic input

  • ppo rtunitie s.
slide-4
SLIDE 4

4

Updated R isk Assessment

4

slide-5
SLIDE 5

5

Components r eviewed at September meeting

 Se c tio n 1: I

ntro duc tio n

Se c tio n 2: Sta tus o f the SRK

W

Se c tio n 3: SRK

W a nd Chino o k Sa lmo n F ishe rie s

Se c tio n 4: PF

MC Sa lmo n F ishe rie s de sc riptio n

Se c tio n 5: Risk Asse ssme nt

L ink to Se pte mb e r Co unc il me e ting pre se nta tio n:

https:/ / www.pc o unc il.o rg / wp-c o nte nt/ uplo a ds/ 2019/ 09/ F 3a _Sup_NMF S_SRK W_PPT 1_SE PT 2019BB.pd f

slide-6
SLIDE 6

6

Added Components

Chapte r 3: SRKW AND CHINOOK SAL MON F ISHE RIE S

Re o rde re d Cha pte r 3 to no w inc lude the summa ry de sc riptio n o f NMF S’ 2009 b io lo g ic a l o pinio n a nd 2019 a sse ssme nt o f fishe rie s impa c ts o n SRKW.

Chapte r 4: PF MC Salmon F ishe r ie s De sc r iption

Cha pte r 4 no w ha s e le me nts c a pturing pa st pe rfo rma nc e

  • f the Sa lmo n F

MP fro m 1992 thro ug h 2016, inc luding g ra phs o f Chino o k sa lmo n a b unda nc e a nd ha rve st.

Chapte r 5: Risk Asse ssme nt

Cha pte r 5 ha s a full de sc riptio n o f me tho do lo g y, a lo ng with a ppe ndic e s whic h:

  • E

stima te re duc tio ns in Chino o k sa lmo n a b unda nc e b y time a nd a re a tha t a re a ttrib uta b le to Co unc il-a re a

  • c e a n sa lmo n fishe rie s.
  • E

stima te the c ha ng e s in pre dic te d vita l SRKW ra te s using the fitte d sta tistic a l re la tio nships pre dic t fo r Chino o k sa lmo n a b unda nc e s with a nd witho ut the re duc tio ns in a b unda nc e e stima te d fro m Co unc il- a re a o c e a n sa lmo n fishe rie s

slide-7
SLIDE 7

7

Added Components

Chapte r 5: Risk Asse ssme nt

  • An a dditio na l ‘ la g -time ’ c o mpo ne nt o f Chino o k a b unda nc e wa s a dde d to the e va lua tio n o f SRKW surviva l,

a s ha d pre vio usly b e e n do ne o nly fo r fe c undity. T he de c isio n to c o nside r this te mpo ra l la g wa s b a se d o n linking fo o d supply to future pe rfo rma nc e , a nd wa s a lso a dde d to a c c o unt fo r so me unc e rta inty in the timing o f SRKW mo rta lity e ve nts. T his a ppro a c h is c o nsiste nt with the me tho ds use d a nd re vie we d during b ila te ra l NMF S – DF O wo rksho ps in 2011-2012.

  • A c luste ring a na lysis whic h g ro upe d ye a rs o f simila r SRK

W de mo g ra phic pe rfo rma nc e wa s a lso pe rfo rme d. T his c luste ring wa s do ne inde pe nde nt o f Chino o k sa lmo n a b unda nc e , a nd ma y b e use ful in ide ntifying pa st pe rio ds o f g re a te r o r le sse r risk fo r the SRKW po pula tio n.

  • We a lso b e g a n e xplo ring q ua lita tive c o mpo ne nts to inc o rpo ra te into the a sse ssme nt, a nd b e g a n a sse ssing

fishe ry e ffe c ts b y the sa me stra tific a tio ns de ve lo pe d a nd de sc rib e d a b o ve .

  • T

he Wo rkg ro up sub mitte d o ur me tho do lo g y a nd ma te ria ls use d to da te fo r re vie w b y the Sc ie ntific a nd Sta tistic a l Co mmitte e (SSC). T his will a llo w the SSC time to c o nside r o ur a ppro a c h a nd pro vide c o mme nts to the Co unc il he re a t the No ve mb e r me e ting .

slide-8
SLIDE 8

8

Added Components

  • Appe ndix A: in Se pte mb e r Dra ft
  • Chino o k sa lmo n sto c ks e xc lude d fro m the Asse ssme nt
  • Appe ndix B: in Se pte mb e r Dra ft
  • Ab unda nc e mo de ls fo r so uthe rn sto c ks
  • Appe ndix C: ne w
  • Re g re ssio n mo de l o utput fig ure s fo r a ll 126 re la tio nships
  • Appe ndix D: ne w
  • Cluste ring Ana lysis de ta ils
  • Appe ndix E

: ne w

  • F

ishe ry Re duc tio n de ta ils

Pho to b y J. Ko e ppe n F / V L ulu

slide-9
SLIDE 9

9

Still left to do

Dur ing the last 6 months

Wo rkg ro up ha s:

  • Do c ume nte d the c urre nt sta tus o f the SRKW

DPS

  • De sc rib e d a nd re vie we d prio r e va lua tio ns o f

SRKW a nd Chino o k sa lmo n fishe ry inte ra c tio ns

  • Ca pture d the pro c e ss b y whic h the Sa lmo n

F MP o pe ra te s

  • De ve lo pe d me tho do lo g y to e xa mine

a b unda nc e a g g re g a te s o f Chino o k sa lmo n in spe c ific a re a s o f the o c e a n b a se d o n distrib utio ns infe rre d fro m the mo st re c e nt mo de ling e ffo rts (She lto n e t a l. 2019), a c ro ss thre e time ste ps to e xa mine po te ntia l re la tio nships to SRK W de mo g ra phic c rite ria

  • E

xa mine SRK W de mo g ra phic pe rfo rma nc e to ide ntify pa st pe rio ds o f g re a te r o r le sse r risk fo r the SRKW po pula tio n

L e ft to do

  • De sc rib e c urre nt fishe ry ma na g e me nt o f Co unc il fishe rie s a nd pro vide

a g e ne ra l de sc riptio n o f Co unc il o c e a n sa lmo n fishe rie s.

  • I

nte g ra te a nd synthe size the info rma tio n into like ly po ssib le e ffe c ts fro m Co unc il sa lmo n fishe rie s o n SRKW a nd ho w tha t mig ht a ffe c t c urre nt sta tus (a lo ng with inc o rpo ra ting po ssib le re c o mme nda tio ns fro m the SSC).

  • Pro vide po te ntia l re c o mme nda tio ns fo r F

MP ma na g e me nt me a sure s b a se d o n the I nte g ra tio n a nd Synthe sis o utc o me a s ne e de d. [T he se se c tio ns a re de sc rib e d a s ‘ Pe nding ’ in c urre nt risk a sse ssme nt dra ft]

Pho to b y R. L e ub e rt

slide-10
SLIDE 10

10 10

Cur r ent Wor kgr

  • up

r ec ommendation

Continue our wor k

T he Wo rkg ro up re c o mme nds c o ntinuing its wo rk po st the 2019 No ve mb e r me e ting , to c o mple te its ta sk to info rm NMF S o n the e ffe c ts o f Co unc il-a re a o c e a n sa lmo n fishe rie s o n the Chino o k sa lmo n pre y b a se o f SRKW in b o th q ua ntita tive a nd q ua lita tive ma nne rs, a nd to po te ntia lly re c o mme nd c o nse rva tio n me a sure (s) o r ma na g e me nt to o l(s), tha t limit the fishe ry’ s impa c ts o n pre y a va ila b ility fo r SRK W. T

  • do so , the Wo rkg ro up ide ntifie d thre e da te s a fte r the

No ve mb e r Co unc il me e ting , with the inte nt to c o mple te the a ssig ne d ta sk a nd a llo w time fo r sub mitting its fina l re po rt fo r c o nside ra tio n a t the Ma rc h 2020 Co unc il me e ting . T he da te s a re :

  • De c e mb e r 10, 2019
  • Ja nua ry 8-9, 2020
  • F

e b rua ry 4, 2020

10

Pho to b y Jill / Blue Mo o nb e am Studio

slide-11
SLIDE 11

11

T HANK YOU

QUE

ST I ONS?