Southeast Galt School Closure Review Public Consultation Session #4 October 16, 2012 Presentation Outline Background Information ARCs work to date Preferred Option Phasing Next Steps Study Area Existing Schools: Holy
Presentation Outline
- Background Information
- ARC’s work to date
- Preferred Option
- Phasing
- Next Steps
Study Area
Existing Schools:
- Holy Spirit
- St. Ambrose
- St. Anne
- St. Francis
- St. Vincent de Paul
Future School Site:
- Southeast Galt
Goals
- Determine the ideal long‐term location and size for each
Southeast Galt school.
- Determine long‐term enrolment boundaries within the Southeast
Galt Planning Area to balance enrolment amongst the schools.
- Explore the long‐term sustainability of the schools in Southeast
Galt with particular focus on the impact of small schools.
- Establish the boundary and size of a new elementary school east
- f Dundas Street.
Goals
- Address site size and/or facility issues at St. Ambrose, St. Francis
and St. Vincent de Paul.
- Determine how the full day kindergarten program can be fully
implemented by 2014.
- Maximize the number of walkers.
Work to Date
Public Consultation
School Council Presentations
- November 2011
- Background Information
Public Consultation Session #1
- February 28, 2012
- Background information
- School Information
Profiles Public Consultation Session #2
- April 24, 2012
- 11 Preliminary options
Public Consultation Session #3
- June 12, 2012
- 5 revised options
presented
Options
The ARC has reviewed 30+ options
- Boundary change only (no closures, with/without a new
school)
- One closure (with/without a new school)
- Two closure (with/without a new school)
- Three closure (with a new school and the purchase of Lincoln
Avenue Public School) Holy Spirit & St. Vincent de Paul are not being considered for closure.
Preferred Option
The ARC took a variety of information into consideration including:
- Public input
- Costs
- How well each option met the goals of the review
– Enrolment vs. Capacity – Transportation/Walkability – Facility and/or site issues – School size
- Ability to attract students to Catholic schools
Narrowing down the Options
Preferred Option
- Each school would receive a
major renovation or addition – every student will have an upgraded school.
- Purchase & renovate Lincoln
Avenue P.S.
- Major addition/ renovation or re‐
build St. Vincent de Paul.
- Addition to Holy Spirit.
- New school east of Dundas St.
- All construction projects are
dependant upon receiving Ministry funding.
Preferred Option
- Eliminates facility and site size
issues at St. Francis and St. Ambrose.
- All schools are approximately
the same size around 400‐600 pupil places.
- Eliminates small schools.
- A long term option.
Preferred Option
- Schools are distributed across
the Southeast Galt area with the majority of capacity towards the south end where the highest concentration of students live.
- Maximizes walkability over the
long term.
Walking Webs ‐ Existing
- 1.6km walk
distance shown
- n map.
- High
concentration of students living in the south end.
- Lincoln Ave. P.S. is
located very close to St. Anne but allows approx. 70 more students to walk (using the 1.6km walking distance).
Walking Webs ‐ Preferred Option
Phasing
Phase 1
- Purchase &
renovate Lincoln Avenue P.S.
- Close St. Anne and
- St. Ambrose
- All students move
to the new Lincoln Ave Catholic School Approximate Timing: September 2014
Phase 2
- Renovate and add
an addition to St. Vincent de Paul.
- Close St. Francis.
- Area I moves to
Lincoln Ave.
- Area J moves to
- St. Vincent de
Paul. Approximate Timing: September 2015
Phase 3
- Build a new 450
pupil place school in the new Southeast Galt Community.
- Areas G, H, Q2, R,
S, T, & U move to the new school.
- Grandparent Gr.8
students – no transportation. Approximate Timing: September 2017
Next Steps
Initiate Review & Form ARC (Nov. 14/11) School Information Profiles Public Consultation #1 (Feb. 28, 2012) Preliminary Options Public Consultation #2 (April 24, 2012) Revise Options Public Consultation #3 (June 12, 2012) Preferred Option & Recommendati
- ns
Public Consultation #4 (October 16, 2012) ARC Final Report to Director of Education Director’s Report to Board 3 Board Meetings (Nov 2012‐Jan 2013)
Review Process
Upcoming Board Meetings
- The Board of Trustees is responsible for making the final
- decision. All board meetings are public meetings. The
Southeast Galt School Closure Review will be discussed at the following Board meetings.
- November 26, 2012—The final report of the ARC will be
presented along with the recommendations. Delegations.
- December 17, 2012—The Board of Trustees may ask staff
questions of clarification. Delegations.
- January 28, 2012—The Board of Trustees is scheduled to
vote and make a final decision. No delegations.
- Delegations must register in advance to present to the Board.