Southeast Galt School Closure Review Public Consultation Session #4 October 16, 2012 Presentation Outline Background Information ARCs work to date Preferred Option Phasing Next Steps Study Area Existing Schools: Holy


slide-1
SLIDE 1

Southeast Galt School Closure Review

Public Consultation Session #4 October 16, 2012

slide-2
SLIDE 2

Presentation Outline

  • Background Information
  • ARC’s work to date
  • Preferred Option
  • Phasing
  • Next Steps
slide-3
SLIDE 3

Study Area

Existing Schools:

  • Holy Spirit
  • St. Ambrose
  • St. Anne
  • St. Francis
  • St. Vincent de Paul

Future School Site:

  • Southeast Galt
slide-4
SLIDE 4

Goals

  • Determine the ideal long‐term location and size for each

Southeast Galt school.

  • Determine long‐term enrolment boundaries within the Southeast

Galt Planning Area to balance enrolment amongst the schools.

  • Explore the long‐term sustainability of the schools in Southeast

Galt with particular focus on the impact of small schools.

  • Establish the boundary and size of a new elementary school east
  • f Dundas Street.
slide-5
SLIDE 5

Goals

  • Address site size and/or facility issues at St. Ambrose, St. Francis

and St. Vincent de Paul.

  • Determine how the full day kindergarten program can be fully

implemented by 2014.

  • Maximize the number of walkers.
slide-6
SLIDE 6

Work to Date

slide-7
SLIDE 7

Public Consultation

School Council Presentations

  • November 2011
  • Background Information

Public Consultation Session #1

  • February 28, 2012
  • Background information
  • School Information

Profiles Public Consultation Session #2

  • April 24, 2012
  • 11 Preliminary options

Public Consultation Session #3

  • June 12, 2012
  • 5 revised options

presented

slide-8
SLIDE 8

Options

The ARC has reviewed 30+ options

  • Boundary change only (no closures, with/without a new

school)

  • One closure (with/without a new school)
  • Two closure (with/without a new school)
  • Three closure (with a new school and the purchase of Lincoln

Avenue Public School) Holy Spirit & St. Vincent de Paul are not being considered for closure.

slide-9
SLIDE 9

Preferred Option

slide-10
SLIDE 10

The ARC took a variety of information into consideration including:

  • Public input
  • Costs
  • How well each option met the goals of the review

– Enrolment vs. Capacity – Transportation/Walkability – Facility and/or site issues – School size

  • Ability to attract students to Catholic schools

Narrowing down the Options

slide-11
SLIDE 11

Preferred Option

  • Each school would receive a

major renovation or addition – every student will have an upgraded school.

  • Purchase & renovate Lincoln

Avenue P.S.

  • Major addition/ renovation or re‐

build St. Vincent de Paul.

  • Addition to Holy Spirit.
  • New school east of Dundas St.
  • All construction projects are

dependant upon receiving Ministry funding.

slide-12
SLIDE 12

Preferred Option

  • Eliminates facility and site size

issues at St. Francis and St. Ambrose.

  • All schools are approximately

the same size around 400‐600 pupil places.

  • Eliminates small schools.
  • A long term option.
slide-13
SLIDE 13

Preferred Option

  • Schools are distributed across

the Southeast Galt area with the majority of capacity towards the south end where the highest concentration of students live.

  • Maximizes walkability over the

long term.

slide-14
SLIDE 14

Walking Webs ‐ Existing

  • 1.6km walk

distance shown

  • n map.
  • High

concentration of students living in the south end.

slide-15
SLIDE 15
  • Lincoln Ave. P.S. is

located very close to St. Anne but allows approx. 70 more students to walk (using the 1.6km walking distance).

Walking Webs ‐ Preferred Option

slide-16
SLIDE 16

Phasing

slide-17
SLIDE 17

Phase 1

  • Purchase &

renovate Lincoln Avenue P.S.

  • Close St. Anne and
  • St. Ambrose
  • All students move

to the new Lincoln Ave Catholic School Approximate Timing: September 2014

slide-18
SLIDE 18

Phase 2

  • Renovate and add

an addition to St. Vincent de Paul.

  • Close St. Francis.
  • Area I moves to

Lincoln Ave.

  • Area J moves to
  • St. Vincent de

Paul. Approximate Timing: September 2015

slide-19
SLIDE 19

Phase 3

  • Build a new 450

pupil place school in the new Southeast Galt Community.

  • Areas G, H, Q2, R,

S, T, & U move to the new school.

  • Grandparent Gr.8

students – no transportation. Approximate Timing: September 2017

slide-20
SLIDE 20

Next Steps

slide-21
SLIDE 21

Initiate Review & Form ARC (Nov. 14/11) School Information Profiles Public Consultation #1 (Feb. 28, 2012) Preliminary Options Public Consultation #2 (April 24, 2012) Revise Options Public Consultation #3 (June 12, 2012) Preferred Option & Recommendati

  • ns

Public Consultation #4 (October 16, 2012) ARC Final Report to Director of Education Director’s Report to Board 3 Board Meetings (Nov 2012‐Jan 2013)

Review Process

slide-22
SLIDE 22

Upcoming Board Meetings

  • The Board of Trustees is responsible for making the final
  • decision. All board meetings are public meetings. The

Southeast Galt School Closure Review will be discussed at the following Board meetings.

  • November 26, 2012—The final report of the ARC will be

presented along with the recommendations. Delegations.

  • December 17, 2012—The Board of Trustees may ask staff

questions of clarification. Delegations.

  • January 28, 2012—The Board of Trustees is scheduled to

vote and make a final decision. No delegations.

  • Delegations must register in advance to present to the Board.
  • A notice will be sent to all families outlining the process.
slide-23
SLIDE 23

Questions?

For more information visit www.wcdsb.ca Comments can be submitted any time during this review planning@wcdsb.ca