South San Francisco Bay Shoreline Project Water 101 Academy, Session 3 April 1, 2020 Presented by: Sunshine V. Julian, Capital Engineering Manager 2 Agenda Shoreline Phase I Authorized Project B v a l l e y w a t e r. o r g


  1. South San Francisco Bay Shoreline Project Water 101 Academy, Session 3 – April 1, 2020 Presented by: Sunshine V. Julian, Capital Engineering Manager

  2. 2 Agenda • Shoreline Phase I  Authorized Project B v a l l e y w a t e r. o r g  Project Need  Schedule • Shoreline Phase II  Feasibility Study Alviso Post Office, 1983

  3. 3 v a l l e y w a t e r. o r g

  4. Authorized Project – Phase 1 (EIA 11) 4 MHHW ML MHW MT L W L NOT T O SCAL E N A9 T IE S INT O ACCRE DIT E D L E VE E A14 A15 v a l l e y w a t e r. o r g A10 A18 E c otone A13 A11 2 1 L E VE E A12 WAST E WAT E R F ACIL IT Y AL VISO ADVANCE D WAT E R T IE S INT O PURIF ICAT ION ACCRE DIT E D L E VE E CE NT E R L e ve e E c otone (tr ansitional habitat) T idal Habitat Re stor ation Union Pac ific Railr oad Cr ossing 1 Ar te sian Slough Cr ossing 2

  5. Authorized Project – Phase 1 (EIA 11) Project Components  Flood Risk Management • 4-miles of levee to protect from coastal flooding and rising seas • Manages flood risk for population of ~5,500, ~1,100 structures, & regional wastewater facility  Ecosystem Restoration • 2,900 acres of tidal wetlands including ecotone (transitional habitat)  Recreation • Provides key connections to San Francisco Bay Trail & viewpoints

  6. Project Need – Flood Risks 6 A18 Inte r me diate SL C Sc e nar io Inundation A16 Map (YR50- 11.6ft NAVD88) v a l l e y w a t e r. o r g WAST E WAT E R F ACIL IT Y A12 SINGL E - F AMIL Y RE SIDE NT IAL COMME RCIAL / INDUST RIAL F IREDE PART ME NT ADVANCE D WAT E R L IBRARY PURIF ICAT ION CE NT E R CHUR CH E L ME NT ARY SCHOOL SR237 HIGH T E CH/ R&D BUIL DINGS MOBIL E HOMEPARK SINGL E F AMIL Y/ MUL T I- F AMIL Y R E SIDE NT IAL MOBIL E HOMEPARK COMME RCIAL / INDUST RIAL MANUF ACT URING

  7. Project Need – Flood Risk Management

  8. 8 Project Need - Recreation v a l l e y w a t e r. o r g Photo by Judy Irving, Pelican Media 10

  9. Post-Project Recreation Access 9 v a l l e y w a t e r. o r g

  10. Ecotone & Levee Cross-Section Upland Sea Level Rise of 2.59 feet Engineered Levee Grassland Projection for 2067 16 foot top width 3:1 Side Slope 15.2 feet High high Middle High Low Middle Low Existing Pond Marsh Marsh Marsh Marsh Marsh Marsh Existing Berm Intertidal Shallow Intertidal Mudflat Subtidal Mudflat 9

  11. A9 First Phase A14 A15 (2019-2023) A18 Reach 5 A10 Reach 4 Second Phase A13 A11 Reaches (2027) 2 & 3 A12 Wastewater Third Phase Facility First Phase Reach 1 (2032) Second Phase Third Phase Alviso

  12. 12 Shoreline Phase I Schedule • July-November 2019: Delivered fill for Reaches 1-3 • December 2019: Advertised Reaches 1-3 for Construction v a l l e y w a t e r. o r g • April 2020: 30% design to be completed for Reaches 4-5 • May 2021: Complete design for Reaches 4-5 • December 2021: Advertise construction of Reaches 4-5

  13. Shoreline Phase II  Flood Risk Management  Ecosystem Restoration  Recreation

  14. Shoreline Phase II 14 v a l l e y w a t e r. o r g

  15. Questions New Chicago Marsh, Alviso. Photo credit: Cris Benton

Download Presentation
Download Policy: The content available on the website is offered to you 'AS IS' for your personal information and use only. It cannot be commercialized, licensed, or distributed on other websites without prior consent from the author. To download a presentation, simply click this link. If you encounter any difficulties during the download process, it's possible that the publisher has removed the file from their server.