smart energy
play

Smart Energy Lets build a beautiful world around Private & - PowerPoint PPT Presentation

TLA INTERNATIONAL ENERGY CONFERENCE-2016 15 th April, India Habitat Center, New Delhi. Smart Energy Lets build a beautiful world around Private & Confidential, (c) Antriksh Photonergy 1 Walk in to Future New Delhi, India, Monday, 15 th


  1. TLA INTERNATIONAL ENERGY CONFERENCE-2016 15 th April, India Habitat Center, New Delhi. Smart Energy Let’s build a beautiful world around Private & Confidential, (c) Antriksh Photonergy 1

  2. Walk in to Future New Delhi, India, Monday, 15 th April 2035 DARK HUMER NEWS NETWORK Today’s Highlights : - Life Tax rate increased to 55.5 % Today’s Life Rate : - Crimination is banned, upto 50 lacs penalty imposed and Drinking Water - Rs. 5000.00 (Normal) 10 years imprisonment Rs. 1500.00 / Ltr (Subsidized), - Daily power will be made available for 30’ only to – Rs. 5000.00 / Ltr Breathing Air common people – Rs. 20000.00 / Kg Food Packet - All coal plants are for auction, no bid received – min 35 deg, Max 58 Deg - Solar plants producers are unable to replace new panels, Temp 182 filed bankruptcy suit - Luxury tax imposed @ 10.8% on taking Shower - None opted for former in spite 25 Cr incentive by govt. for each former for health security Private & Confidential, (c) Antriksh Photonergy 2

  3. Typical Electrical Energy Dilemma 70-80% 70-80% 50-60% X 2 Effective utilization is not even 1/4 th ? X8? Do we have 8 times the resources with increasing demand??? Private & Confidential, (c) Antriksh Photonergy 3

  4.  What’s need to be done? 1.Conservation of Resources Optimize consumption and minimize wastages (Energy Audit & Efficient Management). 2. Increase Generation 3. Improve efficiency Conversion & T&D (Smart Grid) Private & Confidential, (c) Antriksh Photonergy 4

  5. How to do that? Distributed generation, Smart Cities, Energy Positive Campus & Green Buildings 1. Renewable Generation at site, higher realization (less conversion & nil T&D loss). 2. Adopt efficient techniques (sensors, efficient lighting, cooling, regenerative, geothermal, insulation, star-rated material…. ) to optimize consumption 3. Smart citizen : life style to minimize wastages. Private & Confidential, (c) Antriksh Photonergy 5

  6. Private & Confidential, (c) Antriksh Photonergy 6

  7. Integrated design Approach Smart Consulting is the way… Private & Confidential, (c) Antriksh 7 Photonergy

  8. An Smart City needs lot of pre planning, all experts coming together !!! Private & Confidential, (c) Antriksh Photonergy 8

  9. Architect Mechanical & Civil Design Finance U Town Electrical, BMS, S Planning Security Smart E Taxation Design R Smart Legal Solar Consulting Govt. Regulation Design Planners Regulations (Intelligent Interface) Energy & Smart Project Management O&M Product & Planning Technology O&M providers Water & Mobility Waste Water & Transport Contractors & Service Providers Private & Confidential, (c) Antriksh 9 Photonergy

  10. Group of Renewable, Power, T&D, & Energy Management Professionals > 2 decades of senior leadership with leading MNC’s in directing o Business Consulting o Business Development, Sales & Marketing o Project Management, Tendering, Contract Management o Key Account Management o Procurement, Vendor Management & Channel Management o Training & Talent Development o Event Management o Audit & New Process Development Private & Confidential, (c) Antriksh Photonergy 10

  11. Bringing in India, the world’s best in Power & Energy Smart Grid, T&D, Renewable (Solar, Bio-mass & Hydro). Private & Confidential, (c) Antriksh 11 Photonergy

  12. Smart City & Renewables Smart Consulting Project & Consultancy Trainings & Solutions & Advisory Workshops Strong track record of commitments and honest deliveries Private & Confidential, (c) Antriksh Photonergy 12

  13. Antriksh Photonergy Project & Solutions Renewable, Power & Energy Management Professional leading technical advancement Private & Confidential, (c) Antriksh Photonergy 13

  14. PRODUCTS & PROJECTS SMART GRID » Got empanelment for Schneider with PFC (MoP) as SI /SDC (SCADA) in R-APDRP , headed Core Solution proposal Team to offer consultancy /Solution Proposal for the execution of Smart Grid & SCADA/DMS . 2009-12 POWER T&D » Power Transmission AIS / GIS Substation & switchyards up to 765kV , 2000-2007. NTPC-Seepat, CSEB, BSP, Balco, JSPL, Cement & Steel Plants etc. » Numerical Relay Protection Solutions of Power plants and Substations, 2000-2007. » Power Distribution Solution /EPC Projects – Solar, Power Plants & Utility ( Smart Grid, SCADA /DMS, Prefab /unmanned S/s, Distribution, Underground distribution etc.), 1993-2012 » Static VAR Compensation 33kV, 2005-2007. JSPL, Raigarh. » Electrical /BMS/ Industrial Automation for Data Centers, Industries (MMM, WWW, O&G, Nuclear), Hotel, Hospital & Green Building etc. 2003-2012 RENEWABLE » 65MW worth of Projects (Ground, Rooftop, Off Grid) across India, 2010-14 » 1 st (Rice – Husk) based 10MW Power Generation Project, 2005. Rukmani Power, Kharsia, Chhattisgarh 1MW Power Generation Project, 2005-06. Gangrel Dam, Chhattisgarh Private & Confidential, (c) Antriksh Photonergy 14

  15. Glimpse of Contribution – Solar PV since 2010 Year Solar PV kW Client Project Site On Behalf of Contribution Commiss 65,081 ioning 2010 Ground Grid Connected 3,000 Tata BP Mulshi, Pune Schneider Electric Technology provider 2011 Ground Grid Connected 5,000 Astonfield Rajasthan Schneider Electric Concept & design - Turnkey EPC solution 2011 Ground Grid Connected 12,500 Astonfield Nayaka,Gujarat Schneider Electric Concept & design - Turnkey EPC solution 2011 Ground Grid Connected 5,000 Texas Gujarat Schneider Electric Concept & design - Turnkey EPC solution 2011 Off-Grid 0.5 Rural UP Schneider Electric Onsite installation of 100nos 5W Domestic Solutions 2012 Ground Grid Connected 28,000 Lanco Rajasthan SunPower Commissioning - Tracking Solution 2012 Ground Grid Connected 5,000 Mahindra Rajasthan SunPower Post Commissioning assistance 2012 Ground Grid Connected 850 Clover Maharastra SunPower Post Commissioning assistance 2012 Ground Grid Connected 500 Swelect Tamil Nadu SunPower Post Commissioning assistance 2012 Ground Grid Connected 1,000 Gajanana AndhraPradesh SunPower Post Commissioning assistance 2013 Rooftop Grid Connected 930 Indira Paryawaran Bhawan New Delhi SunPower Technology provider 2013 Rooftop Grid Connected 1,000 Infosys Chennai SunPower Technology provider 2013 Rooftop Grid Connected 415 Infosys Hyderabad SunPower Technology provider 2013 Rooftop Grid Connected 120 Infosys Chennai SunPower Technology provider 2013 Rooftop Grid Connected 50 Elcomponics Noida SunPower Technology provider 2014 Rooftop Grid Connected 1,000 Elcomponics/CEL/G Noida G. Noida SunPower Technology provider 2014 Small Rooftops 500 Various installers AP, TN, NCR SunPower Technology, concept & design 2014 Rooftop Grid Connected 40 Solar Solutions Nepal SunPower Technology provider 2014 Rooftop Grid Connected 25 Lotus Energy Nepal SunPower Technology provider 2014 Rooftop Grid Connected 150 SunBird Srilanka SunPower Technology provider Solar PV Technologies endorsed and established for > 65 MW (Grid / Off-Grid, Ground / Rooftop) Approx 60MW Ground and 5 MW Rooftop Solar Projects commissioned Private & Confidential, (c) Antriksh Photonergy 15

  16. Glimpse of Contribution – Ground Mount , Grid-Connected Contribution in over 35MW projects across India with SunPower commissioned since 2012 Private & Confidential, (c) Antriksh Photonergy 16

  17. Glimpse of Contribution – Rooftop , Grid-Connected First Net Energy Positive Building in 2013, Net-metered with NDMC 930kWp Solar Rooftop in 6000 Sq.mt. on 7 story building to generate 1.4 MU/PA. First Car Park Solar Rooftop 400kWp on top of a building Private & Confidential, (c) Antriksh Photonergy 17

  18. Green Campus - Glimpse Private & Confidential, (c) Antriksh 18 Photonergy

  19. Green Concept Case Study : Residential, New Delhi Units / Day Electrical Power Consumption Variation, comparision from a normal 2BHK to EE-4BHK Months 2BHK Avg* 4BHK Avg* Same family moved from normal 2 BHK to Energy Efficient 4BHK Floor in same area of Delhi Jan 5.19 7.96 53% Extreem winter, heating required is more in extreem winter Feb 7.56 5.48 -28% Normal winter, lower consumption Mar 7.54 4.56 -39% Sunny clear days, lower consumption Apr 5.63 6.97 24% Slightly higer, Mostly Holiday recreation May 5.96 5.36 -10% Better in high temp, less cooling needed Jun 9.29 8.99 -3% Better in high temp, less cooling needed Jul 10.04 10.79 7% Slightly higer, increase due to lifestyle, Holiday / recreation Aug 12.80 9.03 -29% Better in humid, less AC cooling needed Sep 11.84 10.32 -13% Better in humid, less AC cooling needed Oct 7.40 6.70 -9% Normal winter, lower consumption Nov 6.99 4.91 -30% Normal winter, lower consumption Dec 5.41 5.87 8% Extreem winter, heating required is more in extreem winter * 3.25 Yrs Data 2 Yrs Data Year Avg 7.97 7.25 -9% Building design and energy effeciency measures helps in lower consumption Private & Confidential, (c) Antriksh 19 Photonergy

Download Presentation
Download Policy: The content available on the website is offered to you 'AS IS' for your personal information and use only. It cannot be commercialized, licensed, or distributed on other websites without prior consent from the author. To download a presentation, simply click this link. If you encounter any difficulties during the download process, it's possible that the publisher has removed the file from their server.

Recommend


More recommend