smart data mobility smart data mobility smart data mobility - - PowerPoint PPT Presentation

smart data mobility smart data mobility smart data
SMART_READER_LITE
LIVE PREVIEW

smart data mobility smart data mobility smart data mobility - - PowerPoint PPT Presentation

smart data mobility smart data mobility smart data mobility grass coal oil data data + Cell tower triangulation MAC address (WiFi) GPS (GNSS) Automatic image recognition (video) Mobile telecom Facial recognition/tracking cell


slide-1
SLIDE 1
slide-2
SLIDE 2

smart data mobility

slide-3
SLIDE 3

smart data mobility

slide-4
SLIDE 4
slide-5
SLIDE 5
slide-6
SLIDE 6
slide-7
SLIDE 7
slide-8
SLIDE 8
slide-9
SLIDE 9
slide-10
SLIDE 10
slide-11
SLIDE 11
slide-12
SLIDE 12
slide-13
SLIDE 13
slide-14
SLIDE 14
slide-15
SLIDE 15
slide-16
SLIDE 16
slide-17
SLIDE 17
slide-18
SLIDE 18

smart data mobility

slide-19
SLIDE 19

grass coal

  • il
slide-20
SLIDE 20
slide-21
SLIDE 21

data

slide-22
SLIDE 22

data

slide-23
SLIDE 23

+ >1m

MAC address (WiFi) Automatic image recognition (video) Facial recognition/tracking

5-10m 5-50m 100-300m 100m to kms

A-GPS (GPS+Cell tower) Hybrid GPS (GPS+WiFi) GPS (GNSS) Cell tower triangulation Mobile telecom cell (tower)

Location Sensing Technologies and Precision

slide-24
SLIDE 24

z-axis x-axis y-axis z-axis x-axis y-axis

Mode detection from accelerometer signals

slide-25
SLIDE 25

Los Angeles: Twitter activity by operating platform iPhone android

slide-26
SLIDE 26
slide-27
SLIDE 27
slide-28
SLIDE 28
slide-29
SLIDE 29
slide-30
SLIDE 30
slide-31
SLIDE 31

2007

slide-32
SLIDE 32

2015

slide-33
SLIDE 33

2016

slide-34
SLIDE 34

smart data mobility

slide-35
SLIDE 35

real city

slide-36
SLIDE 36

Shared “taxis”

simultaneous ride-sharing

slide-37
SLIDE 37

TaxiBus

  • ptimised on-demand bus
slide-38
SLIDE 38

high-capacity public transport

slide-39
SLIDE 39

number of cars required to provide the same trips as before:

24hrs.

Urban Mobility: System Upgrade What we did What we found Why Scenario: 24 hours
slide-40
SLIDE 40

number of cars required to provide the same trips as before: 3%

24hrs.

Urban Mobility: System Upgrade What we did What we found Why Scenario: 24 hours
slide-41
SLIDE 41

XX

slide-42
SLIDE 42

eliminate

all street parking

slide-43
SLIDE 43

+20%

kerb-to-kerb street space

slide-44
SLIDE 44
slide-45
SLIDE 45
slide-46
SLIDE 46
slide-47
SLIDE 47
slide-48
SLIDE 48 Urban Mobility: System Upgrade What we did What we found Why
  • 80%
  • ff-street parking
slide-49
SLIDE 49
  • 23% to -37%

vehicle kilometres

24 hr. Peak hr.

slide-50
SLIDE 50
  • 34%

CO2 emissions

slide-51
SLIDE 51

+ access

slide-52
SLIDE 52

Metro

30mn access to jobs Lisbon

slide-53
SLIDE 53

Metro % of all jobs accessible in 30 minutes 0-25% 25-50% 50-75% 75-100%

30mn access to jobs

Bus, tram, Metro

Lisbon

slide-54
SLIDE 54

Metro % of all jobs accessible in 30 minutes 0-25% 25-50% 50-75% 75-100%

30mn access to jobs

Shared Taxi and TaxiBus

Lisbon

slide-55
SLIDE 55
slide-56
SLIDE 56
slide-57
SLIDE 57

Piazza Maggiore, Bologna, 1968

slide-58
SLIDE 58

Piazza Maggiore, Bologna, 2016

slide-59
SLIDE 59