sm smar art energy y man anagement circuit
play

Sm Smar art Energy y Man anagement Circuit Breakers, Grid id of - PowerPoint PPT Presentation

Sm Smar art Energy y Man anagement Circuit Breakers, Grid id of the future? Gary Myers Tri-State G&T Joseph E. Childs - Eaton Tri-State's mission is to provide our member systems a reliable, cost-based supply of electricity while


  1. Sm Smar art Energy y Man anagement Circuit Breakers, Grid id of the future? Gary Myers – Tri-State G&T Joseph E. Childs - Eaton Tri-State's mission is to provide our member systems a reliable, cost-based supply of electricity while maintaining a sound financial position through effective utilization of human capital and physical resources in accordance with cooperative principles. www.peakload.org

  2. Energy Automation ion Solu lution ions Demand Response MicroGrid Solutions Renewable Integration Voltage Monitoring and CVR/IVVC X Storage Eaton & Nissan Residenti al Commercial Consumer Empowerment Portals Alarm & Event Visualization AMI Transformer Loading Analysis Deliver innovative technologies to help our customers generate, deliver, and manage energy safely, efficiently, and reliably www.peakload.org

  3. Tri-St State Pi Pilot  18 devices currently deployed  7 EV Chargers  3 Water Heaters  1 Electric Heat  1 Light/ Electric Outlet  2 Solar  4 Misc not installed (demonstration, commissioning, etc.)  Typically see average of 7 devices online  Voltage, amperage, waveform, kWh – just some of the data being collected  Accuracy level within 0.2% 3 www.peakload.org

  4. Eaton Dashboard 4 www.peakload.org

  5. Devices Dashboard 5 www.peakload.org

  6. So Solar r Gard arden Das ashboard 6 www.peakload.org

  7. So Solar r Gard arden Month thly 7 www.peakload.org

  8. Energy Mana nagement Circuit it Breaker Eaton engineers looked at the breaker and said “Seems like an awful waste of space … What more can we teach a circuit breaker?” • EPRI Field Trial • 13 Utilities • ~250 EMCBs Online • EMCB Features • Metering (ANSI C12.20 ±0.2%) • Time stamped Interval Data • 1 or 2 pole (plus electronics pole) • 120/208/240VAC, 15-50A • Plug-on (BR) or Bolt-on (BAB) • Applications (20 Use Cases Identified) • Demand Response • EM&V - Sub-Metering • Power Quality Monitoring (1kHz sampling) • Imbedded into Products www.peakload.org

  9. EV EV Bre reaker • Starts with a standard 208/240V 2-Pole PVM breaker • Thermal Magnetic Protection • Remote Control • ±0.2% Net Metering • Additional features • Ground Fault Protection • On/Off Control • SAE J-1772 Communication • Charging in %/amps control • Enhanced EV Connector with embedded UI Low cost method for Level 2 AC Electric Vehicle Charging www.peakload.org

  10. Com ommun unic ication ion & Soft ftware Archit hitecture • Commissioning • Cell Phone/ Tablet Hotspot Private Cloud Real-time Authenticate Storage DB Virtual Private Clouds • Wi-Fi or Wi-Fi Cellular Router REST API Agent • Cloud Environment • Virtual Private Storage Instance Commission • NO-SQL Environment EV-EMCB • Application Integration EMCB EV-EMCB EMCB EMCB • REST API • Eaton Applications • Real-time Monitor • Yukon Application Suite www.peakload.org

  11. Comments ts on the EM EMCB EM&V: The installation cost is ¼ the cost of traditional solutions. No new wires, or boxes to install. When the breaker panel is full, you have to install a subpanel, but that is a standard process known to all electricians. Sub-metering: We are still researching what granularity of interval data is useful. The ability to increase or decrease the interval rate over-the-air, on a site by site basis is a welcome feature. Power Quality: We now know what is really going on at the solar site. Net Metering is inadequate for understanding the impact of residential solar. Not all Solar Systems are equal. This monitoring solution allows us to collect data and compare supplier solutions. Tri-State: Pilot Process went very well for a new product Easy to Install, easy to commission Very few glitches were noted Reliable product Participants enjoyed the easy information access and Dashboard www.peakload.org

  12. Ne Next t Ste Steps Energy Management Main Breaker Energy Management Power Router www.peakload.org

  13. Final Final Thoug hought hts • Tri-State pilot has created interest in EMCBs • Report on findings is planned • Pilot ended 31 August 2018 • Product available for order as catalog item from Eaton 13 Tri-State January 2018 Member Manager Meeting www.peakload.org

  14. Questi tions? 14 www.peakload.org

  15. Gary Myers gmyers@tristategt.org Desk: 303.254.3592 Cell:970.215.2376 Gary Myers Relationship Manager, Tri-State G&T, currently, Lead - Energy Management Circuit Breaker Program, Variable Capacity Heat Pump Program, Poudre Valley REA, Energy Use Specialist, Owner Main Street Heating & Air, Residential HVAC, Commercial HVAC, Refrigeration. Retired Aviation Technician/ Inspector, Corporate Jet & Helicopter, contractor/U S Air Force. www.peakload.org

  16. Joseph E. Childs Sr. Program Manager – Smart Grid Networks josephechilds@eaton.com 720.273.1682 Mr. Childs’ primary responsibility at Eaton is to ensure that our solutions are fully integrated with a utility’s operations and that they provide the greatest ROI. He has worked the last 30years on the design, development, delivery, training, and operation of utility control systems as a supplier and user. Mr. Childs joined Eaton in 2002 and has provided leadership roles in the organization with various responsibilities since that time. He holds a B.S. in Computer Science and an M.S. in Bioclimatology from Colorado State University. Mr. Childs currently holds the position of Secretary with the Peak Load Management Alliance organization. He has been awarded 2 patents in the fields of DR and EE. www.peakload.org

Download Presentation
Download Policy: The content available on the website is offered to you 'AS IS' for your personal information and use only. It cannot be commercialized, licensed, or distributed on other websites without prior consent from the author. To download a presentation, simply click this link. If you encounter any difficulties during the download process, it's possible that the publisher has removed the file from their server.