SI AERO COMPANY PRESENTATION April 2020 Contents Area of - - PowerPoint PPT Presentation

si aero company presentation
SMART_READER_LITE
LIVE PREVIEW

SI AERO COMPANY PRESENTATION April 2020 Contents Area of - - PowerPoint PPT Presentation

SI AERO COMPANY PRESENTATION April 2020 Contents Area of Activities Consulting Services Project Assistance Services & Operations Experience COMPANY PRESENTATION SI AERO SL 1 Contents Area of Activities Consulting Services Project


slide-1
SLIDE 1

SI AERO COMPANY PRESENTATION

April 2020

slide-2
SLIDE 2

1

COMPANY PRESENTATION SI AERO SL

Contents

Area of Activities Consulting Services Project Assistance Services & Operations Experience

slide-3
SLIDE 3

2

COMPANY PRESENTATION SI AERO SL

Contents

Area of Activities Consulting Services Project Assistance Services & Operations Experience

slide-4
SLIDE 4

3

COMPANY PRESENTATION SI AERO SL

SI AERO AIRPORT EQUIPMENT EXPERTISE AREA OF ACTIVITIES

VDGS SYSTEMS PASSENGER BOARDING BRIDGES & AUXILIARY EQUIPMENT (GPU – PCA) PITS SYSTEMS

SI AERO consultants have years of experience in the following airport equipment

slide-5
SLIDE 5

4

COMPANY PRESENTATION SI AERO SL

Contents

Area of Activities Consulting Services Project Assistance Services & Operations Experience

slide-6
SLIDE 6

5

COMPANY PRESENTATION SI AERO SL

CONSULTING SERVICES

SI AERO can provide consulting services to prepare the technical documentation or help the stakeholders choose the best possible solution

PREVIOUS TO BID PHASE

  • PBB Apron Lay-out Studies
  • Definition of Aircraft Support Services GPU – PCA - VDGS
  • CAPEX – OPEX Analysis
  • GPU – PCA solution definition - sizing
  • PBB Tender Technical Specification
  • GPU – PCA - VDGS Tender Technical Specification
  • PBB Building Interfaces (mechanical, electrical, low voltage)
  • GPU – PCA – VDGS Interfaces
  • Supplier Benchmarking
  • Tender Evaluation Score Criteria

BID PHASE

  • Technical – Economic Tender Evaluation
  • Lay-out Analysis
  • Questions – Answers Follow Up
  • Assistance Technical Evaluation Meeting
  • Offers Comparison Report
  • Final Technical Analysis & Recommendations
slide-7
SLIDE 7

6

COMPANY PRESENTATION SI AERO SL

CONSULTING SERVICES

SI AERO can provide consulting services for dedicated activities such as lay-out

APRON LAY-OUT CONSULTING SERVICES

  • Feasibility Study of Apron utilization
  • Definition of Apron Requirements
  • Contact Stand with PBB
  • PBB type Apron Drive, Nose Loader or T-Bridge
  • Remote Stand
  • Parking Lay-out studies
  • Definition aircraft fleet mix
  • Relation of aircraft per gate
  • Gate dimensioning and characteristics
  • Bridge requirements
  • Stop Positions
  • Service Slopes
  • PBB Sizing Optimization
  • GPU – PCA Solution Definition
slide-8
SLIDE 8

7

COMPANY PRESENTATION SI AERO SL

CONSULTING SERVICES

SI AERO can provide consulting services for dedicated activities such as lay-out

APRON LAY-OUT CONSULTING SERVICES

slide-9
SLIDE 9

8

COMPANY PRESENTATION SI AERO SL

CONSULTING SERVICES

SI AERO can provide consulting services for dedicated hangar services

HANGAR SERVICES

  • Feasibility Study of Hangar Services
  • Definition of Apron Requirements
  • PITS definition
  • Distribution Network
  • PCA – 400Hz System Design
  • PCA AC distribution network
slide-10
SLIDE 10

9

COMPANY PRESENTATION SI AERO SL

Contents

Area of Activities Consulting Services Project Assistance Services & Operations Experience

slide-11
SLIDE 11

10

COMPANY PRESENTATION SI AERO SL OTHER MANUFACTURERS

PCA GPU VDGS Variety of Factory locations

PROJECT STAKEHOLDERS

EPC Companies Airport Concessionaire Aviation Local Authorities

PROJECT MANAGEMENT

Experience in PBB Projects & Airport Site Installations Experience in Latin American market

PBB MANUFACTURER

PBB manufacturing by Phase Interface with Equipment Installation Direction

INSTALLATION SCHEDULE

According to project Schedule Testing Commissioning Training

END USER FEEDBACK

Final user Airport Concessionaire

MAINTENANCE TEAM

Preventive & Corrective Communication w/ manufacturers & SCNP Maintenance courses

SI AERO also provides project management services required to succeed in large engineering projects with PBB – auxiliary equipment

PROJECT ASSISTANCE

slide-12
SLIDE 12

11

COMPANY PRESENTATION SI AERO SL

PROJECT ASSISTANCE

SI AERO can provide a large list of project assistance activities involved

PROJECT ASSISTANCE DETAILED ACTIVITIES

  • Supervision and Revision of Manufacturer :
  • Basic Project and Manufacturer Specification
  • Detailed Executive Project
  • Project GANTT Chart
  • QA Manual
  • Quality Plan
  • Testing Protocols
  • Inspection Program
  • Manufacturing Phase Assistance
  • Revision of Factory Production
  • Control of Production Schedule
  • Control of QA System
  • Factory FAT Approval
  • Factory Acceptance
  • Factory Training
  • Shipping & Transport Protocols
slide-13
SLIDE 13

12

COMPANY PRESENTATION SI AERO SL

PROJECT ASSISTANCE

SI AERO can provide a large list of project assistance activities involved

PROJECT ASSISTANCE DETAILED ACTIVITIES

  • Installation Phase Assistance
  • Method of Statement
  • Control of Installation Schedule
  • Control of QA Implementation
  • Commissioning Phase
  • Testing Protocol
  • Functional Test for each System and Unit
  • Training
  • Technical Documentation revision

 As Built drawings  Maintenance Manuals  Operator manuals  Spare Parts manuals

  • Final Commissioning
  • Final Commissioning Test
  • Commissioning
slide-14
SLIDE 14

13

COMPANY PRESENTATION SI AERO SL

Contents

Area of Activities Consulting Services Project Assistance Services & Operations Experience

slide-15
SLIDE 15

14

COMPANY PRESENTATION SI AERO SL

SERVICES & OPERATIONS

SI AERO can provide a large list of services with existing installed equipment

OPERATIONS SERVICES & RETROFIT SERVICES

  • Operations Services
  • Operation Procedures
  • Safety and Security Manuals
  • Time Scheduling
  • Operator Training and Qualification
  • Review any onsite accident – root cause
  • Retrofit
  • Enhance safety devices installed in PBB
  • GPU – PCA Replacement
  • PBB Existing Equipment Survey
  • Retrofit Activities Recommendation Report
  • Retrofit Tender Support activities
  • Sourcing Spare & Manufacturing Supervision
  • Installation & Commissioning Supervision

OLD AFTER RETROFIT

slide-16
SLIDE 16

15

COMPANY PRESENTATION SI AERO SL

Contents

Area of Activities Consulting Services Project Assistance Services & Operations Experience

slide-17
SLIDE 17

16

COMPANY PRESENTATION SI AERO SL

EXPERIENCE

SI AERO has a large experience in airport projects involving PBB and auxiliary equipment

SI AERO EXPERIENCE

JAVIER SIBILS ENSESA – MANAGING DIRECTOR

  • PBB Manufacturer: TEAM 1989 – 2005 Chief Engineer
  • Technical Manager
  • PBB Product Manager
  • Sales Manager
  • Consultancy Contracts from 2005
  • Mumbai – India: T1C PBB GVK – L&T
  • Lubango – Angola: Airport Global Installations – HOMT
  • Delhi – India: T4 PCA/400Hz Installations Millennium - GMR
  • Mumbai – India: T2 Phase I, PBB GVK – L&T
  • Tocumen TIA – Panama: PBB/PCA/400Hz – ICAO
  • Viracopos – Brazil : PBB/PCA/400Hz – TLA
  • 2014 – 2019 Technical Director of Tianda Latin America for a large list of

PBB projects:  Santiago Chile 51 PBBs  Mexico – 5 Different airports – 18 PBBs

slide-18
SLIDE 18

17

COMPANY PRESENTATION SI AERO SL

EXPERIENCE

SI AERO has a large experience in airport projects involving PBB and auxiliary equipment

SI AERO EXPERIENCE

JAVIER SIBILS ENSESA – MANAGING DIRECTOR

Barcelona (24 units) – Spain Málaga (14 units) – Spain Milano Malpensa Nord SEA (5 units) – Italy Roma Molo Europa ADR (15 units) – Ital Turin (6 units) SAGAT Rio de Janeiro INFRAERO (19 units) Prague BOUYGUES (11 units). Czech Rep. AENA Framework Contract (44) – Spain Athens Spata HOCHTIEF (24 units) – Greece Manchester MAPLC (11 units) – England Birmingham Int. Airport (5 units) – England AA2000 (13 units) – Argentina Roma Molo OVest ADR (22 units)-Italy Tunisia OPAT (9 units) – Tunisia Hanoi Northern CAA (5 units.) – Vietnam Brussels Pier A BIAC (31 units) – Belgium Olbia Airport GESAER (5 units) – Italy Iberia Hangar Barcelona (2 bay A340) – Spain GMR Hangar – Hyderabad - India Riga Int. Airport RIX (5 units) – Latvia Faro ANA (11 units) – Portugal Teheran IKIA (14 units.) – Iran Guarulhos INFRAERO (11 units) – Brazil Venice SAVE (7 units) - Italy Kuwait DGCA (13 units) – Kuwait Damascus and Aleppo (7 units) ICAO Syria Palermo GESAP (7 units) – Italy Congonhas Sao Paolo (7 units) – Brazil Belgrade JP Aerdrom (6 units) – Serbia Sofia STRABAG (7 units) – Bulgaria Adelaide Int. Airport (14 units) - Australia Barcelona AENA (64 Stands) - Spain Hyderabad GMR (34 Stands) - India Madrid T4 AENA (6 Stands) - Spain Sydney Remote SIAC (2 Stands) – Australia Palma Mallorca AENA (10 Stands) – Spain Air India Hangar – Trivandrum - India

slide-19
SLIDE 19

18

COMPANY PRESENTATION SI AERO SL

EXPERIENCE

SI AERO has a large experience in airport projects involving PBB and auxiliary equipment

SI AERO EXPERIENCE

JAVIER SIBILS HERNANDEZ – AIRPOR CONSULTANT

  • 2014 – 2019: Tianda Latin America Sales Engineer
  • Sales engineer with direct communication with EPC, airport owners, etc…
  • Prepared tender technical – economic proposals for PBB – GPU – PCA tenders
  • Budgetary proposals OPEX – CAPEX analysis
  • Maintenance proposals
  • Retrofit proposals including technical scope
  • 2014 – 2019: Tianda Latin America Project Manager Director
  • Strong project management skills with an extensive project record performed in

different countries such as Brazil, Chile, Ecuador or Mexico with over 80 PBBs

  • Project Budget management
  • Managed mechanical, electrical, low voltage interfaces
  • PBB interfaces with GPU – PCA - VDGS
  • PBB Transport logistics operation for each project
slide-20
SLIDE 20

19

COMPANY PRESENTATION SI AERO SL

Contact Information

Javier Sibils Hernández Airport Engineer Consultant +34 670 052 470 javier.sibils-h@si-group.es