Sharry Miller ADEC May 2, 2013 18 AAC 75.445(g)(5) Specific to - - PowerPoint PPT Presentation

sharry miller adec may 2 2013 18 aac 75 445 g 5 specific
SMART_READER_LITE
LIVE PREVIEW

Sharry Miller ADEC May 2, 2013 18 AAC 75.445(g)(5) Specific to - - PowerPoint PPT Presentation

Sharry Miller ADEC May 2, 2013 18 AAC 75.445(g)(5) Specific to skimmers and pumps Use an effective oil recovery capacity of 20% of the equipment manufacturers rated throughput capacity over a 24-hour period Unless an analysis


slide-1
SLIDE 1

Sharry Miller ADEC May 2, 2013

slide-2
SLIDE 2

 18 AAC 75.445(g)(5)  Specific to skimmers and pumps  Use an effective oil recovery capacity of

20% of the equipment manufacturer’s rated throughput capacity over a 24-hour period

 Unless an analysis demonstrates to the

department’s satisfaction that another rate is appropriate

slide-3
SLIDE 3

 Skimmers are common across plans,

but operations are not

 Plan holders need to be held to the

same standards

 Request for Assessment of Skimmer

System Efficiency

  • General company information
  • Test results
  • Operational information
slide-4
SLIDE 4

 ASTM 2709

  • Best-case scenario
  • Constant oil thickness
  • Practice runs to fine tune skimmer operation

 Need to inject real-world considerations

  • Sea states
  • Debris
  • Oil thickness
slide-5
SLIDE 5

 Systems approach

  • Skimmer
  • Boom
  • Storage
  • Tactics

 Contain, control, clean up

  • Find and collect oil
  • Meeting RPS is only one standard
slide-6
SLIDE 6

 Crucial skimmers in Cook Inlet

  • 13- and 56-disc skimmers
  • Harbor and Current Busters
  • Tactics in CISPRI Technical Manual
  • 50% ORR
  • 70% ORE

 PWS proposal

  • 100-disc skimmers, 2 per barge
  • Ocean Busters
  • Final determination after completion of ongoing work

 Barge modifications  Deployment techniques  Tactics development

slide-7
SLIDE 7