SEWER REHAB SE AB Town of Lockport SEWER REHAB SE AB PR PROJE JECT CT IN INCLUD LUDES ES Repairing all of the sewer main breaks Cleaning, videoing, and lining all of the sewer mains with Cast- In-Place Pipe Coating all of


slide-1
SLIDE 1

Town of Lockport

SE SEWER REHAB AB

slide-2
SLIDE 2

SE SEWER REHAB AB PR PROJE JECT CT IN INCLUD LUDES ES

  • Repairing all of the sewer main breaks
  • Cleaning, videoing, and lining all of the sewer mains with Cast-

In-Place Pipe

  • Coating all of the manholes in Town with a polyurea coating after

cleaning

  • Lining the connection between the sewer main and services

where defective

  • Cleaning and videoing suspicious services for breaks (some

services required clean outs)

  • Repairing services where necessary
  • Lining services from the sewer main to the property line where

appropriate

slide-3
SLIDE 3

WHERE AR ARE WE IN IN TH THE PR PROCE CESS? SS?

GETTING CLOSE!

▪ The sewer mains and manhole repairs, lining, and coatings are 95% complete. ▪ The work left to complete is the inspection of the services and finding the leaks and breaks for repair. ▪ This will take time but we are trying to give Lockport the best results for the funds available.

slide-4
SLIDE 4

EXAM AMPL PLES S OF WORK COMP MPLET LETED

Before After Manhole on School Street East of Pine Street

slide-5
SLIDE 5

EXAM AMPL PLES S OF WORK COMP MPLET LETED

Before After 2-foot Gap in Sewer Main

(Shoulder of Road Near 2nd and School Streets)

slide-6
SLIDE 6

EXAM AMPL PLES S OF WORK COMP MPLET LETED

Before After Cable Through Sewer Main

(Near Intersection of 2nd and Elizabeth Streets)

slide-7
SLIDE 7

EXAM AMPL PLES S OF WORK COMP MPLET LETED

Before After Service Break-In Through Sewer Main

(Lafourche St. Between 6th St. & Crescent Ave.)

slide-8
SLIDE 8

EXAM AMPL PLES S OF WORK COMP MPLET LETED

Before After Roots in Joint of Sewer Main

(Canal St. Between 7th & 8th Streets)

slide-9
SLIDE 9

EXAM AMPL PLES S OF WORK COMP MPLET LETED

Before After Break at the Top of Sewer Main

(Vacherie St. Between 9th & 8th Streets)

slide-10
SLIDE 10

SO SOME ME SE SERVI VICE CE CORREC ECTIO TIONS NS LEFT TO BE MAD MADE

slide-11
SLIDE 11

SO SOME ME SE SERVI VICE CE CORREC ECTIO TIONS NS LEFT TO BE MAD MADE

slide-12
SLIDE 12

SO SOME ME SE SERVI VICE CE CORREC ECTIO TIONS NS LEFT TO BE MAD MADE

slide-13
SLIDE 13

VI VIDEOS S AN AND PI PICTUR URES S PR PROVID VIDED D BY:

Providence Engineering and Design, LLC Compliance EnviroSystems, LLC Suncoast Infrastructure, Inc. Gulf Coast Underground, LLC National Water Main Cleaning Co.