SEWER REHAB SE AB Town of Lockport SEWER REHAB SE AB PR PROJE JECT CT IN INCLUD LUDES ES Repairing all of the sewer main breaks Cleaning, videoing, and lining all of the sewer mains with Cast- In-Place Pipe Coating all of


  1. SEWER REHAB SE AB Town of Lockport

  2. SEWER REHAB SE AB PR PROJE JECT CT IN INCLUD LUDES ES Repairing all of the sewer main breaks • Cleaning, videoing, and lining all of the sewer mains with Cast- • In-Place Pipe Coating all of the manholes in Town with a polyurea coating after • cleaning Lining the connection between the sewer main and services • where defective • Cleaning and videoing suspicious services for breaks (some services required clean outs) Repairing services where necessary • Lining services from the sewer main to the property line where • appropriate

  3. WHERE AR ARE WE IN IN TH THE PR PROCE CESS? SS? GETTING CLOSE! The sewer mains and manhole repairs, lining, and coatings are 95% complete. ▪ The work left to complete is the inspection of the services and finding the leaks ▪ and breaks for repair. This will take time but we are trying to give Lockport the best results for the ▪ funds available.

  4. EXAM AMPL PLES S OF WORK COMP MPLET LETED Manhole on School Street East of Pine Street Before After

  5. EXAM AMPL PLES S OF WORK COMP MPLET LETED 2-foot Gap in Sewer Main (Shoulder of Road Near 2 nd and School Streets) After Before

  6. EXAM AMPL PLES S OF WORK COMP MPLET LETED Cable Through Sewer Main (Near Intersection of 2 nd and Elizabeth Streets) After Before

  7. EXAM AMPL PLES S OF WORK COMP MPLET LETED Service Break-In Through Sewer Main (Lafourche St. Between 6 th St. & Crescent Ave.) After Before

  8. EXAM AMPL PLES S OF WORK COMP MPLET LETED Roots in Joint of Sewer Main (Canal St. Between 7 th & 8 th Streets) After Before

  9. EXAM AMPL PLES S OF WORK COMP MPLET LETED Break at the Top of Sewer Main (Vacherie St. Between 9 th & 8 th Streets) After Before

  10. SO SOME ME SE SERVI VICE CE CORREC ECTIO TIONS NS LEFT TO BE MAD MADE

  11. SO SOME ME SE SERVI VICE CE CORREC ECTIO TIONS NS LEFT TO BE MAD MADE

  12. SO SOME ME SE SERVI VICE CE CORREC ECTIO TIONS NS LEFT TO BE MAD MADE

  13. VI VIDEOS S AN AND PI PICTUR URES S PR PROVID VIDED D BY: Providence Engineering and Design, LLC Compliance EnviroSystems, LLC Suncoast Infrastructure, Inc. Gulf Coast Underground, LLC National Water Main Cleaning Co.

Download Presentation
Download Policy: The content available on the website is offered to you 'AS IS' for your personal information and use only. It cannot be commercialized, licensed, or distributed on other websites without prior consent from the author. To download a presentation, simply click this link. If you encounter any difficulties during the download process, it's possible that the publisher has removed the file from their server.