SEWER REHAB SE AB Town of Lockport SEWER REHAB SE AB PR PROJE JECT CT IN INCLUD LUDES ES Repairing all of the sewer main breaks Cleaning, videoing, and lining all of the sewer mains with Cast- In-Place Pipe Coating all of
SE SEWER REHAB AB PR PROJE JECT CT IN INCLUD LUDES ES
- Repairing all of the sewer main breaks
- Cleaning, videoing, and lining all of the sewer mains with Cast-
In-Place Pipe
- Coating all of the manholes in Town with a polyurea coating after
cleaning
- Lining the connection between the sewer main and services
where defective
- Cleaning and videoing suspicious services for breaks (some
services required clean outs)
- Repairing services where necessary
- Lining services from the sewer main to the property line where
appropriate
WHERE AR ARE WE IN IN TH THE PR PROCE CESS? SS?
GETTING CLOSE!
▪ The sewer mains and manhole repairs, lining, and coatings are 95% complete. ▪ The work left to complete is the inspection of the services and finding the leaks and breaks for repair. ▪ This will take time but we are trying to give Lockport the best results for the funds available.
EXAM AMPL PLES S OF WORK COMP MPLET LETED
Before After Manhole on School Street East of Pine Street
EXAM AMPL PLES S OF WORK COMP MPLET LETED
Before After 2-foot Gap in Sewer Main
(Shoulder of Road Near 2nd and School Streets)
EXAM AMPL PLES S OF WORK COMP MPLET LETED
Before After Cable Through Sewer Main
(Near Intersection of 2nd and Elizabeth Streets)
EXAM AMPL PLES S OF WORK COMP MPLET LETED
Before After Service Break-In Through Sewer Main
(Lafourche St. Between 6th St. & Crescent Ave.)
EXAM AMPL PLES S OF WORK COMP MPLET LETED
Before After Roots in Joint of Sewer Main
(Canal St. Between 7th & 8th Streets)
EXAM AMPL PLES S OF WORK COMP MPLET LETED
Before After Break at the Top of Sewer Main
(Vacherie St. Between 9th & 8th Streets)