Construction Engineering Inspection Services for Pembroke Road from Dykes Road to Silver Shores Boulevard R211408P1 Introduction, Experience & Qualifications A. Introduction, Experience & Qualifications I. Qualifications of Project
- A. Introduction, Experience & Qualifications
- I. Qualifications of Project TEAM
- II. Qualifications of Firm
III.Construction Engineering and Inspection Experience on Similar Projects
- B. Project Approach & Construction Management
- C. Identification of Potential Issues, Challenges & Solutions
Introduction, Experience & Qualifications
CEI Experience & Qualifications
Broward County Project Manager Nirmal Datta, P.E. Quality Assurance/ Quality Control John Hart, P.E. Principal in Charge/ Senior Project Managerr
Senior
Dan Tintner, P.E. Senior Project Engineer/Project Administrator Robert Audette, P.E.
CPC Inspectors
Leonel Mendieta, EIT-Senior Inspector Carlos Roberts-Senior Inspector Alfonso Server-Senior ITS Inspector Omel Ramirez-Inspector Gary O Dell-Inspector
Contract Compliance Specialist/Secretary Winnie Wilson Survey/Utilities Landon M. Cross, PSM Tom English, PSM Corporate Support Greg Proctor, P.E. Landscape Specialist/ Inspection Aerial Photogrammetry
Smith Aerial Photos2
Materials Sampling and Testing
Sven Jetzkewitz1
Organization Chart
1 Federal Engineering & Testing, Inc. (CBE) 2 Smith Aerial Photos (CBE) 3 JBC Planning & Design (CBE)
CEI Experience & Qualifications
Over er 25 Year ars s of Ex Experi perience ce in Browar ard Coun
- unty
ty Tran ansp sportat atio ion & Road adway y Impr provem ements s Com
- mpl
plete Str treets Projec
- jects
ts Ex Exper perien ience ce Ex Experi perience ced with th Browar ard County ty & Loc
- cal
l Agen encie cies Ex Experi perience ced with th City ty of Miram amar ar Ex Experi perience ced with th City ty of Pemb mbroke Pines nes Ex Exper perie ience ced with th South th Broward Drain inag age Distr trict ict Proje jects ts Avail ilab able le Up Upon
- n Noti
tice ce to Proce
- ceed
Dan Tintner, P .E. CPC Senior Project Manager
CEI Experience & Qualifications
25 Year ars s of Ex Experi perience ce in CEI EI Road adway y and d Bridge idge Con
- nstr
truct ctio ion n Resi sident t of Pemb mbroke Pines nes Com
- mpl
plete Str treets Projec
- jects
ts Ex Exper perien ience ce Ex Experi perience ce with th both th FDOT T & Local
- cal Agency
ency (LAP LAP) ) Proje ject cts Proje
- ject
ct En Engine gineer on n simil milar ar ur urban an arterials rials inclu cludin ing g the he City ty of Coconut Creek’s Education Corridor, SR 834 Sample Road Grou
- upi
ping g and nd SR 997 7 Krom
- me Aven
enue Ex Experi perience ce with th Roadw adway and d Bridge idge rehab ehabil ilit itat ation ion and d wide idening ning proje
- jects
cts Proven track ack reco cord achie hieving ing suc ucce cess ssfu ful l resu sult lts
Robert Audette, P .E. CPC Senior Project Engineer
CEI Experience & Qualifications
22 Year ars s of Ex Experi perience ce in CEI EI Road adway y and d Bridge idge Con
- nstr
truct ctio ion n & Desi sign gn 5 Year ars of f Ex Experi perience nce wor
- rking
ing with th Robe
- bert Aud
udette, Sen enio ior r Proje ject t En Engin ineer Senio enior r Inspe nspect ctor r for r Krom
- me Aven
enue South th Grou
- upi
ping ng Senio enior r Inspe nspect ctor r for r SR 823 3 (Red ed Road ad/5 /57th
th Aven
enue) ) Ex Experi perience ce with th simil milar ar ur urban an arterials rials Ex Experi perience ced wor
- rkin
ing g wit ith Loc
- cal
al Agen encie cies Com
- mpl
plete Str treets Projec
- ject
t Experie perience nce
Leonel Mendieta, E.I.T CPC Senior Inspector
CEI Experience & Qualifications
28 Year ars s of Ex Experi perience ce in CEI EI Road adway y and d Bridge idge Con
- nstr
truct ctio ion n Senio enior r Inspe nspect ctor r on n Krom
- me Avenue
enue South h Ex Exper perie ience ce in Int ntell llige igent t Netw twork Systems IMSA SA Traffic fic Signali gnalizat zatio ion n Level l 2
Alfonso Server CPC Senior ITS/Roadway Inspector
31 Years ars of Ex Exper perie ience ce in CEI EI Road adway y and d Bridg idge Cons
- nstr
truct ctio ion n New Con
- nst
stru ructi ction Proje jects ts and nd Reha ehabil ilit itat atio ion Qua uali lifie ied Grout
- utin
ing g Tech echnician nician 1 & 2 Qua uali lifie ied Post st-Tensi sionin ing g Tech chnic nician an
CEI Experience & Qualifications
12 Year ars s of Ex Experi perience ce in CEI EI Road adway y Con
- nst
stru ructi ction Previo vious s Ex Experi perience ce as QC Techn echnicia ician & Qua uali lity ty Con Contr trol l In Insp spect ctor Perform rmed Soi
- ils
ls Tes esti ting g & Pr & Proct
- ctors
rs An Anal alys ysis is of f Soil
- il Class
ssifi ificat catio ion & Suita uitabilit ility
Gary Odell CPC Roadway Inspector Omel Ramirez CPC Roadway Inspector
15 Year ars of f Ex Expe perie rience nce in CEI EI Roadw adway y Con
- nstr
truct ctio ion n Inspe nspect ctor r on n Krom
- me Aven
enue South th with th Robe
- bert Aude
udette, SPE E Ex Experi perience ced in aspha phalt lt pavin ing, g, con
- ncre
rete, , ear arth thwork and d lands ndscap caping ing
CEI Experience & Qualifications
TEAM Certifications & Qualification Matrix
QC Manager MOT - FDOT Advanced MOT - FDOT Intermediate CTQP Final Estimates Level I CTQP Final Estimates Level II CTQP Earthwork Construction Inspection Level I & II CTQP Asphalt Paving Level I & II CTQP Drilled Shaft Inspection CTQP Pile Driving Inspection CTQP Concrete Field Technician Level I ACI Concrete Field Testing Tech Grade 1 Augercast Pile Radiation Safety & Use of Nuclear Density Gauge HAZMAT 49CFHR172 - Subpart H FDEP Stormwater Management Inspector IMSA Traffic Signal Technician Level 1 IMSA Traffic Signal Technician Level 2 FDOT Critical Structures Construction Issues CTQP Post-Tensioning Technician Level I CTQP Grouting Techinica Level I & II Name Project Role TIN # Dan Tintner, P.E. Principal in Charge/Senior Project Manager D53516156
X X X
Robert Audette, P.E. Senior Project Engineer/Project Administrator A33076067
X X X X X X
John Hart, P.E. Quality Assurance/Quality Control H63046164
X X X X X
Winnie Wilson Contract Compliance Specialist/Secretary N/A Leonel Mendieta, EIT Senior Inspector M53352560
X X X X X X X X X
X
X X X X
Carlos Roberts Senior Inspector R16311468
X X X X X X
Alfonso Server Senior ITS Inspector S61600040
X X X X X X X X X X X
Omel Ramirez Inspector R56264581
X X X X X X X X X X X X
Gary Odell Inspector O34028076
X X X X X X X X X X X X X
Alfie Cross, PSM Survey/Utilities N/A
X
Tom English, PSM Survey/Utilities N/A
X
Carnahan, Proctor & Cross, Inc. Certification Matrix
Education Corridor Improvements Phase III Coconut Creek Parkway from Banks Road to the Florida Turnpike, Coconut Creek, FL
- Local
- cal Agen
ency cy Progr
- gram
am
- Com
- mpl
plete Str treets s Projec
- ject
- Pede
dest stria rian n Safety ty Up Upgrad rades
- New
w Bus us Shel elter ers s & B Benc nches es
- AD
ADA A Com
- mpliant
liant Side dewal alks ks
- Draina
nage ge Impr mproveme ements nts
- Signal
Signaliz izat ation Upgra pgrades
- Ligh
Lighti ting Im Impr provements ts
- Land
andsca scape pe & Irriga rrigati tion n Insta nstall llat atio ion
- Ha
Hardsca cape pe Featu atures res
CEI Experience & Qualifications
“Full Oversight of CEI Services”
SR AIA Landscaping & Hardscaping Enhancements & West Commercial Boulevard Improvements
- Local
- cal Agen
ency cy Progr
- gram
am
- Com
- mpl
plete Str treets s Projec
- ject
- Pede
dest stria rian n Safety ty Up Upgrad rades
- New
w Bus us Shel elter ers s & B Benc nches es
- AD
ADA A Com
- mpliant
liant Side dewal alks ks
- Draina
nage ge Impr mproveme ements nts
- Signal
Signaliz izat ation Upgra pgrades
- Ligh
Lighti ting Im Impr provements ts
- Land
andsca scape pe & Irriga rrigati tion n Insta nstall llat atio ion
- Ha
Hardsca cape pe Featu atures res
CEI Experience & Qualifications
“Full Oversight of CEI Services”
SR 834 (Sample Road), SR 7 (441), SR 814 (Atlantic Boulevard) Grouping, Margate, Coconut Creek, Coral Springs and Pompano Beach, FL
- Impr
proved Traffic fic Oper erat atio ions ns
- AD
ADA A Pede dest stria rian n Safety ty Up Upgrad rades
- Major
jor Signali gnalizat zation ion Up Upgrad rades s
- 20 Drilled
ed Shaft t Mast Ar Arms
- Gravity
ty Wall Constr nstruc ucti tion
- n
- 32
32 Ne New Ligh Light Pole
- le Sy
Systems
- Bridg
Bridge Mou Mount nted Ill Illumi minat ated Signs Signs
- 1050
050 LF LF Alu lumin minum Ra Rail iling ing
- Dra
Drainag inage Im Improvements
- Land
andscap cape & I & Irri rriga gati tion n Inst nstal alla lati tion
CEI Experience & Qualifications
“FTBA Best Partnering and Urban Project”
SR 823 (Red Road/57th Avenue Grouping from W 23rd Street to W 46th Street, Hialeah, FL
- Major
jor Reco const stru ructi ction of SR 823 23
- Wide
idening ning from
- m 4-Lane
anes to 6-Lan Lanes
- Reco
constr truct ction ion of 8 Int ntersecti ctions
- Drain
inage age Modifi dificat catio ions
- Bridge
idge Wide idening ing
- Chan
annel l Ex Exca cavat ation ion
- Insta
nstall llat atio ion of 1167 67 Con
- ncre
rete Piles es
- Major
jor Signali gnalizat zation ion Up Upgrad rades s
- 300 New
w Drainage age Structu tures res
- Installation of 84” Dual Culverts
CEI Experience & Qualifications
“Prudential Productivity Award for Cost Savings”
SR 997 Krome Avenue from South of Kendall Drive to North of 8th Street, Miami, FL
- Major
jor Reco const stru ructi ction (36 6 Miles es) ) SR 997
- Operat
eratio ional al & Safety y Up Upgrad rades
- Wide
idenin ning g from
- m 2-Lane
anes to 4-Lan Lanes
- Milli
ling ng & Resu surfacin acing
- Drain
inage age Modifi dificat catio ions
- Bridge
idge No:
- : 8709
0974 Wide idening ing
- Barrie
rrier r Wal all
- Pede
dest stria rian n Raili ling
- Impr
mproved ed Storm rmwater Draina nage ge
- Light
hting ing & S & Signa naliz lizat ation ion Upg Upgrad ades
CEI Experience & Qualifications
“Full CEI Oversight Services”
- A. Introduction, Experience and Qualifications
- B. Project Approach & Construction Management-Project Scope
I. Traffic Control Phasing II. Earthwork
- III. Drainage
- IV. Widening
V. Milling & Resurfacing
- VI. Perimeter Walls
- VII. Signalization & Lighting
VIII.Landscape & Irrigation
- IX. Complete Streets
- C. Identification of Potential Issues, Challenges & Solutions
Project Approach & Construction Management
Project Approach & Construction Management
Understanding of Project Scope
Project Approach & Construction Management
Traffic Control Phasing Widening Complete Streets Experience Signalization & Lighting Earthwork Drainage Milling & Resurfacing Perimeter Walls Landscape & Irrigation
Understanding of Project Scope
Community Involvement
- A. Introduction, Experience and Qualifications
- B. Project Approach & Construction Management
MOT Coordination I. Adjacent School VII. HOA’s & Businesses II. Pedestrian Traffic VIII. Silver Shores Elementary
- III. Bus Stops IX. Silver Shores Park
- IV. Motorist Traffic X. Broward County Transit
V. Business Access XI. Memorial Hospital Miramar
- VI. TCP (6 Phases) XII. Emergency Services
- C. Identification of Potential Issues, Challenges & Solutions
Project Approach & Construction Management
- A. Introduction, Experience and Qualifications
- B. Project Approach & Construction Management
Utilities I. FPL II. FPL Fibernet
- III. AT&T
- IV. TECO Gas
V. Comcast
- VI. City of Pembroke Pines
- VII. City of Miramar
- C. Identification of Potential Issues, Challenges & Solutions
Project Approach & Construction Management
- A. Introduction, Experience and Qualifications
- B. Project Approach & Construction Management
Environmental I. NPDES II. South Broward Drainage District
- C. Identification of Potential Issues, Challenges & Solutions
Project Approach & Construction Management
- A. Introduction, Experience and Qualifications
- B. Project Approach & Construction Management
Quality Control I. FDOT Construction Project Administration Manual II. Open Lines of Communication with Stakeholders
- III. Identification of Potential Conflicts
- C. Identification of Potential Issues, Challenges & Solutions
Project Approach & Construction Management
Potential Issues, Challenges & Solutions
Subsoil Excavation
DEMUCKING CHALLENGES: Northern half of Right-of-Way needs to be demucked up to 12’ deep, adjacent to existing roadway. Verify Cores AB-5 (10’), versus MD-7 A to F (less than 5’) SOLUTIONS: CPC will coordinate pre-activity meetings with Contractor and Geotech Engineer to confirm limits of demucking. CPC will perform ground survey in-house.
Potential Issues, Challenges & Solutions
Maintenance of Traffic
LANE & SIDEWALK CLOSURES CHALLENGES: Silver Shores Elementary School & Silver Shores Park: Traffic backs up on Pembroke Rd. Sidewalks are filled with pedestrians. SOLUTIONS: CPC will be proactive and coordinate any special events, early release dates, etc, with the contractor, School Board Transportation Department, school crossing guards, stakeholders and emergency services to identify any conflicts in advance.
Potential Issues, Challenges & Solutions
Traffic Control Plan: 6 Phases
CHALLENGES: Phase1: Install erosion control devices and construct North Wall. Close proximity to FPL overhead powerline will require coordination. Phase 2: Construct work on North side. Phase 3: Construct work on South side. Phase 4: Center of Roadway. Phase 5: Milling & Resurfacing. Phase 6: Thermoplastic Pavement. Markings. SOLUTIONS: Proactive Coordination. TCP by Contractor for approval by County
Potential Issues, Challenges & Solutions
Existing Utilities and New Drainage Structures
CONSTRUCTING NEW DRAINAGE CHALLENGES: Constructing new drainage structures and pipe with existing utilities in close
- proximity. Our field review and plan review reveals a need for careful utility
verification at several locations. SOLUTIONS: CPC will coordinate with the Contractor to perform pre-trenching at potential conflicts.
Potential Issues, Challenges & Solutions
Permitting
LOCAL AGENCIES CHALLENGES: Ensure that proper permits are
- btained by Contractor and comply
with the City of Miramar, City of Pembroke Pines and South Broward Drainage District. (Wall and TCP) SOLUTIONS: CPC currently has a close working relationship with all local agencies and will coordinate with Contractor during all preconstruction meetings, inspections, testing, as-builts and closeout.
Potential Issues, Challenges & Solutions
Environmental
EROSION CONTROL CHALLENGES: Ensure that proper maintenance of Sediment and Erosion Control is being performed by contractor. SOLUTIONS: CPC will closely review plans and have
- ngoing inspections of contractor’s
sediment and erosion control system including monitoring the turbidity readings.
Potential Issues, Challenges & Solutions
Roadway Construction & Public Outreach
AVOIDING COMPLAINTS CHALLENGES: Minimizing complaints from adjacent residents in close proximity. SOLUTIONS: Advance notification to adjacent residents and others.
Potential Issues, Challenges & Solutions
Signalization & Lighting
SIGNALS & LIGHT POLES CHALLENGES: Avoidance of utility conflicts during installation of new signal foundations and light poles. Ensure all light shields are installed for the entire project limits. SOLUTIONS: CPC will coordinate these issues at the Pre-Construction meeting and all Pre- Activity meetings with the Utility Owners and Contractor and County Engineering Division.
Potential Issues, Challenges & Solutions
Landscaping & Irrigation
LOCAL AGENCIES & HOA’S CHALLENGES: Existing landscaping and irrigation maintained by HOA’s. New installation of landscape in medians will be maintained by the City
- f Miramar.
SOLUTIONS: CPC will closely coordinate landscaping and irrigation construction with stakeholders, HOA’s, City of Miramar and the City of Pembroke Pines.