Construction Engineering Inspection Services for Pembroke Road from Dykes Road to Silver Shores Boulevard R211408P1 Introduction, Experience & Qualifications A. Introduction, Experience & Qualifications I. Qualifications of Project


slide-1
SLIDE 1

Construction Engineering Inspection Services for Pembroke Road from Dykes Road to Silver Shores Boulevard R211408P1

slide-2
SLIDE 2
  • A. Introduction, Experience & Qualifications
  • I. Qualifications of Project TEAM
  • II. Qualifications of Firm

III.Construction Engineering and Inspection Experience on Similar Projects

  • B. Project Approach & Construction Management
  • C. Identification of Potential Issues, Challenges & Solutions

Introduction, Experience & Qualifications

slide-3
SLIDE 3

CEI Experience & Qualifications

Broward County Project Manager Nirmal Datta, P.E. Quality Assurance/ Quality Control John Hart, P.E. Principal in Charge/ Senior Project Managerr

Senior

Dan Tintner, P.E. Senior Project Engineer/Project Administrator Robert Audette, P.E.

CPC Inspectors

Leonel Mendieta, EIT-Senior Inspector Carlos Roberts-Senior Inspector Alfonso Server-Senior ITS Inspector Omel Ramirez-Inspector Gary O Dell-Inspector

Contract Compliance Specialist/Secretary Winnie Wilson Survey/Utilities Landon M. Cross, PSM Tom English, PSM Corporate Support Greg Proctor, P.E. Landscape Specialist/ Inspection Aerial Photogrammetry

Smith Aerial Photos2

Materials Sampling and Testing

Sven Jetzkewitz1

Organization Chart

1 Federal Engineering & Testing, Inc. (CBE) 2 Smith Aerial Photos (CBE) 3 JBC Planning & Design (CBE)

slide-4
SLIDE 4

CEI Experience & Qualifications

 Over er 25 Year ars s of Ex Experi perience ce in Browar ard Coun

  • unty

ty Tran ansp sportat atio ion & Road adway y Impr provem ements s  Com

  • mpl

plete Str treets Projec

  • jects

ts Ex Exper perien ience ce  Ex Experi perience ced with th Browar ard County ty & Loc

  • cal

l Agen encie cies  Ex Experi perience ced with th City ty of Miram amar ar  Ex Experi perience ced with th City ty of Pemb mbroke Pines nes  Ex Exper perie ience ced with th South th Broward Drain inag age Distr trict ict Proje jects ts  Avail ilab able le Up Upon

  • n Noti

tice ce to Proce

  • ceed

Dan Tintner, P .E. CPC Senior Project Manager

slide-5
SLIDE 5

CEI Experience & Qualifications

 25 Year ars s of Ex Experi perience ce in CEI EI Road adway y and d Bridge idge Con

  • nstr

truct ctio ion n  Resi sident t of Pemb mbroke Pines nes  Com

  • mpl

plete Str treets Projec

  • jects

ts Ex Exper perien ience ce  Ex Experi perience ce with th both th FDOT T & Local

  • cal Agency

ency (LAP LAP) ) Proje ject cts  Proje

  • ject

ct En Engine gineer on n simil milar ar ur urban an arterials rials inclu cludin ing g the he City ty of Coconut Creek’s Education Corridor, SR 834 Sample Road Grou

  • upi

ping g and nd SR 997 7 Krom

  • me Aven

enue  Ex Experi perience ce with th Roadw adway and d Bridge idge rehab ehabil ilit itat ation ion and d wide idening ning proje

  • jects

cts  Proven track ack reco cord achie hieving ing suc ucce cess ssfu ful l resu sult lts

Robert Audette, P .E. CPC Senior Project Engineer

slide-6
SLIDE 6

CEI Experience & Qualifications

 22 Year ars s of Ex Experi perience ce in CEI EI Road adway y and d Bridge idge Con

  • nstr

truct ctio ion n & Desi sign gn  5 Year ars of f Ex Experi perience nce wor

  • rking

ing with th Robe

  • bert Aud

udette, Sen enio ior r Proje ject t En Engin ineer  Senio enior r Inspe nspect ctor r for r Krom

  • me Aven

enue South th Grou

  • upi

ping ng  Senio enior r Inspe nspect ctor r for r SR 823 3 (Red ed Road ad/5 /57th

th Aven

enue) )  Ex Experi perience ce with th simil milar ar ur urban an arterials rials  Ex Experi perience ced wor

  • rkin

ing g wit ith Loc

  • cal

al Agen encie cies  Com

  • mpl

plete Str treets Projec

  • ject

t Experie perience nce

Leonel Mendieta, E.I.T CPC Senior Inspector

slide-7
SLIDE 7

CEI Experience & Qualifications

 28 Year ars s of Ex Experi perience ce in CEI EI Road adway y and d Bridge idge Con

  • nstr

truct ctio ion n  Senio enior r Inspe nspect ctor r on n Krom

  • me Avenue

enue South h  Ex Exper perie ience ce in Int ntell llige igent t Netw twork Systems  IMSA SA Traffic fic Signali gnalizat zatio ion n Level l 2

Alfonso Server CPC Senior ITS/Roadway Inspector

 31 Years ars of Ex Exper perie ience ce in CEI EI Road adway y and d Bridg idge Cons

  • nstr

truct ctio ion n  New Con

  • nst

stru ructi ction Proje jects ts and nd Reha ehabil ilit itat atio ion  Qua uali lifie ied Grout

  • utin

ing g Tech echnician nician 1 & 2  Qua uali lifie ied Post st-Tensi sionin ing g Tech chnic nician an

slide-8
SLIDE 8

CEI Experience & Qualifications

 12 Year ars s of Ex Experi perience ce in CEI EI Road adway y Con

  • nst

stru ructi ction  Previo vious s Ex Experi perience ce as QC Techn echnicia ician & Qua uali lity ty Con Contr trol l In Insp spect ctor  Perform rmed Soi

  • ils

ls Tes esti ting g & Pr & Proct

  • ctors

rs  An Anal alys ysis is of f Soil

  • il Class

ssifi ificat catio ion & Suita uitabilit ility

Gary Odell CPC Roadway Inspector Omel Ramirez CPC Roadway Inspector

 15 Year ars of f Ex Expe perie rience nce in CEI EI Roadw adway y Con

  • nstr

truct ctio ion n  Inspe nspect ctor r on n Krom

  • me Aven

enue South th with th Robe

  • bert Aude

udette, SPE E  Ex Experi perience ced in aspha phalt lt pavin ing, g, con

  • ncre

rete, , ear arth thwork and d lands ndscap caping ing

slide-9
SLIDE 9

CEI Experience & Qualifications

TEAM Certifications & Qualification Matrix

QC Manager MOT - FDOT Advanced MOT - FDOT Intermediate CTQP Final Estimates Level I CTQP Final Estimates Level II CTQP Earthwork Construction Inspection Level I & II CTQP Asphalt Paving Level I & II CTQP Drilled Shaft Inspection CTQP Pile Driving Inspection CTQP Concrete Field Technician Level I ACI Concrete Field Testing Tech Grade 1 Augercast Pile Radiation Safety & Use of Nuclear Density Gauge HAZMAT 49CFHR172 - Subpart H FDEP Stormwater Management Inspector IMSA Traffic Signal Technician Level 1 IMSA Traffic Signal Technician Level 2 FDOT Critical Structures Construction Issues CTQP Post-Tensioning Technician Level I CTQP Grouting Techinica Level I & II Name Project Role TIN # Dan Tintner, P.E. Principal in Charge/Senior Project Manager D53516156

X X X

Robert Audette, P.E. Senior Project Engineer/Project Administrator A33076067

X X X X X X

John Hart, P.E. Quality Assurance/Quality Control H63046164

X X X X X

Winnie Wilson Contract Compliance Specialist/Secretary N/A Leonel Mendieta, EIT Senior Inspector M53352560

X X X X X X X X X

X

X X X X

Carlos Roberts Senior Inspector R16311468

X X X X X X

Alfonso Server Senior ITS Inspector S61600040

X X X X X X X X X X X

Omel Ramirez Inspector R56264581

X X X X X X X X X X X X

Gary Odell Inspector O34028076

X X X X X X X X X X X X X

Alfie Cross, PSM Survey/Utilities N/A

X

Tom English, PSM Survey/Utilities N/A

X

Carnahan, Proctor & Cross, Inc. Certification Matrix

slide-10
SLIDE 10

Education Corridor Improvements Phase III Coconut Creek Parkway from Banks Road to the Florida Turnpike, Coconut Creek, FL

  • Local
  • cal Agen

ency cy Progr

  • gram

am

  • Com
  • mpl

plete Str treets s Projec

  • ject
  • Pede

dest stria rian n Safety ty Up Upgrad rades

  • New

w Bus us Shel elter ers s & B Benc nches es

  • AD

ADA A Com

  • mpliant

liant Side dewal alks ks

  • Draina

nage ge Impr mproveme ements nts

  • Signal

Signaliz izat ation Upgra pgrades

  • Ligh

Lighti ting Im Impr provements ts

  • Land

andsca scape pe & Irriga rrigati tion n Insta nstall llat atio ion

  • Ha

Hardsca cape pe Featu atures res

CEI Experience & Qualifications

“Full Oversight of CEI Services”

slide-11
SLIDE 11

SR AIA Landscaping & Hardscaping Enhancements & West Commercial Boulevard Improvements

  • Local
  • cal Agen

ency cy Progr

  • gram

am

  • Com
  • mpl

plete Str treets s Projec

  • ject
  • Pede

dest stria rian n Safety ty Up Upgrad rades

  • New

w Bus us Shel elter ers s & B Benc nches es

  • AD

ADA A Com

  • mpliant

liant Side dewal alks ks

  • Draina

nage ge Impr mproveme ements nts

  • Signal

Signaliz izat ation Upgra pgrades

  • Ligh

Lighti ting Im Impr provements ts

  • Land

andsca scape pe & Irriga rrigati tion n Insta nstall llat atio ion

  • Ha

Hardsca cape pe Featu atures res

CEI Experience & Qualifications

“Full Oversight of CEI Services”

slide-12
SLIDE 12

SR 834 (Sample Road), SR 7 (441), SR 814 (Atlantic Boulevard) Grouping, Margate, Coconut Creek, Coral Springs and Pompano Beach, FL

  • Impr

proved Traffic fic Oper erat atio ions ns

  • AD

ADA A Pede dest stria rian n Safety ty Up Upgrad rades

  • Major

jor Signali gnalizat zation ion Up Upgrad rades s

  • 20 Drilled

ed Shaft t Mast Ar Arms

  • Gravity

ty Wall Constr nstruc ucti tion

  • n
  • 32

32 Ne New Ligh Light Pole

  • le Sy

Systems

  • Bridg

Bridge Mou Mount nted Ill Illumi minat ated Signs Signs

  • 1050

050 LF LF Alu lumin minum Ra Rail iling ing

  • Dra

Drainag inage Im Improvements

  • Land

andscap cape & I & Irri rriga gati tion n Inst nstal alla lati tion

CEI Experience & Qualifications

“FTBA Best Partnering and Urban Project”

slide-13
SLIDE 13

SR 823 (Red Road/57th Avenue Grouping from W 23rd Street to W 46th Street, Hialeah, FL

  • Major

jor Reco const stru ructi ction of SR 823 23

  • Wide

idening ning from

  • m 4-Lane

anes to 6-Lan Lanes

  • Reco

constr truct ction ion of 8 Int ntersecti ctions

  • Drain

inage age Modifi dificat catio ions

  • Bridge

idge Wide idening ing

  • Chan

annel l Ex Exca cavat ation ion

  • Insta

nstall llat atio ion of 1167 67 Con

  • ncre

rete Piles es

  • Major

jor Signali gnalizat zation ion Up Upgrad rades s

  • 300 New

w Drainage age Structu tures res

  • Installation of 84” Dual Culverts

CEI Experience & Qualifications

“Prudential Productivity Award for Cost Savings”

slide-14
SLIDE 14

SR 997 Krome Avenue from South of Kendall Drive to North of 8th Street, Miami, FL

  • Major

jor Reco const stru ructi ction (36 6 Miles es) ) SR 997

  • Operat

eratio ional al & Safety y Up Upgrad rades

  • Wide

idenin ning g from

  • m 2-Lane

anes to 4-Lan Lanes

  • Milli

ling ng & Resu surfacin acing

  • Drain

inage age Modifi dificat catio ions

  • Bridge

idge No:

  • : 8709

0974 Wide idening ing

  • Barrie

rrier r Wal all

  • Pede

dest stria rian n Raili ling

  • Impr

mproved ed Storm rmwater Draina nage ge

  • Light

hting ing & S & Signa naliz lizat ation ion Upg Upgrad ades

CEI Experience & Qualifications

“Full CEI Oversight Services”

slide-15
SLIDE 15
  • A. Introduction, Experience and Qualifications
  • B. Project Approach & Construction Management-Project Scope

I. Traffic Control Phasing II. Earthwork

  • III. Drainage
  • IV. Widening

V. Milling & Resurfacing

  • VI. Perimeter Walls
  • VII. Signalization & Lighting

VIII.Landscape & Irrigation

  • IX. Complete Streets
  • C. Identification of Potential Issues, Challenges & Solutions

Project Approach & Construction Management

slide-16
SLIDE 16

Project Approach & Construction Management

Understanding of Project Scope

slide-17
SLIDE 17

Project Approach & Construction Management

Traffic Control Phasing Widening Complete Streets Experience Signalization & Lighting Earthwork Drainage Milling & Resurfacing Perimeter Walls Landscape & Irrigation

Understanding of Project Scope

Community Involvement

slide-18
SLIDE 18
  • A. Introduction, Experience and Qualifications
  • B. Project Approach & Construction Management

MOT Coordination I. Adjacent School VII. HOA’s & Businesses II. Pedestrian Traffic VIII. Silver Shores Elementary

  • III. Bus Stops IX. Silver Shores Park
  • IV. Motorist Traffic X. Broward County Transit

V. Business Access XI. Memorial Hospital Miramar

  • VI. TCP (6 Phases) XII. Emergency Services
  • C. Identification of Potential Issues, Challenges & Solutions

Project Approach & Construction Management

slide-19
SLIDE 19
  • A. Introduction, Experience and Qualifications
  • B. Project Approach & Construction Management

Utilities I. FPL II. FPL Fibernet

  • III. AT&T
  • IV. TECO Gas

V. Comcast

  • VI. City of Pembroke Pines
  • VII. City of Miramar
  • C. Identification of Potential Issues, Challenges & Solutions

Project Approach & Construction Management

slide-20
SLIDE 20
  • A. Introduction, Experience and Qualifications
  • B. Project Approach & Construction Management

Environmental I. NPDES II. South Broward Drainage District

  • C. Identification of Potential Issues, Challenges & Solutions

Project Approach & Construction Management

slide-21
SLIDE 21
  • A. Introduction, Experience and Qualifications
  • B. Project Approach & Construction Management

Quality Control I. FDOT Construction Project Administration Manual II. Open Lines of Communication with Stakeholders

  • III. Identification of Potential Conflicts
  • C. Identification of Potential Issues, Challenges & Solutions

Project Approach & Construction Management

slide-22
SLIDE 22

Potential Issues, Challenges & Solutions

Subsoil Excavation

DEMUCKING CHALLENGES: Northern half of Right-of-Way needs to be demucked up to 12’ deep, adjacent to existing roadway. Verify Cores AB-5 (10’), versus MD-7 A to F (less than 5’) SOLUTIONS: CPC will coordinate pre-activity meetings with Contractor and Geotech Engineer to confirm limits of demucking. CPC will perform ground survey in-house.

slide-23
SLIDE 23

Potential Issues, Challenges & Solutions

Maintenance of Traffic

LANE & SIDEWALK CLOSURES CHALLENGES: Silver Shores Elementary School & Silver Shores Park: Traffic backs up on Pembroke Rd. Sidewalks are filled with pedestrians. SOLUTIONS: CPC will be proactive and coordinate any special events, early release dates, etc, with the contractor, School Board Transportation Department, school crossing guards, stakeholders and emergency services to identify any conflicts in advance.

slide-24
SLIDE 24

Potential Issues, Challenges & Solutions

Traffic Control Plan: 6 Phases

CHALLENGES: Phase1: Install erosion control devices and construct North Wall. Close proximity to FPL overhead powerline will require coordination. Phase 2: Construct work on North side. Phase 3: Construct work on South side. Phase 4: Center of Roadway. Phase 5: Milling & Resurfacing. Phase 6: Thermoplastic Pavement. Markings. SOLUTIONS: Proactive Coordination. TCP by Contractor for approval by County

slide-25
SLIDE 25

Potential Issues, Challenges & Solutions

Existing Utilities and New Drainage Structures

CONSTRUCTING NEW DRAINAGE CHALLENGES: Constructing new drainage structures and pipe with existing utilities in close

  • proximity. Our field review and plan review reveals a need for careful utility

verification at several locations. SOLUTIONS: CPC will coordinate with the Contractor to perform pre-trenching at potential conflicts.

slide-26
SLIDE 26

Potential Issues, Challenges & Solutions

Permitting

LOCAL AGENCIES CHALLENGES: Ensure that proper permits are

  • btained by Contractor and comply

with the City of Miramar, City of Pembroke Pines and South Broward Drainage District. (Wall and TCP) SOLUTIONS: CPC currently has a close working relationship with all local agencies and will coordinate with Contractor during all preconstruction meetings, inspections, testing, as-builts and closeout.

slide-27
SLIDE 27

Potential Issues, Challenges & Solutions

Environmental

EROSION CONTROL CHALLENGES: Ensure that proper maintenance of Sediment and Erosion Control is being performed by contractor. SOLUTIONS: CPC will closely review plans and have

  • ngoing inspections of contractor’s

sediment and erosion control system including monitoring the turbidity readings.

slide-28
SLIDE 28

Potential Issues, Challenges & Solutions

Roadway Construction & Public Outreach

AVOIDING COMPLAINTS CHALLENGES: Minimizing complaints from adjacent residents in close proximity. SOLUTIONS: Advance notification to adjacent residents and others.

slide-29
SLIDE 29

Potential Issues, Challenges & Solutions

Signalization & Lighting

SIGNALS & LIGHT POLES CHALLENGES: Avoidance of utility conflicts during installation of new signal foundations and light poles. Ensure all light shields are installed for the entire project limits. SOLUTIONS: CPC will coordinate these issues at the Pre-Construction meeting and all Pre- Activity meetings with the Utility Owners and Contractor and County Engineering Division.

slide-30
SLIDE 30

Potential Issues, Challenges & Solutions

Landscaping & Irrigation

LOCAL AGENCIES & HOA’S CHALLENGES: Existing landscaping and irrigation maintained by HOA’s. New installation of landscape in medians will be maintained by the City

  • f Miramar.

SOLUTIONS: CPC will closely coordinate landscaping and irrigation construction with stakeholders, HOA’s, City of Miramar and the City of Pembroke Pines.