SAE Baja Design Mid-point Presentation Team Drivetrain By - - PowerPoint PPT Presentation

sae baja design
SMART_READER_LITE
LIVE PREVIEW

SAE Baja Design Mid-point Presentation Team Drivetrain By - - PowerPoint PPT Presentation

SAE Baja Design Mid-point Presentation Team Drivetrain By Abdulrahman Almuflih, Andrew Perryman, Caizhi Ming, Zan Zhu, Ruoheng Pan Overview Introduction Parts Order Status Parts completed Engine Mount Parts to be


slide-1
SLIDE 1

SAE Baja Design Mid-point Presentation Team Drivetrain

By Abdulrahman Almuflih, Andrew Perryman, Caizhi Ming, Zan Zhu, Ruoheng Pan

slide-2
SLIDE 2

Overview

  • Introduction
  • Parts Order Status
  • Parts completed
  • Engine Mount
  • Parts to be assembled or made
  • Reshape CVT output pulley
  • Throttle cable
  • Shifter
  • Drip pan and CVT guard
  • Project plan
  • Gantt Chart
  • Conclusions
  • More pictures

Abdulrahman Almuflih

2

slide-3
SLIDE 3

Introduction

3

Abdulrahman Almuflih

Sponsored by SAE

  • Project Description: Design and build Baja

vehicle

  • The Baja competition project in NAU:
  • Frame design
  • Suspension design
  • Drive-train design

For drive-train design:

  • Our team aims to build the drive-train and

assemble it along with the engine so that the Baja vehicle can achieve all of the competition events.

slide-4
SLIDE 4

Parts Order Status

Ordered Parts Quantity Status Engine 1 Arrived Differential 1 Arrived CVT 1 Arrived Shaft 2 Arrived Key 4 Arrived

4

Zan Zhu

slide-5
SLIDE 5

Engine Mount

5

Zan Zhu

slide-6
SLIDE 6

Reshape CVT output pulley

6

Zan Zhu

slide-7
SLIDE 7

Throttle Cable Parts

  • Throttle Cable
  • Cable Stop
  • Ball Joint
  • 90° Elbow

7

Andrew Perryman

slide-8
SLIDE 8

Throttle Cable Detail

  • 96 inches in length
  • Runs along the floor board
  • Provided by Control Cables

Inc.

8

Andrew Perryman

slide-9
SLIDE 9

Gas Pedal

  • Designed for Polaris RZR 900

XP

  • Complete throttle and brake

cluster

  • Selected to fit our throttle

cable design specifically

  • Unfortunately…

Andrew Perryman

9

slide-10
SLIDE 10

Shifter Box

10

Caizhi Ming

slide-11
SLIDE 11

Shifter Cable and Connection

11

Caizhi Ming

slide-12
SLIDE 12

Drip Pan

12

Ruoheng Pan

slide-13
SLIDE 13

CVT Guard

13

Ruoheng Pan

slide-14
SLIDE 14

Project Plan- Spring 2014

Abdulrahman Almuflih

14

slide-15
SLIDE 15

Conclusion

Abdulrahman Almuflih

15

For drive-train design progress:

  • Our team has confirmed that all the ordered parts have been

received.

  • All design process have been completed including CAD

drawing and all that left is building or assembling the system.

  • Some of the parts received needs to be modified to fit our

design.

  • We expect to be able to follow the project plan to finish all
  • f the tasks in a timely manner.
slide-16
SLIDE 16

More Pictures

16

slide-17
SLIDE 17

More Pictures

17