P OTOMAC Y ARD M ETRORAIL S TATION P ROJECT Potomac Yard Metrorail Implementation Work Group March 18, 2019 A GENDA Ongoing Activities PYC/Contractor Update Overview Southwest Entrance Pricing Process Southwest Entrance Matrix


  1. P OTOMAC Y ARD M ETRORAIL S TATION P ROJECT Potomac Yard Metrorail Implementation Work Group March 18, 2019

  2. A GENDA • Ongoing Activities • PYC/Contractor Update • Overview Southwest Entrance Pricing Process • Southwest Entrance Matrix • PYMIG Discussion • Public Discussion • Upcoming Meetings 2 PYMIG| March 18, 2019

  3. O NGOING A CTIVITIES • Submitted Joint Permit Application (JPA) – Corps & DEQ reviewing application – City responding to questions and information requests – Corps & DEQ public comment periods will be posted – DEQ will post their public hearing date • Southwest entrance pricing process 3 PYMIG| March 18, 2019

  4. PYC / C ONTRACTOR U PDATE 4 PYMIG| March 18, 2019

  5. C ONTRACT M ILESTONE S CHEDULE Milestone Schedule Milestone Description 9/25/2018 Status NTP 9/25/2018 Completed 1 DSUP Submission 10/25/18 Completed 2 DSUP Approval 4/13/19 Completed 3 Construction Access and Trailers 8/21/19 4 Approvals and Permits 4/22/20 5 Complete Comm/IT Rooms and Systems Facilities 9/29/21 6 WMATA Complete IT Room 10/29/21 Complete Preparation for X-Over Installation and 7 11/28/21 Track Cut-OverStation Structure and Track Work 8 Readiness for Installation of Fare Equipment 2/26/22 9 Final Station Completion 3/28/22 5 PYMIG| March 18, 2019

  6. S UMMARY L OOK A HEAD S CHEDULE 2019 ACTIVITY MAR APR MAY JUN JUL AUG SEP OCT PERMITS DESIGN SURVEY STATION DESIGN RELOCATE TOT LOT AND ADJUST TRAFFIC CIRCLE SECURE AND SETUP PARKING/STAGING AREAS/TRAILERS DOCUMENTATION OF EXISTING CONDITIONS CONSTRUCTION OF WORK BRIDGE OVER WMATA TRACKS CONSTRUCTION OF AC SWITCHGEAR BUILDING INSTALL ELECTRIC/STORM DRAIN/WATER ETC. UNDER WMATA TRACKS PLACE FILL FOR STATION 6 PYMIG| March 18, 2019

  7. C LOSEST S TRUCTURE TO P ILE D RIVING 7 PYMIG| March 18, 2019

  8. P ILE D RIVING I MPACTS ON A DJACENT S TRUCTURES 8 PYMIG| March 18, 2019

  9. D OCUMENTATION OF EXISTING CONDITIONS 9 PYMIG| March 18, 2019

  10. D OCUMENTATION OF EXISTING CONDITIONS 10 PYMIG| March 18, 2019

  11. S TAGING A REA 11 PYMIG| March 18, 2019

  12. C ONTINUED : S TAGING A REA 12 PYMIG| March 18, 2019

  13. C ONTINUED : S TAGING A REA 13 PYMIG| March 18, 2019

  14. S OUTHWEST E NTRANCE P RICING P ROCESS 14 PYMIG| March 18, 2019

  15. S OUTHWEST E NTRANCE P RICING PROCESS • TASK 1 – Advance engineering sufficiently to allow the performance of independent cost estimates and schedule impact analyses for each of the 3 ideas – Approximately two months to complete (Early April) • TASK 2 – WMATA and PYC will both perform the cost estimates and schedule analyses – The cost and schedule analysis results will be included in the Matrix – Approximately one month to complete (Early May) 15 PYMIG| March 18, 2019

  16. WMATA P ROCESS • Using PYC for analysis activates the contract procurement process for a contract change • Requires additional level of documentation and adherence to process, so as not to compromise ability to use PYC to perform • Once Task 2 is completed WMATA will present publicly the analysis of the options 16 PYMIG| March 18, 2019

  17. S OUTHWEST E NTRANCE D ESIGN I DEA #1 S OUTHWEST E NTRANCE P AVILION W / B RIDGE 17 PYMIG| March 18, 2019

  18. S OUTHWEST E NTRANCE D ESIGN I DEA #2 E. G LEBE R AMP W / MOVING WALKWAY 18 PYMIG| March 18, 2019

  19. S OUTHWEST E NTRANCE D ESIGN I DEA #3 S OUTHWEST E NTRANCE P AVILION W / S MALL M EZZANINE 19 PYMIG| March 18, 2019

  20. S OUTHWEST E NTRANCE M ATRIX 20 PYMIG| March 18, 2019

  21. S OUTHWEST E NTRANCE M ATRIX • Did we get the criteria right? • Did we get the criteria definitions right? • Is there something missing? • Matrix Development Process – Initial discussion – Based on input received tonight, refine matrix criteria and bring back to PYMIG for verification 21 PYMIG| March 18, 2019

  22. M ATRIX – S OUTHWEST E NTRANCE 22 PYMIG| March 18, 2019

  23. 23 PYMIG| March 18, 2019

  24. Discussion 24 PYMIG| March 18, 2019

  25. U PCOMING PYMIG M EETINGS • Monday, April 22 nd : – Contractor update – Matrix discussion • Tuesday, May 21 st : – Contractor update – Southwest entrance alternatives update 25 PYMIG| March 18, 2019

Download Presentation
Download Policy: The content available on the website is offered to you 'AS IS' for your personal information and use only. It cannot be commercialized, licensed, or distributed on other websites without prior consent from the author. To download a presentation, simply click this link. If you encounter any difficulties during the download process, it's possible that the publisher has removed the file from their server.