P OTOMAC Y ARD M ETRORAIL S TATION P ROJECT Potomac Yard Metrorail Implementation Work Group April 22, 2019 A GENDA Ongoing Activities PYC/Contractor Pre-construction Update Update on Southwest Entrance Pricing Process Southwest


slide-1
SLIDE 1

POTOMAC YARD METRORAIL STATION PROJECT

Potomac Yard Metrorail Implementation Work Group April 22, 2019

slide-2
SLIDE 2

PYMIG| April 22, 2019

AGENDA

  • Ongoing Activities
  • PYC/Contractor Pre-construction Update
  • Update on Southwest Entrance Pricing Process
  • Southwest Entrance Design Ideas
  • Southwest Entrance Objective Statement &

Matrix

2

slide-3
SLIDE 3

PYMIG| April 22, 2019

ONGOING ACTIVITIES

  • Submitted Joint Permit Application (JPA)

– Army Corps has posted their public notice

  • April 5th – May 6th
  • www.nao.usace.army.mil/Media/Public-

Notices/Article/1806450/nao-2012-02012

  • https://www.alexandriava.gov/potomacyard/default.aspx?id=10

1657#April2019

– DEQ continues reviewing application – City responding to questions and information requests – DEQ will post their public comment period and hearing date

  • Southwest entrance pricing process

3

slide-4
SLIDE 4

PYMIG| April 22, 2019

PYC / CONTRACTOR UPDATE

4

slide-5
SLIDE 5

PYMIG| April 22, 2019

SUMMARY LOOK AHEAD SCHEDULE

5

slide-6
SLIDE 6

PYMIG| April 22, 2019

SOUTHWEST ENTRANCE PRICING PROCESS

6

slide-7
SLIDE 7

PYMIG| April 22, 2019

SOUTHWEST ENTRANCE PRICING PROCESS

  • TASK 1 - Completed

– Advance engineering sufficiently to allow the performance of independent cost estimates and schedule impact analyses for each of the 3 ideas – Approximately two months to complete (April)

  • TASK 2 – On going

– WMATA and PYC will both perform the cost estimates and schedule analyses – The cost and schedule analysis results will be included in the Matrix – Approximately one month to complete (May)

7

slide-8
SLIDE 8

PYMIG| April 22, 2019

SOUTHWEST ENTRANCE DESIGN IDEA #1

SOUTHWEST ENTRANCE PAVILION W/ BRIDGE

8

slide-9
SLIDE 9

PYMIG| April 22, 2019

SOUTH ENTRANCE DESIGN IDEA #1

SOUTH ENTRANCE PAVILION W/ BRIDGE

9

As presented during the 1/14/19 and 3/18/19 PYMIG meetings

slide-10
SLIDE 10

PYMIG| April 22, 2019

SOUTHWEST ENTRANCE DESIGN IDEA #1

SOUTHWEST ENTRANCE PAVILION GROUND AND MEZZANINE FLOOR PLAN

10

slide-11
SLIDE 11

PYMIG| April 22, 2019

SOUTHWEST ENTRANCE DESIGN IDEA #1

SOUTHWEST ENTRANCE PAVILION EAST AND WEST ELEVATION

11

slide-12
SLIDE 12

PYMIG| April 22, 2019

SOUTHWEST ENTRANCE DESIGN IDEA #1

BRIDGE – TYPICAL SECTION

12

22’ – 7 9/16” 12’

slide-13
SLIDE 13

PYMIG| April 22, 2019

SOUTHWEST ENTRANCE DESIGN IDEA #1

SOUTHWEST ENTRANCE PAVILION LOOKING NORTHEAST

13

slide-14
SLIDE 14

PYMIG| April 22, 2019

SOUTHWEST ENTRANCE DESIGN IDEA #2

  • E. GLEBE RAMP W/ MOVING WALKWAY

14

slide-15
SLIDE 15

PYMIG| April 22, 2019

SOUTH ENTRANCE DESIGN IDEA #2

  • E. GLEBE RAMP W/ MOVING WALKWAY

15

As presented during the 1/14/19 and 3/18/19 PYMIG meetings

slide-16
SLIDE 16

PYMIG| April 22, 2019

SOUTHWEST ENTRANCE DESIGN IDEA #2

  • E. GLEBE RAMP W/ MOVING WALKWAY – WEST AND EAST ELEVATION

16

slide-17
SLIDE 17

PYMIG| April 22, 2019

SOUTHWEST ENTRANCE DESIGN IDEA #2

  • E. GLEBE RAMP W/ MOVING WALKWAY – WEST AND EAST ELEVATION

17

slide-18
SLIDE 18

PYMIG| April 22, 2019

SOUTHWEST ENTRANCE DESIGN IDEA #2

RAMP – TYPICAL SECTION

18

6’ 24’ 34’

slide-19
SLIDE 19

PYMIG| April 22, 2019

SOUTHWEST ENTRANCE DESIGN IDEA #2

RAMP WITH MOVING WALKWAY LOOKING NORTH

19

slide-20
SLIDE 20

PYMIG| April 22, 2019

SOUTHWEST ENTRANCE DESIGN IDEA #2

RAMP WITH MOVING WALKWAY LOOKING SOUTH

20

slide-21
SLIDE 21

PYMIG| April 22, 2019

SOUTHWEST ENTRANCE DESIGN IDEA #3

SOUTHWEST ENTRANCE PAVILION W/ SMALL MEZZANINE

21

slide-22
SLIDE 22

PYMIG| April 22, 2019

SOUTH ENTRANCE DESIGN IDEA #3

SOUTH ENTRANCE PAVILION W/ SMALL MEZZANINE

22

As presented during the 1/14/19 and 3/18/19 PYMIG meetings

slide-23
SLIDE 23

PYMIG| April 22, 2019

SOUTH ENTRANCE DESIGN IDEA #3-PYC PROPOSAL

SOUTH ENTRANCE PAVILION W/ SMALL MEZZANINE

23

(2) Elevators (1) Stair

(4)

East/West pedestrian crossing now located at southern bridge

Relocate Fare Gates to Mezzanine

slide-24
SLIDE 24

PYMIG| April 22, 2019

SOUTHWEST ENTRANCE DESIGN IDEA #3

SOUTH PAVILION GROUND & MEZZANINE FLOOR PLAN

24

slide-25
SLIDE 25

PYMIG| April 22, 2019

SOUTHWEST ENTRANCE DESIGN IDEA #3

SOUTH PAVILION EAST AND WEST ELEVATION

25

slide-26
SLIDE 26

PYMIG| April 22, 2019

SOUTHWEST ENTRANCE DESIGN IDEA #3

WEST ELEVATION / SOUTH ELEVATION

26

slide-27
SLIDE 27

PYMIG| April 22, 2019

SOUTHWEST ENTRANCE DESIGN IDEA #3

SOUTH MEZZANINE-WEST ELEVATION

27

slide-28
SLIDE 28

PYMIG| April 22, 2019

SOUTHWEST ENTRANCE DESIGN IDEA #3

SOUTH MEZZANINE-EAST ELEVATION SECTION

28

slide-29
SLIDE 29

PYMIG| April 22, 2019

SOUTHWEST ENTRANCE DESIGN IDEA #3

SOUTH MEZZANINE – PLATFORM FLOOR PLAN

29

S.E. Station entrance – Elevators to pedestrian bridge and fare gates

slide-30
SLIDE 30

PYMIG| April 22, 2019

SOUTHWEST ENTRANCE DESIGN IDEA #3

SOUTH MEZZANINE – MEZZANINE FLOOR PLAN

30

slide-31
SLIDE 31

PYMIG| April 22, 2019

SOUTHWEST ENTRANCE DESIGN IDEA #3

SOUTH PAVILION AND SOUTH MEZZANINE LOOKING SOUTHEAST

31

slide-32
SLIDE 32

PYMIG| April 22, 2019

SOUTHWEST ENTRANCE DESIGN IDEA #3

SOUTH MEZZANINE LOOKING NORTHWEST

32

slide-33
SLIDE 33

PYMIG| April 22, 2019

SOUTHWEST ENTRANCE OBJECTIVE STATEMENT & MATRIX

33

slide-34
SLIDE 34

PYMIG| April 22, 2019

COMMENTS FROM THE PREVIOUS MEETING

  • Develop an objective statement

– Define what we are trying to accomplish

  • Use low/medium/high rating for Matrix
  • ADD:

– Travel times

  • People wheelchair bound & able-bodied

– Operation & Maintenance cost – Travel experience:

  • Quality of walk
  • Level of effort required (ramps, stairs, elevators)
  • Noise
  • Safety / Crime

– Economic potential - with respect to south PY development

34

slide-35
SLIDE 35

PYMIG| April 22, 2019

OBJECTIVE STATEMENT

“Based on the Amazon corporate headquarters arrival to the National Landing area, the

  • bjective is to enhance the Potomac Yard Metro

southwest station entrance by maximizing accessibility and improving mobility to the

  • station. Increasing station visibility and

desirability will maximize access and economic potential for the Potomac Yard area.”

35

slide-36
SLIDE 36

PYMIG| April 22, 2019

MATRIX – SOUTHWEST ENTRANCE

36

slide-37
SLIDE 37

PYMIG| April 22, 2019

MATRIX – SOUTHWEST ENTRANCE

37

slide-38
SLIDE 38

PYMIG| April 22, 2019

TRAVEL TIME CALCULATIONS

  • Starting point: East

Glebe Rd & Potomac Ave

  • Ending point: Fare

Gates

  • Factors:

– Walking speed ranges based on industry design standards – Level of effort exerted for each

  • ption

– Potential wait times for elevators

38

slide-39
SLIDE 39

PYMIG| April 22, 2019

Discussion

39

slide-40
SLIDE 40

PYMIG| April 22, 2019

UPCOMING PYMIG MEETING

  • Tuesday, May 21st:

– Contractor update

  • Summer construction activities

– Southwest entrance update

  • Early June Meeting (TBD):

– Contractor update – Southwest entrance update

40