Road Weather Information Systems Matthew Glasse sser Assis istan - PowerPoint PPT Presentation

Road Weather Information Systems Matthew Glasse sser Assis istan ant S Stat ate I ITS E Engin ineer Background Background Background Severe Winter Weather Warning and Preparedness Task Force Infrastructure Improvement $14.5 .5


  1. Road Weather Information Systems Matthew Glasse sser Assis istan ant S Stat ate I ITS E Engin ineer

  2. Background

  3. Background

  4. Background

  5. Severe Winter Weather Warning and Preparedness Task Force

  6. Infrastructure Improvement $14.5 .5 millio lion b n bonds s sold ld $3 million – Snow/Ice Removal Equipment • $6 million – ITS Expansion on I-20 • $5.5 million – Statewide ITS Deployment •

  7. Statewide ITS Deployment $5.5 .5 m million f llion for fast r response I ITS $2.5 million – 20 CMS • $2 million – 80+ CCTV • $1 million – 27 RWIS •

  8. RWIS Timeline July: Seek out and test RWIS technology • August: Begin scope development • Mid-October: Solicitation Posted • Mid-November: Contract Awarded • Late December: Phase 1 Complete • Late January: Phase 2 Complete •

  9. Phase 1 Me Metro A Atla lanta Macon

  10. Phase 2 North G Georgia rgia

  11. Data Collection Wind Speed • Wind • Direction

  12. Data Collection Water • Thickness Grip • Surface • State

  13. Data Collection Surface Temp • Air Temp • Relative • Humidity Dew Point •

  14. Data Collection Precip. • Type Precip. • Intensity Visibility •

  15. Data Collection Relative • Humidity Air Temp •

  16. Data Collection Air Pressure •

  17. Data Collection Sub-Surface • Temp

  18. Data Collection 4G

  19. Viewing the Data

  20. How currently use it • Deicing efforts • Mobilize faster • Proactively treat roads • Target problem areas • Alert travel public via CMS • Internal alerts • Reduce speed limit in VSL zone • Data provided to public via NWS and News Stations

  21. How could we use it? • Change timing plans • Better predicting and understanding of roadways • Fog alerts • Hydroplaning alerts • Hurricane evacuation

  22. Challenges • GDOT Perception • Alert Oversaturation • Data Comprehension • Personnel Access • Data trust • Public Perception • CMS Messaging • Date Comprehension

  23. Moving Forward • Data sharing with neighboring states • RWIS Expansion • GDOT • Local Agencies • Provide scaled down RWIS for intersection use

  24. Questions? Matthew Glasser Assistant State ITS Engineer Georgia DOT mglasser@dot.ga.gov (404) 635-2836

  25. ideas -tim imeli line o e of events -wor orki king w with th N NWS WS -RWI WIS Pha Phase 1 1 -RWI WIS Pha Phase 2 2 -what at data d a do w we c colle llect? -ho how do do w we use se t thi his? s? -how d doe oes th this r rel elate to o ever eryone -enco count untere red p prob oblem lems -goin oing f g forward rd ( (team eaming w ing with o other s r stat ates)

  26. Statewide ITS Deployment Phase 1 Pha 1 15 Metro Atlanta 11 North Georgia 1 Macon 34 34 new CCT w CCTVs 23 Standalone systems 11 RWIS-CCTV systems Complet eted Janu January 3 31, 2 2015

  27. Phase 2 20 C CMS MS 16 statewide replacement signs 4 new locations 50 0 CCTV & & RD RDS Expected Comp mpleti tion on o of Octob ober er 1, 2 , 2015

  28. Background

Download Presentation
Download Policy: The content available on the website is offered to you 'AS IS' for your personal information and use only. It cannot be commercialized, licensed, or distributed on other websites without prior consent from the author. To download a presentation, simply click this link. If you encounter any difficulties during the download process, it's possible that the publisher has removed the file from their server.