Lost Creek Drive Road Rebuild Project Fall 2018 Public Works Street Division WWW.Columbia.SC.Gov/Engineering Public Works Street Division Overview Why Road Work is Needed Reclamation Method Project Schedule Lane Closures


slide-1
SLIDE 1

WWW.Columbia.SC.Gov/Engineering

Lost Creek Drive Road Rebuild Project

Fall 2018

Public Works – Street Division

slide-2
SLIDE 2

Public Works – Street Division

slide-3
SLIDE 3

Overview

  • Why Road Work is Needed
  • Reclamation Method
  • Project Schedule
  • Lane Closures & Delays
  • Things to Consider
  • Resources Available to You

Public Works – Street Division

slide-4
SLIDE 4

Why Road Work is Needed

  • Road is in need of repairs due to major base failures
  • Normal method is pothole repair
  • Soil under Lost Creek Drive is currently not stable

enough for long term pothole patching or standard

  • verlay

Public Works – Street Division

slide-5
SLIDE 5

Method for Reclamation

Public Works – Street Division

slide-6
SLIDE 6

Method for Reclamation

  • Full depth reclamation with cement

○ Recycle existing roadway ○ Added cement stabilizes road base

  • Steps in process

○ Pulverize existing base ○ Mix in-place with water & cement ○ Grade & Compact Base ○ Wet Cure – Strength & Dust ○ Pave

Public Works – Street Division

slide-7
SLIDE 7

Project Schedule

  • Bid Contract – Complete

○ – Awarded to Armstrong Contractors, LLC

  • Construction Schedule

○ – Construction Phases

  • Will Take Approximately 15 weeks
  • Milling Phase
  • Cement (CMRB) Phase
  • Paving Phase

Public Works – Street Division

slide-8
SLIDE 8

Milling Phase

Public Works – Street Division

slide-9
SLIDE 9

Cement Phases

Public Works – Street Division

slide-10
SLIDE 10

Paving Phases

Public Works – Street Division

slide-11
SLIDE 11

Traffic by Hour in Chestnut Hill

Public Works – Street Division

slide-12
SLIDE 12

Lane Closures & Delays

○ The Contractor will enforce traffic control ○ Access to entrances ○ Efforts to control dust ○ Cure period of CMRB “Reclaimed” roadway (Wet Cure) ○ Construction will take place between the hours of 7:30 a.m.-5:30 p.m.,

Monday morning to Friday evening

Public Works – Street Division

slide-13
SLIDE 13

Stationary Construction Signs 500’ from Intersections

slide-14
SLIDE 14

Flagger and Pilot Cars

  • Flaggers and possibly a pilot car will be used during

construction operations to assist with guiding residents through the construction zone

  • Please forgive the delays for these measures/procedures

are in place to provide continuous safe travel to Chestnut Hill residents within the construction zone

Public Works – Street Division

slide-15
SLIDE 15

Public Works – Street Division

Is It Ok To Pave In The Rain?

slide-16
SLIDE 16

Considerations

  • Weather Restrictions
  • Rain
  • If Temperature < 55 °F – cannot pave
  • Utilities

○ Although utilities are supposed to be marked there is a high probability that

something is underground that is unknown.

○ Not uncommon to have depths above expected levels

  • Other Considerations

○ Murphy’s Law

Public Works – Street Division

slide-17
SLIDE 17

Social Media

  • Posts Will be each Friday at 7:30 p.m.
  • Facebook

○ Construction status reports weekly ○ Updates on lane shifts and progress

  • www.facebook.com/COCPublicWorks
  • Twitter

○ Construction status reports weekly ○ Updates on lane shifts and progress

  • www.twitter.com/COCPublicWorks

Public Works – Street Division

#LostCreekPaving

slide-18
SLIDE 18

WWW.Columbia.SC.Gov/Engineering

Questions

Public Works – Street Division

Fall 2018