Road Rebuild Project Fall 2018 Public Works Street Division - PowerPoint PPT Presentation

Lost Creek Drive Road Rebuild Project Fall 2018 Public Works Street Division WWW.Columbia.SC.Gov/Engineering Public Works Street Division Overview Why Road Work is Needed Reclamation Method Project Schedule Lane Closures


  1. Lost Creek Drive Road Rebuild Project Fall 2018 Public Works – Street Division WWW.Columbia.SC.Gov/Engineering

  2. Public Works – Street Division

  3. Overview ● Why Road Work is Needed ● Reclamation Method ● Project Schedule ● Lane Closures & Delays ● Things to Consider ● Resources Available to You Public Works – Street Division

  4. Why Road Work is Needed ● Road is in need of repairs due to major base failures ● Normal method is pothole repair ● Soil under Lost Creek Drive is currently not stable enough for long term pothole patching or standard overlay Public Works – Street Division

  5. Method for Reclamation Public Works – Street Division

  6. Method for Reclamation ● Full depth reclamation with cement ○ Recycle existing roadway ○ Added cement stabilizes road base ● Steps in process ○ Pulverize existing base ○ Mix in-place with water & cement ○ Grade & Compact Base ○ Wet Cure – Strength & Dust ○ Pave Public Works – Street Division

  7. Project Schedule ● Bid Contract – Complete ○ – Awarded to Armstrong Contractors, LLC ● Construction Schedule ○ – Construction Phases ● Will Take Approximately 15 weeks ● Milling Phase ● Cement (CMRB) Phase ● Paving Phase Public Works – Street Division

  8. Milling Phase Public Works – Street Division

  9. Cement Phases Public Works – Street Division

  10. Paving Phases Public Works – Street Division

  11. Traffic by Hour in Chestnut Hill Public Works – Street Division

  12. Lane Closures & Delays ○ The Contractor will enforce traffic control ○ Access to entrances ○ Efforts to control dust ○ Cure period of CMRB “Reclaimed” roadway (Wet Cure) ○ Construction will take place between the hours of 7:30 a.m.-5:30 p.m., Monday morning to Friday evening Public Works – Street Division

  13. Stationary Construction Signs 500’ from Intersections

  14. Flagger and Pilot Cars ● Flaggers and possibly a pilot car will be used during construction operations to assist with guiding residents through the construction zone ● Please forgive the delays for these measures/procedures are in place to provide continuous safe travel to Chestnut Hill residents within the construction zone Public Works – Street Division

  15. Is It Ok To Pave In The Rain? Public Works – Street Division

  16. Considerations ● Weather Restrictions ● Rain ● If Temperature < 55 °F – cannot pave ● Utilities ○ Although utilities are supposed to be marked there is a high probability that something is underground that is unknown. ○ Not uncommon to have depths above expected levels ● Other Considerations ○ Murphy’s Law Public Works – Street Division

  17. Social Media ● Posts Will be each Friday at 7:30 p.m. ● Facebook ○ Construction status reports weekly ○ Updates on lane shifts and progress ● www.facebook.com/COCPublicWorks ● Twitter ○ Construction status reports weekly ○ Updates on lane shifts and progress ● www.twitter.com/COCPublicWorks #LostCreekPaving Public Works – Street Division

  18. Questions Fall 2018 Public Works – Street Division WWW.Columbia.SC.Gov/Engineering

Download Presentation
Download Policy: The content available on the website is offered to you 'AS IS' for your personal information and use only. It cannot be commercialized, licensed, or distributed on other websites without prior consent from the author. To download a presentation, simply click this link. If you encounter any difficulties during the download process, it's possible that the publisher has removed the file from their server.