Lost Creek Drive Road Rebuild Project Fall 2018 Public Works Street Division WWW.Columbia.SC.Gov/Engineering Public Works Street Division Overview Why Road Work is Needed Reclamation Method Project Schedule Lane Closures
Public Works – Street Division
Overview
- Why Road Work is Needed
- Reclamation Method
- Project Schedule
- Lane Closures & Delays
- Things to Consider
- Resources Available to You
Public Works – Street Division
Why Road Work is Needed
- Road is in need of repairs due to major base failures
- Normal method is pothole repair
- Soil under Lost Creek Drive is currently not stable
enough for long term pothole patching or standard
- verlay
Public Works – Street Division
Method for Reclamation
Public Works – Street Division
Method for Reclamation
- Full depth reclamation with cement
○ Recycle existing roadway ○ Added cement stabilizes road base
- Steps in process
○ Pulverize existing base ○ Mix in-place with water & cement ○ Grade & Compact Base ○ Wet Cure – Strength & Dust ○ Pave
Public Works – Street Division
Project Schedule
- Bid Contract – Complete
○ – Awarded to Armstrong Contractors, LLC
- Construction Schedule
○ – Construction Phases
- Will Take Approximately 15 weeks
- Milling Phase
- Cement (CMRB) Phase
- Paving Phase
Public Works – Street Division
Milling Phase
Public Works – Street Division
Cement Phases
Public Works – Street Division
Paving Phases
Public Works – Street Division
Traffic by Hour in Chestnut Hill
Public Works – Street Division
Lane Closures & Delays
○ The Contractor will enforce traffic control ○ Access to entrances ○ Efforts to control dust ○ Cure period of CMRB “Reclaimed” roadway (Wet Cure) ○ Construction will take place between the hours of 7:30 a.m.-5:30 p.m.,
Monday morning to Friday evening
Public Works – Street Division
Stationary Construction Signs 500’ from Intersections
Flagger and Pilot Cars
- Flaggers and possibly a pilot car will be used during
construction operations to assist with guiding residents through the construction zone
- Please forgive the delays for these measures/procedures
are in place to provide continuous safe travel to Chestnut Hill residents within the construction zone
Public Works – Street Division
Public Works – Street Division
Is It Ok To Pave In The Rain?
Considerations
- Weather Restrictions
- Rain
- If Temperature < 55 °F – cannot pave
- Utilities
○ Although utilities are supposed to be marked there is a high probability that
something is underground that is unknown.
○ Not uncommon to have depths above expected levels
- Other Considerations
○ Murphy’s Law
Public Works – Street Division
Social Media
- Posts Will be each Friday at 7:30 p.m.
○ Construction status reports weekly ○ Updates on lane shifts and progress
- www.facebook.com/COCPublicWorks
○ Construction status reports weekly ○ Updates on lane shifts and progress
- www.twitter.com/COCPublicWorks
Public Works – Street Division
#LostCreekPaving