RICHLAND COUNTY TRANSPORTATION PENNY PROGRAM Town of Irmo January - PDF document

RICHLAND COUNTY TRANSPORTATION PENNY PROGRAM Town of Irmo January 10, 2019 Program Funding Categories Bike / Ped./ Administration, Greenway, $32,100,000 $80,888,356 Bus Service, Roadway $300,991,000 Projects, $656,020,644 Summary of


  1. RICHLAND COUNTY TRANSPORTATION PENNY PROGRAM Town of Irmo January 10, 2019

  2. Program Funding Categories Bike / Ped./ Administration, Greenway, $32,100,000 $80,888,356 Bus Service, Roadway $300,991,000 Projects, $656,020,644 Summary of Bike/Ped./Greenway, Administration, and Roadway Projects= $769,009,000

  3. Projects By The Numbers 87 BIKEWAYS 15 GREENWAYS 15 INTERSECTIONS 7 NEIGHBORHOOD IMPROVEMENTS 56 SIDEWALKS 5 SPECIAL PROJECTS 14 WIDENINGS

  4. Financials To Date $ 320.3 M Sales Tax Collections $ 15.7 M Outside Funding $ 89.9 M Disbursed to Comet $ 12.3 M Mitigation Bank $ 17.2 M Program Expenditures $ 196.3 M Project Expenditures $ 38.3 M Design / Planning & Delivery $ 9.7 M Right-of-Way $ 148.2 M Construction $ 316 M Total Expenditures To Date

  5. www.richlandpenny.com CALL EMAIL INFO@RICHLANDPENNY.COM 1-844-RC PENNY

  6. Interactive Map CALL EMAIL INFO@RICHLANDPENNY.COM 1-844-RC PENNY

  7. Clemson Road Widening Clemson Road (Chimneyridge Drive to Old Clemson Road) CALL EMAIL INFO@RICHLANDPENNY.COM 1-844-RC PENNY

  8. Recent Construction Three Rivers Greenway CALL EMAIL INFO@RICHLANDPENNY.COM 1-844-RC PENNY

  9. Recent Construction Shop Road Extension – Phase 1 CALL EMAIL INFO@RICHLANDPENNY.COM 1-844-RC PENNY

  10. Recent Construction North Main Street Widening CALL EMAIL INFO@RICHLANDPENNY.COM 1-844-RC PENNY

  11. Recent Construction Sidewalk Construction CALL EMAIL INFO@RICHLANDPENNY.COM 1-844-RC PENNY

  12. Recent Construction CALL EMAIL INFO@RICHLANDPENNY.COM 1-844-RC PENNY

  13. Construction Complete Bluff Road Widening – Phase 1

  14. Construction Complete Greene St Improvements – Phase 1

  15. Construction Complete Summit Ridge / Summit Pkwy Kennerly Rd / Coogler Rd

  16. Construction Complete Broad River Rd / Rushmore Rd North Springs Rd / Risdon Way

  17. Construction Complete Farrow Rd / Pisgah Church Rd North Springs Rd / Clemson Rd / Rhame Rd

  18. Construction Complete Lincoln Tunnel Greenway

  19. Construction Complete Riverbanks Zoo Pedestrian Bridge

  20. Construction Complete Franklin St. Wildwood Ave. Windover St.

  21. District 1 Active / Completed Projects Roadway Widening • Broad River Rd Widening Intersections • Kennerly Rd / Coogler Rd Sidewalks / Bikeways • along Broad River Rd Roadway Resurfacing Broad River Corridor Improvements • Completed (59) Greystone Blvd Intersection • • Construction Phase (37) Bush River Rd Intersection • St. Andrews Rd Intersection • CALL EMAIL INFO@RICHLANDPENNY.COM 1-844-RC PENNY

  22. District 1 Active / Completed Projects Dirt Road Paving Completed Projects (6) In Construction / Procurement (8) Amenity Ct Amick Dr • • Cabin Cove Rd Howard Coogler Rd • • Cedar Grove Ln Julian Addy Cir • • Miller Rd Manus Rd • • Shady Grove Church Rd Ken Webber Rd • • Tiger Paw Ln Summer Haven Rd • • Haven Cir • In Design / Rights of Way (5) Mrs Macks Rd • Stone House Dr • Tall Oaks Dr • Eastview Dr Upcoming Projects (11) • Ollie Dailey Rd • Thelma Hicks Rd • CALL EMAIL INFO@RICHLANDPENNY.COM 1-844-RC PENNY

  23. Kennerly/Coogler Roundabout

  24. Broad River Rd Widening END PROJECT Shady Grove Rd . Dutch Fork Rd. Koon Rd . END PROJECT Shady Grove Rd. BEGIN PROJECT Royal Tower Rd . Farming Creek Rd . Woodrow St. CALL EMAIL INFO@RICHLANDPENNY.COM 1-844-RC PENNY

  25. Broad River Rd Widening Project Data Ranked #10 of (14) Roadway Widenings • Approx. 2.5 miles of improvements • Approx. 22,500 vehicles per day (current) • Approx. 34,500 vehicles per day (2043) • High vehicular accident statistics (rear-end/angle) • Current Cost Estimate = approx. $40 million •

  26. Broad River Rd Widening Typical Section 85 FEET CALL EMAIL INFO@RICHLANDPENNY.COM 1-844-RC PENNY

  27. Project Development Activities To-Date Traffic Counts / Studies Preliminary Roadway Design • • Field Surveys Value Engineering • • Utility Surveys (SUE) Alignment Studies / Revisions • • Preliminary Geotechnical Studies Intersection Studies / Relocations • • Jurisdictional Determinations Cost Evaluations • • Cultural Resource Studies Rights-of-Way Roadway Design • • Hazardous Material Studies Utility Coordination • • Pavement Evaluation & Design SCDOT Coordination • • Public Meeting / Public Coord. •

  28. Project Development Process Data Collections / Project Studies • Preliminary Design & Plans • Design Verifications & Value Engineering • • Rights-of-Way Plans & Acquisitions Construction Design & Plans • Project Letting •

  29. Project Challenges High Peak Traffic Volumes • Multiple Failing Traffic Movements • Existing & Current Development • Rights-of-Way Impacts • Geometry & Intersection Modifications • Utility Coordination / Utility Relocations •

  30. Project Schedule Begin Rights-of-Way Acquisitions 3 rd quarter 2019 Begin Construction 2021 Construction Duration approx. 24 – 30 months

  31. Richland County Transportation Penny Program RICHLANDPENNY.COM 201 ARBOR LAKE DRIVE COLUMBIA, SC 29223 1-844-RC PENNY

Download Presentation
Download Policy: The content available on the website is offered to you 'AS IS' for your personal information and use only. It cannot be commercialized, licensed, or distributed on other websites without prior consent from the author. To download a presentation, simply click this link. If you encounter any difficulties during the download process, it's possible that the publisher has removed the file from their server.