Replacement Castlebrae High School

The Site

Tree from original field boundary East Neighbourhood Centre and Library Proposed School site Harewood Drive Retail Units Existing stone wall forming boundary Arthur’s Seat (behind trees) Castlebrae Business Centre Proposed School site East Neighbourhood Centre and Library Existing Library garden

Online: www.edinburgh.gov.uk/newcastlebraehighschool Email: newcastlebrae@edinburgh.gov.uk Comments can be made until Monday 4th March

Have your say... Have your say...

slide-2
SLIDE 2

The Terraces

The Terraces provide a comfortable outdoor dining, social or teaching space with terraced seating and views to Arthurs Seat. This will also be one of the main

  • utdoor routes from lower to

upper ground floors

Replacement Castlebrae High School

External Spaces

Town Square

As part of the construction works taking place for the School, we will link the paved areas outside the East Neighbourhood Centre and retail units to complete the Town Square which was part of the 2014 masterplan. This area could become a focal point for the community

The Wetlands

The Wetlands provide a sustainable drainage solution for the School which can be used as a safe learning environment for Science and other subjects

3G Pitch

A floodlit, professional quality 3G sports pitch - this will be available out of hours for community use, through Edinburgh Leisure

Memorial to Craig Millar

There are a number of

  • ptions available for the

Craig Millar memorial which currently sits in the centre of the site. a/ Leave the existing Memorial where it is (not always accessible to the public within the secure School grounds; b/ Mark the original location within the School grounds and move the Memorial closer to Harewood Drive to allow it to be accessed by the public at any time.

Recreation Area

An open grassed area for general recreation and active play for the School, which could also be available for community use by arrangement with the School

Futureproofing Castlebrae

The initial proposals are designed to accommodate 700 pupils. As part of the design process, the team have been asked to consider how the School could be extended to accommodate up to 1200 pupils as part of an Expansion Strategy. Phase 2 will involve an extension to the north of the School building including additional teaching accommodation, along with an enlarged car park and extra Sports pitch. The team have also considered how best to extend a School with minimal disruption to the School’s day to day operation.

  • 1. Phase 1 Building
  • 2. Phase 2 Extension
  • 3. Phase 1 Car Park
  • 4. Phase 2 Car Park
  • 5. Phase 1 Sports Pitch
  • 6. Phase 2 Sports Pitch

1 2 3 6 Let us know your thoughts about this important part of the site and the history of Craigmillar 4 5

Online: www.edinburgh.gov.uk/newcastlebraehighschool Email: newcastlebrae@edinburgh.gov.uk Comments can be made until Monday 4th March

Have your say... Have your say...

slide-3
SLIDE 3

Replacement Castlebrae High School

The Building

View from Niddrie Mains Road Start with a Superblock form React to topography View from Niddrie Mains Road, looking east View from Niddrie Mains Road, looking north west Respond to daylighting requirements for adjacent buildings Establish layers of accommodation Identify the key elements

  • f the building

Develop the “Learning Landscape”

Online: www.edinburgh.gov.uk/newcastlebraehighschool Email: newcastlebrae@edinburgh.gov.uk Comments can be made until Monday 4th March

Have your say... Have your say...

01 03 02 04 06 05

slide-4
SLIDE 4

Replacement Castlebrae High School

Internal Spaces

Lower Ground Floor Upper Ground Floor Second Floor Third Floor Online: www.edinburgh.gov.uk/newcastlebraehighschool Email: newcastlebrae@edinburgh.gov.uk Comments can be made until Monday 4th March

Have your say... Have your say...

Dining Space Assembly Learning Plaza