reliability requirements user group call
play

Reliability Requirements User Group Call 08/12/2013 Bob Kott - PowerPoint PPT Presentation

Reliability Requirements User Group Call 08/12/2013 Bob Kott Gautham Katta Perry Servedio Agenda 1. MSG Changes a. Background b. ISO Proposal c. Proposed Tariff Changes and Next Steps 2. Progress Report 3. Upcoming Events 4. Questions


  1. Reliability Requirements User Group Call 08/12/2013 Bob Kott Gautham Katta Perry Servedio

  2. Agenda 1. MSG Changes a. Background b. ISO Proposal c. Proposed Tariff Changes and Next Steps 2. Progress Report 3. Upcoming Events 4. Questions Page 2

  3. MSG Changes Page 3

  4. MSG Changes - Background • Units that are used for replacement capacity are considered as RA capacity only on days they are used • As a result the RA value may change on a daily basis • The ISO must make changes to the process of submitting proxy bids into the ISO markets when an RA resource has failed to submit its own bid or self-schedule • This has specific consequences for MSG units Page 4

  5. MSG Changes - Background • MSG units submit a default RA configuration, corresponding to the monthly RA value, and a preferred MSG configuration path to get the default MSG RA configuration • Since RA value can potentially change on a daily basis, the current single value for the default RA configuration may no longer be sufficient to determine a valid proxy bid • Additionally, if the default configuration may differ (for a different RA value) the configuration path to that default configuration may also differ Page 5

  6. MSG Changes – ISO Proposal • Instead of one default RA configuration, MSG resources will submit a table which shows the default configuration for all potential RA amounts using resource data template • Instead of the SC submitting a default path to the default configuration – There may now be several default configurations – The ISO will use the information provided by the MSG unit on its possible configurations in the Master File to determine the default configuration. The default configuration will be filled in with the default energy bid up to the RA capacity. Any lower configuration will also be filled with default energy bid up the RA capacity Page 6

  7. Proposed tariff changes and Timeline • Tariff changes the ISO proposes is to eliminate any scattered references to the term “Default Resource Adequacy Path” and amend section 30.7.3.5 and 27.8.2 to submit a table establishing default configuration and remove default path requirement – Draft ISO proposal http://www.caiso.com/Documents/DraftFinalProposal-Multi- StageGenerationTariffChange_ReplacementRequirements.pdf August 1 ISO posts Draft Final Proposal August 12 Reliability Requirements User Group conference call August 16 Stakeholder comments due End August ISO files tariff changes as part of RIMPR1 tariff filing Page 7

  8. Progress Report Page 8

  9. Progress Report SCP Many to Many Substitutions • Initial impact analysis complete • Preliminary technical analysis complete – Appears to be feasible for an automated solution – Too many complexities for a manual solution – Potential implementation issues might arise when BRS and SRS are formulated • Next step – Initiate and prioritize a project to complete this initiative Page 9

  10. Progress Report 2014 NQC – update – Draft NQC list for 2014 will be posted on reliability requirements website under net qualifying capacity (NQC) by COB 08/15/2013 Import Allocation – Step 12 complete • Remaining Import allocation posted on 08/08/2013 – Step 13 starts on 08/09/2013 at 9:00:00 AM PDT September Resource Adequacy – ISO sent out individual T-25 validation results on 8/1/2013 Page 10

  11. Upcoming Events Page 11

  12. Upcoming Events 1. October T-45: Mon, 8/19/2013 September T-11: Mon, 8/19/2013 2. 3. October T-25: Fri, 9/06/2013 4. Training for CAISO Interface for Resource Adequacy (CIRA) 1. Webinar on Thur,08/22/2013 2. IRR functionality moved to CIRA for Annual RA 1. New URL 2. Same look and feel 3. Some new interactions Page 12

  13. Upcoming Events 5. Market Simulation for CAISO Interface for Resource Adequacy (CIRA) – 08/26/2013 to 09/13/2013 1. The market simulation is for Annual 2014 RA 2. Market Sim is unstructured Page 13

  14. Questions? Page 14

Download Presentation
Download Policy: The content available on the website is offered to you 'AS IS' for your personal information and use only. It cannot be commercialized, licensed, or distributed on other websites without prior consent from the author. To download a presentation, simply click this link. If you encounter any difficulties during the download process, it's possible that the publisher has removed the file from their server.

Recommend


More recommend