Reliability Requirements User Group Call 08/12/2013 Bob Kott Gautham Katta Perry Servedio Agenda 1. MSG Changes a. Background b. ISO Proposal c. Proposed Tariff Changes and Next Steps 2. Progress Report 3. Upcoming Events 4. Questions


slide-1
SLIDE 1

Reliability Requirements User Group Call

08/12/2013 Bob Kott Gautham Katta Perry Servedio

slide-2
SLIDE 2

Agenda

  • 1. MSG Changes
  • a. Background
  • b. ISO Proposal
  • c. Proposed Tariff Changes and Next Steps
  • 2. Progress Report
  • 3. Upcoming Events
  • 4. Questions

Page 2

slide-3
SLIDE 3

MSG Changes

Page 3

slide-4
SLIDE 4

MSG Changes - Background

  • Units that are used for replacement capacity are considered

as RA capacity only on days they are used

  • As a result the RA value may change on a daily basis
  • The ISO must make changes to the process of submitting

proxy bids into the ISO markets when an RA resource has failed to submit its own bid or self-schedule

  • This has specific consequences for MSG units

Page 4

slide-5
SLIDE 5

MSG Changes - Background

  • MSG units submit a default RA configuration, corresponding to

the monthly RA value, and a preferred MSG configuration path to get the default MSG RA configuration

  • Since RA value can potentially change on a daily basis, the

current single value for the default RA configuration may no longer be sufficient to determine a valid proxy bid

  • Additionally, if the default configuration may differ (for a

different RA value) the configuration path to that default configuration may also differ

Page 5

slide-6
SLIDE 6

MSG Changes – ISO Proposal

  • Instead of one default RA configuration, MSG resources will

submit a table which shows the default configuration for all potential RA amounts using resource data template

  • Instead of the SC submitting a default path to the default

configuration – There may now be several default configurations – The ISO will use the information provided by the MSG unit

  • n its possible configurations in the Master File to

determine the default configuration. The default configuration will be filled in with the default energy bid up to the RA capacity. Any lower configuration will also be filled with default energy bid up the RA capacity

Page 6

slide-7
SLIDE 7

Proposed tariff changes and Timeline

  • Tariff changes the ISO proposes is to eliminate any scattered

references to the term “Default Resource Adequacy Path” and amend section 30.7.3.5 and 27.8.2 to submit a table establishing default configuration and remove default path requirement – Draft ISO proposal

http://www.caiso.com/Documents/DraftFinalProposal-Multi- StageGenerationTariffChange_ReplacementRequirements.pdf

Page 7

August 1 ISO posts Draft Final Proposal August 12 Reliability Requirements User Group conference call August 16 Stakeholder comments due End August ISO files tariff changes as part of RIMPR1 tariff filing

slide-8
SLIDE 8

Progress Report

Page 8

slide-9
SLIDE 9

Progress Report

SCP Many to Many Substitutions

  • Initial impact analysis complete
  • Preliminary technical analysis complete

– Appears to be feasible for an automated solution – Too many complexities for a manual solution – Potential implementation issues might arise when BRS and SRS are formulated

  • Next step

– Initiate and prioritize a project to complete this initiative

Page 9

slide-10
SLIDE 10

Progress Report

2014 NQC – update – Draft NQC list for 2014 will be posted on reliability requirements website under net qualifying capacity (NQC) by COB 08/15/2013

Import Allocation

– Step 12 complete

  • Remaining Import allocation posted on 08/08/2013

– Step 13 starts on 08/09/2013 at 9:00:00 AM PDT

September Resource Adequacy

– ISO sent out individual T-25 validation results on 8/1/2013

Page 10

slide-11
SLIDE 11

Upcoming Events

Page 11

slide-12
SLIDE 12

Upcoming Events

1. October T-45: Mon, 8/19/2013 2. September T-11: Mon, 8/19/2013 3. October T-25: Fri, 9/06/2013 4. Training for CAISO Interface for Resource Adequacy (CIRA) 1. Webinar on Thur,08/22/2013 2. IRR functionality moved to CIRA for Annual RA 1. New URL 2. Same look and feel 3. Some new interactions

Page 12

slide-13
SLIDE 13

Upcoming Events

5. Market Simulation for CAISO Interface for Resource Adequacy (CIRA) – 08/26/2013 to 09/13/2013 1. The market simulation is for Annual 2014 RA 2. Market Sim is unstructured

Page 13

slide-14
SLIDE 14

Questions?