puget sound gatew ay program
play

Puget Sound Gatew ay Program SR 167 and SR 509 Completion Projects - PowerPoint PPT Presentation

Puget Sound Gatew ay Program SR 167 and SR 509 Completion Projects Joint Executive Committee January 11, 2017 CRAIG J. STONE, PE GATEWAY PROGRAM ADMINISTRATOR Agenda Welcome and Introductions Todays Objectives Review


  1. Puget Sound Gatew ay Program SR 167 and SR 509 Completion Projects Joint Executive Committee January 11, 2017 CRAIG J. STONE, PE GATEWAY PROGRAM ADMINISTRATOR

  2. Agenda • Welcome and Introductions • Today’s Objectives • Review Project Scenarios and Traffic Analysis • Updated Funding and Phasing Review • Preliminary Preferred Scenario Recommendation • Discussion • Conclusion and Next Steps 1

  3. Meeting Objectives • Recommend preliminary preferred scenario to take into environmental review • Provide update on steering committee progress 2

  4. Legislative Direction In making budget allocations to the Puget Sound Gateway project, the department shall implement the project's construction as a single corridor investment. The department shall develop a coordinated corridor Construction and Implementation Plan for SR 167 and SR 509 in collaboration with affected stakeholders . Specific funding allocations must be based on where and when specific project segments are ready for construction to move forward and investments can be best optimized for timely project completion. Emphasis must be placed on avoiding gaps in fund expenditures for either project . 3

  5. Program Schedule to Endorse Construction and Implementation Plan 2016 2017 Dec Jan Feb Mar Apr May Jun July Aug Sept Oct Nov Dec Jan Feb Mar Apr May Jun Jul Aug Sep Practical Design Environmental Review 1 2 3 4 5 SR 509 Preliminary Updated SR 167 Review scenarios Endorse Kick-off Preferred Scenario modeling info Kick-off & bus tour Construction & Implementation Plan Public Engagement EJ SR 509 SR 167 Public Public Open House Open Houses outreach outreach outreach Executive Public Committee Outreach 4

  6. Puget Sound Gateway Process Legislature/Governor WSDOT Public Outreach SR 167 SR 509 SR 509 SR 167 Steering Steering Executive Executive Committee Committee Committee Committee 5

  7. Gateway Executive Committee Charter • Provide WSDOT with strategic advice on key decisions to implement the SR 167 and SR 509 projects within the Puget Sound Gateway Program framework • Review and provide feedback on prioritizing needs and refinements to SR 167 and SR 509 project design concepts • Review and provide feedback on program construction phasing • Review and provide feedback on program funding strategies • Collaboratively engage among the joint Executive Committee members to build consensus with affected stakeholders on a coordinated Gateway program funding, construction and implementation plan • Assist in building/maintaining local and regional consensus for the Gateway program 6

  8. Puget Sound Gateway Program Guiding Principles 1. Support regional mobility to provide efficient movement of freight and people 2. Improve local, regional, state and national economic vitality 3. Provide a high level of safety 4. Support local and regional comprehensive land use plans 5. Minimize environmental impacts and seek opportunities for meaningful improvements 6. Create solutions that are equitable, fiscally responsible , and allow for implementation over time 7. Support thoughtful community engagement and transparency 7

  9. Puget Sound Gateway Program Total funding is $1.87 billion; this amount assumes $310 million local match and tolling funding . Total $2b $1.87b Local contribution of $130 million Toll funding of $180 million $1.5b $1.0b $0.5b Connecting Washington funding of up to $1.57 billion $0.0b 8

  10. Practical Design • WSDOT Executive Order 1096: - WSDOT will design transportation infrastructure related solutions that are targeted to address the essential needs of a project, not every need. In doing so, designs are developed with criteria that achieve stated performance for the least cost… • ESHB 2012: - (1)(a) For projects identified as Connecting Washington projects…The legislature encourages the department to continue to institutionalize innovation and collaboration in design and project delivery with an eye toward the most efficient use of resources. In doing so, the legislature expects that, for some projects, costs will be reduced during the project design phase due to the application of practical design 9

  11. Scenario Refinement Process SR 509 Process SR 167 Process 1 1 2 2 2A 2A 3A 2C Preliminary 3 3 3A 2B Preferred 4A 4A Scope 4 4 4A 4A 5 5 10

  12. Finding the Balance for the Construction and Implementation Plan Schedule 11

  13. Cost Review $1,989b $1,750b $1,548b – $1,915b 12

  14. SR 167 Scenarios & Traffic Analysis 13

  15. Scenario 2C: Full Connectivity at I-5 with Split Diamond Interchange at Valley Avenue and Meridian Avenue 14

  16. SR 167: Scenario 2C $26m Highlighted features: $84m ½ SPUI at 54 th Ave • $91m interchange • Service level Diverging $1,065m Diamond interchange at I-5 $315m • ½ Diamond interchange at Valley Avenue $65m • ½ SPUI interchange at Meridian Avenue $26m $204m $74m Other Items Total $180m • Interurban Trail • RRP & Wetland Mitigation 15

  17. Scenario 4A: Moderate Connectivity at I-5 with Full Connectivity at Meridian Avenue 16

  18. SR 167: Scenario 4A Highlighted features: $37M $84M • ½ Diamond with SB cloverleaf $120M at 54 th Ave interchange $91M • System level interchange to\from the north at I-5 $1,512m $555M • NB I-5 auxiliary lane • No interchange at Valley $65M Avenue • Full SPUI at Meridian interchange • Widen NB Puyallup River $207M Bridge • N. Levee to Valley Connector $173M Other Items Total $180M • Interurban Trail • RRP & Wetland Mitigation 17

  19. Scenario 2C/4A Comparison Legend: Scenario 2C $84M Scenario 4A Shared Component $91M $65M $204M 18

  20. Refined Traffic Analysis Results • Presents only analysis for PM peak • Used Dynamic Traffic Assignment (DTA)/Mesoscopic tools I-5 Travel Times 2025 2045 19

  21. PM Peak Projected Travel Times for Selected South End Routes: 2025 % Travel Time Savings: % Travel Time Savings: 2C/3A 4A/4A 2C/3A 4A/4A • EB 33% 38% • EB 36% 36% • WB 39% 48% • WB 27% 27% 20

  22. PM Peak Projected Travel Times for Selected South End Routes: 2045 % Travel Time Savings: % Travel Time Savings: 2C/3A 4A/4A 2C/3A 4A/4A • EB 40% 44% • EB 32% 32% • WB 40% 48% • WB 38% 38% 21

  23. SR 167 Performance Evaluation Results 22

  24. SR 509 Scenarios & Traffic Analysis 23

  25. Scenario 3A 24

  26. SR 509: Scenario 3A 25

  27. Scenario 4A 26

  28. SR 509: Scenario 4A 27

  29. Scenario 3A/4A $12M Legend: $67M Scenario 3A Scenario 4A $11M Shared Component $25M $266M $316M $132M $22M $ 55M 28

  30. Refined Traffic Analysis Results • Presents only analysis for PM peak • Used Dynamic Traffic Assignment (DTA)/Mesoscopic tools 29

  31. PM Peak Projected Travel Times for Selected North End Routes: 2025 % Travel Time Savings: % Travel Time Savings: 2C/3A 4A/4A 2C/3A 4A/4A • • NB 17% 17% NB 23% 31% • SB 16% 16% • SB 26% 29% 30

  32. PM Peak Projected Travel Times for Selected North End Routes: 2025 % Travel Time Savings: % Travel Time Savings: 2C/3A 4A/4A 2C/3A 4A/4A • NB 20% 20% • NB 32% 37% • • SB 27% 27% SB 33% 36% 31

  33. SR 509 Performance Evaluation Results 32

  34. Updated Cost Estimates (CEVP) 33

  35. Program Cost Results: 2C/3A 100% 14% 90% 12% 80% (Cumulative Probability) (for Individual Ranges) 10% 70% 60%: $2.029 B 60% $2.029b Probability 60% Percentile 8% 50% $1.989b 50% 6% 40% 30% 4% 20% 2% 10% 0% 0% 1,400 1,650 1,900 2,150 2,400 2,650 Program Cost (Escalated $M) 34

  36. CEVP Cost Estimates $2.5b $2.607b Total Gateway $2b $1.989b Funding Total Connecting $1.875b $1.5b Washington Funding $1.57b $1.0b $0.5b $0.0b 2C/3A 4A/4A (SR 167/SR 509) 35

  37. Puget Sound Gateway Funding Connecting WA as enacted by 2015 Legislature Local Funding 2021-2023 Toll Funding 2023-2025 2025-2027 2027-2029 2019-2021 $60m $70m 2029-2031 $180m 2017-2019 2015-2017 $302m $300m $20m $335m $313m $58m $235m $2.5m $313m $300m $200m TOTAL $58m $305m $302m $2.5m $395m 36

  38. Program Cost Comparison: Constrained vs. Unconstrained $1.866 Complete 2026 $1.989 Complete 2030 37

  39. FASTLANE Grant Update 38

  40. Cost Review $1,989b $1,750b $1,548b – $1,915b 39

  41. FASTLANE Grant Application • New Federal grant program focused on freight projects • $4.5B program through 2020 • $800M awarded in FFY 2016 to 18 Recipients (212 applications received totaling almost $10B) • $850M Notice of Funding Opportunity for FFY 2017 announced on Oct 28 th , with applications due Dec 15 th • Submitted application on December 15, 2016 for $114.4 million 40

Download Presentation
Download Policy: The content available on the website is offered to you 'AS IS' for your personal information and use only. It cannot be commercialized, licensed, or distributed on other websites without prior consent from the author. To download a presentation, simply click this link. If you encounter any difficulties during the download process, it's possible that the publisher has removed the file from their server.

Recommend


More recommend