Public Meeting Public Meeting 2005 Storm Sewer Bond Issue Project 2005 Storm Sewer Bond Issue Project th & Fair to 28 th & Fair St. 24 th & Fair to 28 th & Fair St. 24 Introductions City of Lincoln : Kent Evans- Project


slide-1
SLIDE 1

Public Meeting Public Meeting

2005 Storm Sewer Bond Issue Project 2005 Storm Sewer Bond Issue Project 24 24th

th & Fair to 28

& Fair to 28th

th & Fair St.

& Fair St.

slide-2
SLIDE 2

Introductions

  • City of Lincoln:
  • Kent Evans- Project Manager
  • John Callen- Associate Engineer
  • Olsson Associates
  • Eric Dove- Lead Engineer
  • Travis Figard- Associate Engineer
  • Lisa Behrns- Public Involvement Coordinator
slide-3
SLIDE 3

Agenda

  • Storm Drainage System
  • Identify Flood Prone Areas
  • Project Schedule
  • Questions
slide-4
SLIDE 4

Storm Drainage System

slide-5
SLIDE 5

Design Capacity

  • Gutter Flow & Pipe Flow
  • 5 year storm: 1.9” in 1 hour
  • Street Right of Way Flow
  • 100 year storm: 3.4” in 1 hour
slide-6
SLIDE 6
slide-7
SLIDE 7
slide-8
SLIDE 8

Low Points (Sumps)

  • Where will the 100 year storm go?
  • How deep will it get ?
  • Typically need higher pipe capacity.
slide-9
SLIDE 9

Pipe System & Sump Areas of Interest

slide-10
SLIDE 10

Flood Prone Structures

slide-11
SLIDE 11

Drainage Area to the Alley

slide-12
SLIDE 12

Proposed Improvements

slide-13
SLIDE 13

Schedule

  • Field Survey: Started
  • 60% Design: May 2006
  • 90% Design: June 2006
  • Public Meeting: June 2006
  • Start of Construction: August 2006
  • End of Construction: Spring 2007
slide-14