Public Meeting Wednesday, December 12, 2018 6:00 PM Jefferson Middle School 10900 Shaenfield Road Welcome and Introductions Remarks Presentation Open House (Q & A) Bridgewood Subdivision is located within Bexar County
SLIDE 1
SLIDE 2
Welcome and Introductions Remarks Presentation Open House (Q & A)
SLIDE 3
Bridgewood Subdivision is located within Bexar County The existing infrastructure consists of flexible asphalt pavement roadways with
standard curbs, 3-foot wide sidewalks and non-compliant ADA accessible curb ramps.
Field investigations show that the roadways are in poor to moderately-poor
conditions with visible signs of distress and base failures along each street.
SLIDE 4
Project proposes road and drainage improvements for approximately 15 streets
(1.8 miles)
Project will reconstruct the current 2-lane roadway to include 30-foot street width, curb and gutter, and 4-foot sidewalks
All existing utilities will remain underground
Existing waterline will remain with minor adjustments Existing sanitary sewer will remain with minor adjustments
Driveways penetrations may be required
SLIDE 5
SLIDE 6
SLIDE 7
SLIDE 8
Project to advertise in January 2019. Construction to begin in 2rd Quarter of 2019. Estimated Construction Cost: $4.3 Million