PUBLIC INFORMATION MEETING #2 Today’s presentation given by: Jeff Berens, P.E. WisDOT Southwest Region g Gerry Schmitt, P.E. KL Engineering, Inc.
PUBLIC INFORMATION MEETING #2 Todays presentation given by: Jeff - - PowerPoint PPT Presentation
PUBLIC INFORMATION MEETING #2 Todays presentation given by: Jeff - - PowerPoint PPT Presentation
PUBLIC INFORMATION MEETING #2 Todays presentation given by: Jeff Berens, P.E. WisDOT Southwest Region g Gerry Schmitt, P.E. KL Engineering, Inc. Meeting Objectives Meeting Objectives Status of Alternatives Investigated
Meeting Objectives Meeting Objectives
- Status of Alternatives Investigated
- Propose WisDOT Recommended Alternative
- Update Study Schedule
- Gather comments on the study
Gather comments on the study
US 51, Madison – DeForest, Terminal Drive – WIS 19 Dane County Project ID 5410-05-00 STUDY LIMITS
Project Purpose and Need
- Improve safety
Project Purpose and Need
- Reduce congestion
- Improve bicycle, pedestrian, and
transit facilities
- Reduce diversion to
neighborhood streets
- Support economic development
- Support economic development
Traffic Safety and Operations
- Crashes from 2007 to 2011
- 1 859 crashes (over 7 per week)
Traffic Safety and Operations
- 1,859 crashes (over 7 per week)
- 606 crashes with injuries (over 2 per week)
- 10 fatalities
- Current Traffic Operations Conditions
- Peak hour delays increasing
- Long backups at signalized intersections
- Operations by 2040
- Failing throughout corridor
Improvement Alternatives Improvement Alternatives
- No Build
M i t f i ti d ith t i
- Maintenance of existing roadway without expansion or
reconfiguration
- Alt A – Transportation System Management (TSM)
- Keeps most existing intersections at grade
- Alt B – Enhanced Expressway
- Adds interchanges at intersections with high crash rates and
g g major traffic delay
- Alt C – Freeway Conversion
- Provides a free flow movement for traffic through the corridor
Provides a free flow movement for traffic through the corridor
*Preferred alternative could be a Combination of alternatives
Innovative Designs Innovative Designs
- Diverging Diamond Interchange (DDI)
B l li & WIS 30
- Beltline & WIS 30
- Si
l P i t I t h (SPI)
- Single Point Interchange (SPI)
- E. Washington Ave
- Echelon
- Broadway & E. Washington Ave
Proposed Recommended Alt Proposed Recommended Alt
- Combination of Alternatives A, B, & C
- Best addresses safety and congestion issues taking into
accounts environmental impacts and projected cost
- May change based on input from the public municipalities and
- May change based on input from the public, municipalities, and
resource agencies
- Highlighted at project stations
g g p j
Bicycle / Pedestrian Facilities Bicycle / Pedestrian Facilities
- On-road as appropriate for Alternatives A & B
N d f iliti f
- No on-road facilities on freeways
- Upgrade crossings and parallel roadways
- Overpasses
- Tompkins Drive
- Helgeson Drive
- Walsh Road / Parkwood Drive (Over WIS 30)
- Larson Court
- Larson Court
- East Washington Avenue
- Anderson Road (Over I 39/90/94)
Off R d P th
- Off Road Paths
- Broadway – Pflaum Road
- Pierstorff Street – County CV
Noise Impacts / Corridor Aesthetics Noise Impacts / Corridor Aesthetics
- Noise Impacts
U d i i l i
- Updating noise analysis
- Determine areas of potential mitigation
- Aesthetics
- Corridor themes
- Bridges, Walls, Landscape Opportunities
Effects on Business Effects on Business
- Issues
- Impacts to businesses in all alternatives
- Impacts to businesses in all alternatives
- Relocations
- Access changes
- Opportunities
- Improved access to and from businesses
- Safer and more efficient access
- Improved corridor aesthetics
- Developmental change and growth
Estimated Project Costs Estimated Project Costs
- Year 2013 $ construction and real estate costs estimated
- Alternative A
$215 $250 Million
- Alternative A
$215 - $250 Million
- Alternative B
$595 - $685 Million
- Alternative C
$790 - $875 Million
- Recommended Alt could be a combination of A, B, and C
- Planning Level Estimates – More detailed costs for Draft EIS
i S 2013 in Summer 2013
Study Schedule y
2014 2013
Refine Alternatives Public Involvement / Agency Coordination Mtgs
- Inc. Recommended Alt.
Funding and Project Scheduling Funding and Project Scheduling
- Currently no funding allocated for final design or construction
- Funding would be from Majors Program
- Statewide program
- WisDOT prioritizes and submits to the Transportation Projects
Commission (TPC)
- TPC recommends to Legislature and Governor
- If funding is approved, WisDOT can:
- Begin final design
- Prioritize sections for most effective order of construction
- Schedule project as appropriate
Interim Improvement Projects Interim Improvement Projects
Beltline Ramps (2008) Cottage Grove Rd to Buckeye – Auxiliary Lane SB (2008) Hoepker Road Intersection (2009) p ( ) Dutch Mill Park n Ride Expansion (2012) I 39/90/94 WB Ramp Signals (2012) US 51 SB Bridge Replacement at Cottage Grove Road (2015) Buckeye Road and Pflaum Road Signal Improvements (2015) Signal Improvements (2015)
Opportunities to Provide Input Opportunities to Provide Input
- Comment Form
- Fill Out Here and Put in Comment Box
- Fill Out Here and Put in Comment Box
- Take Home and Mail
- Send Comments Via Email -
j ff b @d t i jeff.berens@dot.wi.gov
- Future Public Meeting and Public Hearing
- Request a presentation or meeting
Request a presentation or meeting
- Website –
http://www1.wisconsindot.gov/Pages/projects/by-region/sw/51/default.aspx