PUBLIC INFORMATION MEETING #2 Todays presentation given by: Jeff - - PowerPoint PPT Presentation

PUBLIC INFORMATION MEETING #2 Todays presentation given by: Jeff Berens, P.E. WisDOT Southwest Region g Gerry Schmitt, P.E. KL Engineering, Inc. Meeting Objectives Meeting Objectives Status of Alternatives Investigated


slide-1
SLIDE 1

PUBLIC INFORMATION MEETING #2 Today’s presentation given by: Jeff Berens, P.E. WisDOT Southwest Region g Gerry Schmitt, P.E. KL Engineering, Inc.

slide-2
SLIDE 2

Meeting Objectives Meeting Objectives

  • Status of Alternatives Investigated
  • Propose WisDOT Recommended Alternative
  • Update Study Schedule
  • Gather comments on the study

Gather comments on the study

slide-3
SLIDE 3

US 51, Madison – DeForest, Terminal Drive – WIS 19 Dane County Project ID 5410-05-00 STUDY LIMITS

slide-4
SLIDE 4

Project Purpose and Need

  • Improve safety

Project Purpose and Need

  • Reduce congestion
  • Improve bicycle, pedestrian, and

transit facilities

  • Reduce diversion to

neighborhood streets

  • Support economic development
  • Support economic development
slide-5
SLIDE 5

Traffic Safety and Operations

  • Crashes from 2007 to 2011
  • 1 859 crashes (over 7 per week)

Traffic Safety and Operations

  • 1,859 crashes (over 7 per week)
  • 606 crashes with injuries (over 2 per week)
  • 10 fatalities
  • Current Traffic Operations Conditions
  • Peak hour delays increasing
  • Long backups at signalized intersections
  • Operations by 2040
  • Failing throughout corridor
slide-6
SLIDE 6

Improvement Alternatives Improvement Alternatives

  • No Build

M i t f i ti d ith t i

  • Maintenance of existing roadway without expansion or

reconfiguration

  • Alt A – Transportation System Management (TSM)
  • Keeps most existing intersections at grade
  • Alt B – Enhanced Expressway
  • Adds interchanges at intersections with high crash rates and

g g major traffic delay

  • Alt C – Freeway Conversion
  • Provides a free flow movement for traffic through the corridor

Provides a free flow movement for traffic through the corridor

*Preferred alternative could be a Combination of alternatives

slide-7
SLIDE 7

Innovative Designs Innovative Designs

  • Diverging Diamond Interchange (DDI)

B l li & WIS 30

  • Beltline & WIS 30
  • Si

l P i t I t h (SPI)

  • Single Point Interchange (SPI)
  • E. Washington Ave
  • Echelon
  • Broadway & E. Washington Ave
slide-8
SLIDE 8

Proposed Recommended Alt Proposed Recommended Alt

  • Combination of Alternatives A, B, & C
  • Best addresses safety and congestion issues taking into

accounts environmental impacts and projected cost

  • May change based on input from the public municipalities and
  • May change based on input from the public, municipalities, and

resource agencies

  • Highlighted at project stations

g g p j

slide-9
SLIDE 9

Bicycle / Pedestrian Facilities Bicycle / Pedestrian Facilities

  • On-road as appropriate for Alternatives A & B

N d f iliti f

  • No on-road facilities on freeways
  • Upgrade crossings and parallel roadways
  • Overpasses
  • Tompkins Drive
  • Helgeson Drive
  • Walsh Road / Parkwood Drive (Over WIS 30)
  • Larson Court
  • Larson Court
  • East Washington Avenue
  • Anderson Road (Over I 39/90/94)

Off R d P th

  • Off Road Paths
  • Broadway – Pflaum Road
  • Pierstorff Street – County CV
slide-10
SLIDE 10

Noise Impacts / Corridor Aesthetics Noise Impacts / Corridor Aesthetics

  • Noise Impacts

U d i i l i

  • Updating noise analysis
  • Determine areas of potential mitigation
  • Aesthetics
  • Corridor themes
  • Bridges, Walls, Landscape Opportunities
slide-11
SLIDE 11

Effects on Business Effects on Business

  • Issues
  • Impacts to businesses in all alternatives
  • Impacts to businesses in all alternatives
  • Relocations
  • Access changes
  • Opportunities
  • Improved access to and from businesses
  • Safer and more efficient access
  • Improved corridor aesthetics
  • Developmental change and growth
slide-12
SLIDE 12

Estimated Project Costs Estimated Project Costs

  • Year 2013 $ construction and real estate costs estimated
  • Alternative A

$215 $250 Million

  • Alternative A

$215 - $250 Million

  • Alternative B

$595 - $685 Million

  • Alternative C

$790 - $875 Million

  • Recommended Alt could be a combination of A, B, and C
  • Planning Level Estimates – More detailed costs for Draft EIS

i S 2013 in Summer 2013

slide-13
SLIDE 13

Study Schedule y

2014 2013

Refine Alternatives Public Involvement / Agency Coordination Mtgs

  • Inc. Recommended Alt.
slide-14
SLIDE 14

Funding and Project Scheduling Funding and Project Scheduling

  • Currently no funding allocated for final design or construction
  • Funding would be from Majors Program
  • Statewide program
  • WisDOT prioritizes and submits to the Transportation Projects

Commission (TPC)

  • TPC recommends to Legislature and Governor
  • If funding is approved, WisDOT can:
  • Begin final design
  • Prioritize sections for most effective order of construction
  • Schedule project as appropriate
slide-15
SLIDE 15

Interim Improvement Projects Interim Improvement Projects

Beltline Ramps (2008) Cottage Grove Rd to Buckeye – Auxiliary Lane SB (2008) Hoepker Road Intersection (2009) p ( ) Dutch Mill Park n Ride Expansion (2012) I 39/90/94 WB Ramp Signals (2012) US 51 SB Bridge Replacement at Cottage Grove Road (2015) Buckeye Road and Pflaum Road Signal Improvements (2015) Signal Improvements (2015)

slide-16
SLIDE 16

Opportunities to Provide Input Opportunities to Provide Input

  • Comment Form
  • Fill Out Here and Put in Comment Box
  • Fill Out Here and Put in Comment Box
  • Take Home and Mail
  • Send Comments Via Email -

j ff b @d t i jeff.berens@dot.wi.gov

  • Future Public Meeting and Public Hearing
  • Request a presentation or meeting

Request a presentation or meeting

  • Website –

http://www1.wisconsindot.gov/Pages/projects/by-region/sw/51/default.aspx

slide-17
SLIDE 17

Th k Y ! Th k Y ! Thank You! Thank You!