PUBLIC IN FO RM A TIO N M EETIN G
C A SC A D E RO A D / A V EN UE C O RRID O R IM PRO V EM EN TS PHA SE I PLA N S
M a rc h 2 0 , 2 0 1 8
PUBLIC IN FO RM A TIO N M EETIN G C A SC A D E RO A D / A V EN UE - - PowerPoint PPT Presentation
PUBLIC IN FO RM A TIO N M EETIN G C A SC A D E RO A D / A V EN UE C O RRID O R IM PRO V EM EN TS PHA SE I PLA N S M a rc h 2 0 , 2 0 1 8 Me e ting Age nda Cascade Corridor Improvements: Phase I March 20, 2018 6:00 6:15 p.m.
PUBLIC IN FO RM A TIO N M EETIN G
C A SC A D E RO A D / A V EN UE C O RRID O R IM PRO V EM EN TS PHA SE I PLA N S
M a rc h 2 0 , 2 0 1 8
Me e ting Age nda Cascade Corridor Improvements: Phase I March 20, 2018
6:00 – 6:15 p.m. Arrival of Attendees 6:15 – 6:30 p.m. Welcome and Introductions 6:30 – 7:00 p.m. Project Overview Presentation 7:00 – 7:30 p.m. Questions and Answers 7:30 – 8:00 p.m. Open House / Public Input Activities
Re ne w Atlanta and T SPL OST
Renew Atlanta:
approved by voters on March 17, 2015
TSPLOST (special purpose local option sales tax
for transportation):
November 8, 2016, authorizing investment in transit and transportation infrastructure
CT OVE RVIE W
Casc ade Road Cor r idor Impr
Project Limits: City Limits (near Kingsdale Drive) to
Willis Mill Road and Delowe Drive to Avon Avenue
Resurfacing (City Limits to Ralph David Abernathy)
Dr ainage and E r
► Install concrete header curb and
catch basins to collect and route stormwater away from roadway
Pe de str ian Safe ty E nhanc e me nts
► Signalized
pedestrian crossings (flashing beacons) and refuge islands
RESIDENCE RESIDENCE RESIDENCE RESIDENCE RESIDENCE
T r affic Signal & Communic ation Upgr ade s
► Improved signal
timing, detection, and coordination
► Upgraded
equipment (pedestrian crossing push buttons, signals, cabinets, wiring)
Shar e d Use r Ame nitie s
► Consistent lane widths (10’ travel lane) ► Renew Atlanta is looking into potentially adding
center lane medians at appropriate locations
Shar e d Use r Ame nitie s
► Dedicated and shared bike lanes ► Sidewalks separated from travel lanes
by 2-ft buffer
Impr
A Bus Ac c e ss
► Improved facilities
for accessing MARTA buses including sidewalks and bus shelters (where warranted)
Pr
ash Data
I- 75
Safe ty Re c omme ndations
I- 75
► Kingsdale Drive SW ► Pedestrian crosswalks and signage
improvements
RESIDENCE RESIDENCE
Side Road Warning Ped Crossing Warning
ST RE E T NAME
Safe ty Re c omme ndations
I- 75
► Adams Drive SW ► Pedestrian crosswalks and signage
improvements
RESIDENCE RESIDENCE
I ntersection Warning
RESIDENCE ST RE E T NAME
CT DE SIGN
The Corridor will have the same look and feel from the Atlanta City limit to Ralph D. Abernathy Blvd.
I- 75
► Next Steps
Finalize Plans Complete Permitting Process
(Trees, Erosion Control)
Right of Way Utility Coordination Solicitation & Contractor Selection Construction
’S NE XT ?
F e e dbac k
F e e dbac k
We bsite : www.RenewAtlantaBond.com
T witte r : @RenewATL2015, #RenewATL E mail: RenewAtlanta@AtlantaGa.Gov
Pr
ST IONS & COMME NT S
Question and Answer session (please
limit comments to 2 minutes)
Visit informational boards & discuss
with City of Atlanta representatives
Complete a comment card and
leave with a Renew Atlanta representative
PUBLIC IN FO RM A TIO N M EETIN G
C A SC A D E RO A D / A V EN UE C O RRID O R IM PRO V EM EN TS PHA SE I PLA N S
M a rc h 2 0 , 2 0 1 8