PUBLIC IN FO RM A TIO N M EETIN G C A SC A D E RO A D / A V EN UE C O RRID O R IM PRO V EM EN TS PHA SE I PLA N S M a rc h 2 0 , 2 0 1 8 Me e ting Age nda Cascade Corridor Improvements: Phase I March 20, 2018 6:00 6:15 p.m.


slide-1
SLIDE 1

PUBLIC IN FO RM A TIO N M EETIN G

C A SC A D E RO A D / A V EN UE C O RRID O R IM PRO V EM EN TS PHA SE I PLA N S

M a rc h 2 0 , 2 0 1 8

slide-2
SLIDE 2

Me e ting Age nda Cascade Corridor Improvements: Phase I March 20, 2018

 6:00 – 6:15 p.m. Arrival of Attendees  6:15 – 6:30 p.m. Welcome and Introductions  6:30 – 7:00 p.m. Project Overview Presentation  7:00 – 7:30 p.m. Questions and Answers  7:30 – 8:00 p.m. Open House / Public Input Activities

slide-3
SLIDE 3

Re ne w Atlanta and T SPL OST

 Renew Atlanta:

  • $250 million infrastructure bond program

approved by voters on March 17, 2015

  • Over 80% of voters approved

 TSPLOST (special purpose local option sales tax

for transportation):

  • Atlanta voters approved the referendum on

November 8, 2016, authorizing investment in transit and transportation infrastructure

  • Referendum passed by 68%
slide-4
SLIDE 4

1 PROJE

CT OVE RVIE W

slide-5
SLIDE 5

Casc ade Road Cor r idor Impr

  • ve me nts (Phase 1)

 Project Limits: City Limits (near Kingsdale Drive) to

Willis Mill Road and Delowe Drive to Avon Avenue

  • Drainage and Erosion Improvements
  • Pedestrian Safety Enhancements
  • Traffic Signal and Communication Upgrades
  • Shared User Amenities (Sidewalks, Bike Lanes)
  • Improved Accessibility to MARTA Bus Stops

 Resurfacing (City Limits to Ralph David Abernathy)

slide-6
SLIDE 6

Dr ainage and E r

  • sion Impr
  • ve me nts

► Install concrete header curb and

catch basins to collect and route stormwater away from roadway

slide-7
SLIDE 7

Pe de str ian Safe ty E nhanc e me nts

► Signalized

pedestrian crossings (flashing beacons) and refuge islands

RESIDENCE RESIDENCE RESIDENCE RESIDENCE RESIDENCE

slide-8
SLIDE 8

T r affic Signal & Communic ation Upgr ade s

► Improved signal

timing, detection, and coordination

► Upgraded

equipment (pedestrian crossing push buttons, signals, cabinets, wiring)

slide-9
SLIDE 9

Shar e d Use r Ame nitie s

► Consistent lane widths (10’ travel lane) ► Renew Atlanta is looking into potentially adding

center lane medians at appropriate locations

slide-10
SLIDE 10

Shar e d Use r Ame nitie s

► Dedicated and shared bike lanes ► Sidewalks separated from travel lanes

by 2-ft buffer

slide-11
SLIDE 11

Impr

  • ve d MART

A Bus Ac c e ss

► Improved facilities

for accessing MARTA buses including sidewalks and bus shelters (where warranted)

slide-12
SLIDE 12

Pr

  • je c t Cr

ash Data

I- 75

slide-13
SLIDE 13

Safe ty Re c omme ndations

I- 75

► Kingsdale Drive SW ► Pedestrian crosswalks and signage

improvements

RESIDENCE RESIDENCE

Side Road Warning Ped Crossing Warning

ST RE E T NAME

slide-14
SLIDE 14

Safe ty Re c omme ndations

I- 75

► Adams Drive SW ► Pedestrian crosswalks and signage

improvements

RESIDENCE RESIDENCE

I ntersection Warning

RESIDENCE ST RE E T NAME

slide-15
SLIDE 15

2 PROJE

CT DE SIGN

The Corridor will have the same look and feel from the Atlanta City limit to Ralph D. Abernathy Blvd.

slide-16
SLIDE 16

I- 75

► Next Steps

Finalize Plans Complete Permitting Process

(Trees, Erosion Control)

Right of Way Utility Coordination Solicitation & Contractor Selection Construction

3 WHAT

’S NE XT ?

slide-17
SLIDE 17

F e e dbac k

slide-18
SLIDE 18

F e e dbac k

We bsite : www.RenewAtlantaBond.com

T witte r : @RenewATL2015, #RenewATL E mail: RenewAtlanta@AtlantaGa.Gov

slide-19
SLIDE 19

Pr

  • je c t Update s
slide-20
SLIDE 20

4 QUE

ST IONS & COMME NT S

 Question and Answer session (please

limit comments to 2 minutes)

 Visit informational boards & discuss

with City of Atlanta representatives

 Complete a comment card and

leave with a Renew Atlanta representative

slide-21
SLIDE 21

PUBLIC IN FO RM A TIO N M EETIN G

C A SC A D E RO A D / A V EN UE C O RRID O R IM PRO V EM EN TS PHA SE I PLA N S

M a rc h 2 0 , 2 0 1 8