PROJECT BASIS: Construction of a paper mill for the production of paper for corrugating from recycled raw materials with a capacity of 150 tons per day. COMPANY NAME: Naberezhnochelninskaya KBF LLC,registered on 01.04.2018. PROJECT
SLIDE 2
SLIDE 3
Main production product – paper for corrugating
Used for: Corrugated board production Manufacture of tarpaulins for various purposes Advantages of paper for corrugating:
Resistance to moisture Stiffness and shape retention Damping properties
SLIDE 4
Competition:
Name Competition level Goals in the struggle for market share Goals in the struggle for competitive position Strong points Weak points Cardboard and Paper Mill LLC, Tuymazy city federal win and retain its market segment strengthen and expand the existing position Low price quality CJSC “People's Enterprise Naberezhnye Chelny Cardboard and Paper Mill named after S.P. Titov” federal Leadership on the market strengthen and expand the existing position excellent reputation, well- developed image High price, delivery difficulties
Demand:
Main consumer - "Cardboard Factory" LLC There are also written agreements with a number of other users of corrugating paper and cardboard for flat layers, covering the entire production capacity.
SLIDE 5
Milling Accumulation Dilution Cleaning Composing Semi-finished products
- 1. Preparation of pulp
Bringing to grate Molding Pressing Drying Cooling Mechanical processing
- 2. Paper manufacturing
Cutting on rolls Winding Packing
SLIDE 6
The raw material used is waste paper
No Name City Address 1 Profsoyuznoe LLC Naberezhnye Chelny Metallurgicheskaya str., 83/31 2 Promindustriya LLC Naberezhnye Chelny Moskovskyi Avenue, 140 3 Magnat LLC Naberezhnye Chelny Industrial transportation, 45 4 Brand LLC Naberezhnye Chelny Magistralnaya str., 67а 5 Volga Region Environmental Company Naberezhnye Chelny Chulman Avenue, 40/11б 6 Urosov AV IE Naberezhnye Chelny Starosaromanovskay a, 29 7 Zaripov IA IE Naberezhnye Chelny Kazanskiy Avenue, 226 block 5
Waste paper suppliers
With some of suppliers written agreements are concluded!
SLIDE 7
Equipment for the preparation of pulp "LEIZHAN" Co LTD: This equipment is necessary for the first stage
- f the technological process, namely, to prepare
pulp from semi-finished products Line for the production of kraft paper "Fourdrinier": Raw material: waste paper, pure cellulose; Finished product: paper for corrugated packaging; Density : 100-200 g / m2; Constructional winding speed: 250 m / min; Operating speed: 140 - 220 m / min; Capacity: 150 t / day.
Total is planned to produce 43,020 tons of corrugated paper per year
SLIDE 8
Sales volume:
Name of product Price per unit, rub. Unit of measureme nt
Average monthly sales volume
First year Second year Third and subseque nt Paper for corrugating 29 972 tons 1 494 4 780
Revenues from sales:
Name of product Price per unit, rub. Average monthly revenue from sales of products, thousand rubles First year Second year Third and subseque nt Paper for corrugating 29 972 44 770 143 266
SLIDE 9
Company website and online store
- Sale of products to both corporate and private customers
- Ordering
Contextual advertising, advertising on thematic sites
- Using contextual advertising in the leading search engines (Yandex, Google)
- Placement of advertising on websites devoted to the production of corrugated cardboard
- Placement of advertising on the sites of stores offering products for factories and factories
Partner companies
- Establish partnerships with companies that sell raw materials for plants and factories that produce
corrugated cardboard.
Instruments:
SLIDE 10
SLIDE 11
Position Q-ty (1-4 quarter of project) person Q-ty (5-6 quarter of project) person Q-ty (after start of production) person Salary of one person per month (rub) General Director 1 1 1 150 000 Technical Director 1 1 1 150 000 Commercial Director 1 1 150 000 Chief Engineer 1 1 1 100 000 Chief Technician 1 1 1 100 000 Chief Power Engineer 1 1 1 100 000 Chief Mechanical Engineer 1 1 1 50 000 Chief I&C Engineer 1 1 1 60 000 Senior Engineer 1 80 000 Shift Senior 4 50 000 Accountant 3 50 000 Security Manager 1 1 1 60 000 Production Manager 1 1 100 000 Manager 3 40 000 Mechanical driver 4 60 000 Dryer 4 45 000 Roller engineer 4 40 000 Raw materials cutter 8 40 000 Miller 8 35 000 Sorter 8 25 000 Loader driver 16 30 000 Laboratory worker 5 30 000 Locksmith on duty 4 30 000 Electrician on duty 4 30 000 I&C Engineer 4 45 000 Total 8 10 90 4 050 000
SLIDE 12
Object location Republic of Tatarstan, industrial and municipal zone of the city
- f Naberezhnye Chelny,
Technicheskaya str. Availability of necessary space 1 plot (444): 5 900 sq. m. 2 plot (924): 9,400 sq. m. Total area: 15 300 sq. m. Capacaties, engineering utilities The entire infrastructure is put in place, the sites received
- those. conditions for the
necessary steam from the CHPP Transport infrastructure Available
The land plot is located near the city center The site is dry, with air and water permeable soil The site is located on the federal highway M7 The site is located on the leeward side and below the level of the nearest settlements
Advantages
SLIDE 13
Required investments: 311 million rubles
No. Name Total price, thousand rubles 1. Construction of production building 42 350 2. Construction of warehouse buildings and boiler house 11 664 3. Construction of the pulp preparation workshop 21 600 4. Auxiliary buildings 10 440 5. Equipment foundations casting 16 960 6. Purchase of a line for the production of paper for corrugating 138 318 7. Pulp preparation equipment 29 248 8. Equipment delivery from China 18 600 9. Installation of electrical lines and pipelines with regards to areas 15 000 10. Equipment commissioning 6 820 TOTAL: 311 000
SLIDE 14
Annual forecast profit and loss account
SLIDE 15
Annual forecast profit and loss account (continued)
SLIDE 16
Annual cash flow forecast statement
SLIDE 17
Annual cash flow forecast statement (continued)
SLIDE 18
Annual cash flow forecast statement (continued)
SLIDE 19
Economical effectiveness evaluation
Index Value Payback period 2 years 5 months Discounted payback period 2 years 6 months Net Present Value of the Project (NPV), rub. 1 024 211 299 Internal rate of return (IRR) 93,6%