project i the bmw group s response to the future
play

project i THE BMW GROUPS RESPONSE TO THE FUTURE CHALLENGES OF - PowerPoint PPT Presentation

project i THE BMW GROUPS RESPONSE TO THE FUTURE CHALLENGES OF SUSTAINABLE AND PERSONAL MOBILITY MANUEL SATTIG, project i project i , June 14 th 2011 WE PIONEER SUSTAINABLE MOBILITY MINI E AND BMW ActiveE SERVE AS KEY LEARNING PROJECTS OF


  1. project i – THE BMW GROUP’S RESPONSE TO THE FUTURE CHALLENGES OF SUSTAINABLE AND PERSONAL MOBILITY MANUEL SATTIG, project i project i , June 14 th 2011

  2. WE PIONEER SUSTAINABLE MOBILITY

  3. MINI E AND BMW ActiveE SERVE AS KEY LEARNING PROJECTS OF OUR MEGACITY VEHICLE Use of renewable Market Transfer User behaviour. Acceptance. Demands of Strengths and energy. potential. scenarios. e-infrastructure. weaknesses. MINI E 2010 BMW ActiveE 2011 Megacity Vehicle 2013

  4. BMW i PERFECTLY BALANCES THE BMW BRAND PORTFOLIO Innovate Driving Pleasure. Focus on Aesthetics. Performance –Thrilling. Visionary Mobility. Boost Joy. Technology –Striking. Inspiring Design. Experience –Unrivaled. Next Premium.

  5. THE BMW i3 Vehicle Purpose Design LifeDrive lightweight concept 4-seater Usable trunk space Drivetrain Rear motor Rear wheel drive Battery Lithium-Ion Battery Active cooling

  6. THE BMW i8 Vehicle Purpose Design sportscar LifeDrive lightweight concept 2+2 seats Drivetrain small combustion engine plug-in hybrid plus electric motor Battery Lithium-Ion Battery Active Cooling

  7. LIFEDRIVE ARCHITECTURE LifeDrive architecture allows ideal integration of the electric drivetrain and breaks the weight spiral for electric vehicles.

  8. project i IS THE BMW GROUP’S LEADING DIVISION AIMING FOR HIGHLY SUSTAINABLE PRODUCTION TARGETS -70% water usage -50% energy requirements 100% of the energy comes from renewable sources

  9. PLANT NETWORK JV Moses Lake, Washington State Carbon fiber JV Leipzig CFRP fabrication Wackersdorf MCV assembly CFRP alignment + recycling The BMW Group and the joint venture set up with the SGL Group are investing a total of €530 million in the project. E B atte ry M otor Dingolfing Landshut A total of over 1,000 jobs will be created CFRP fabrication Drive production as a result of the investment.

  10. THE CUSTOMER DEMANDS ON ELECTROMOBILITY REQUIRE MORE SOLUTIONS THAN JUST A CAR

  11. THANK YOU VERY MUCH

Download Presentation
Download Policy: The content available on the website is offered to you 'AS IS' for your personal information and use only. It cannot be commercialized, licensed, or distributed on other websites without prior consent from the author. To download a presentation, simply click this link. If you encounter any difficulties during the download process, it's possible that the publisher has removed the file from their server.

Recommend


More recommend