potrero gateway park
play

Potrero Gateway Park Focus on the Rectangle GBD Presentation - PowerPoint PPT Presentation

Potrero Gateway Park Focus on the Rectangle GBD Presentation 9/18/2019 Who is the Steering Committee (PGP SC)? What problems are we trying to solve? Dangerous conditions for pedestrians and bikers on 17 th Street PGPL Steering Committee


  1. Potrero Gateway Park Focus on the Rectangle GBD Presentation – 9/18/2019

  2. Who is the Steering Committee (PGP SC)? What problems are we trying to solve? Dangerous conditions for pedestrians and bikers on 17 th Street • PGPL Steering Committee Vocation • Neighborhood population increase, but no corresponding increase Dianne Bates Vermont St. Marketing of parks • Daniel Belknap, Group I Building Design Illegal use of Caltrans right-of-way (dumping, camping) • 400 Block San Bruno – no protection from freeway (noise, dirt, JD Beltran, Utah St. Art, CCA, SFAC exhaust) Jean Bogiages, chair Software (retired) 400 Block Vermont – unsafe speeding from offramp down to 17 th St. • Will Chang, Mariposa St. Bioscience April Ellis, San Bruno St. Social work What kinds of solutions do we propose? JR Eppler, Utah St. Legal, Boosters • Bulbouts and enlarged sidewalks to increase safety Beautification of San Bruno / 17 th Street / Vermont • Michael Kerbow, Vermont St. Artist pedestrian and bike experience to increase activation. Steven Solomon, San Bruno Financial Planning (ret) • Additional green areas for sitting, walking, enjoying St. vegetation and view Daniel Sheeter, Potrero Ave. Engineer, SFMTA • Art experiences to increase activation Sheldon Trimble, Mariposa Interior Design • Green Fences to protect community from freeway Ave. • Removal of Lane on Vermont to provide traffic calming Who is our Public Works Manager? Michelle Woo, Public Works Manager

  3. Using the bionic drawing to illustrate, Potrero Gateway Park is the Rectangle. ENCAC awarded us funding for Phase 1, the area in the smaller yellow rectangle. Potrero Gateway Park

  4. What Funding does the MUNA PGP SC have for Phase 1 of Potrero Gateway Park? Amount Who has the Money For Awarded to Whom Deadline $279,470 MOHCD Design MUNA PGP Steering Committee/SFPA fiscal Sponsor $30,000 MOHCD Design MUNA PGP Steering Committee/D10 Addback $1,250,000 IPIC (ENCAC) Rec & Open MUNA PGP Steering Space Committee/PW Mgr $300,00 IPIC (ENCAC) Complete Streets MUNA PGP Steering Committee/PW Mgr $700,000 AHSC Grant Construction MUNA PGP Steering 2023? Committee/PW Mgr $300,000 Prop AA Grant Construction MUNA PGP Steering Committee/PW Mgr

  5. What has the PGP SC been up to? Discuss w/ GBD Limit of Work V1 Landscape Designer? No Bionic Contract Jean and JD Beltran talk with Jeff Miller Jean, JD Beltran and Julie Christensen PGP SC Meeting – met at Miller’s office PGR SC Meeting - after trying with and worked to define the Limit of Work exploring whether the Miller Company discuss the project directions with Jeff SFPA no resolution is found. Team Miller. It is agreed that Miller Co will based on V1 Miller had prepared. would be interested in taking on the decides to reduce limit of work and Miller produces a V2 for the group to project since we no longer have Bionic. contract to help with Limit of Work focus on Potrero Gateway Park. description if the PGR SC agrees. The review and discuss/update. committee would work with Miller. 2014 8/26 9/4 2013-2019 7/22 8/9 8/22 8/23 9/16 8/2 Contract w/ Miller Limit of Work V2 The Loop Discuss w/GBD Meet City Landscapers PGP SC Meeting - discusse options PGP SC Meeting – review and Working with Bionic, Jean and JR Eppler meet with Jean and JR Eppler meet with Jennifer Cooper- and decide to sign a contract with update Limit of Work V2 at Jean’s working with community, Julie Christensen and explain sabo, Lizzie Hisrsh and Michelle Woo to Miller in order to document the Limit house. Prepare notes to send creating conceptual design, the Phase 1 direction the discuss the possibilities – work with PW or of Work . PGP SC agreed to fund the back to Miller finding funding, getting a steering committee has decided execute another RFP for landscape design. contract. PW manager, City RFP, to take Scope of Work completed, STC not signed. Years of outreach to improve the 101 right-of-way area on San Bruno, 17 th and Vermont has resulted in a partnership with city agencies and private enterprises in order to design and build an urban park in the heart of the eastern neighborhoods

  6. Potrero Gateway Park Priorities – Limit of Work V2 – Work in Progress Area 1 a • Sidewalk expansion and concrete median protected bike lane • Art under the Freeway, protected by a walled vertex of the bridge underside • San Bruno bulbout and terraced garden area • Art infrastructure Plinth at Vermont corner • Landscape timber steps Area 1b • Sidewalk expansion on north of 17 th • Fence beautification • Concrete median protected bike lane replacing posts Area 2 • Continuation of 25 ft Green Fence Pilot • Landscaping • Widened sidewalk Area 3a • Widen sidewalk • Green area to the curb • Parallel parking Area 3b • Additional path from DG path to Vermont • DG Path and native planting • Live Oak replacing existing tree/bushes Area 4 • Continue green fence to protect from freeway • Expand /add sidewalk • Remove Parking

  7. A Closer Look at Areas 1a and 1b

  8. Next Steps….. • Complete the Limit of Work (V3) description by Oct 4. • Meet with PW Manager, PW Landscape, PW Streets & Highways • Determine working relationship with PW Landscape • Agree to a schedule • Agree to a Scope of Work Design contract for the MOHCD grant Questions?

Download Presentation
Download Policy: The content available on the website is offered to you 'AS IS' for your personal information and use only. It cannot be commercialized, licensed, or distributed on other websites without prior consent from the author. To download a presentation, simply click this link. If you encounter any difficulties during the download process, it's possible that the publisher has removed the file from their server.