Port of San Francisco Marine Structural Projects IV, (Pier 29 & 31.5 Substructure Repair) Contract No. 2790 January 3, 2018 AGENDA 1. Welcome & Introductions Andre Antonio 2. Project Overview Jonathan Roman 3. CMD Finbarr


slide-1
SLIDE 1

Port of San Francisco

Marine Structural Projects IV, (Pier 29 & 31.5 Substructure Repair) Contract No. 2790

January 3, 2018

slide-2
SLIDE 2
slide-3
SLIDE 3

AGENDA

  • 1. Welcome & Introductions – Andre Antonio
  • 2. Project Overview – Jonathan Roman
  • 3. CMD – Finbarr Jewell
  • 4. OLSE– Anna Liu
  • 5. OEWD – Ian Fernando
  • 6. Bid Documents – Andre Antonio
  • 7. Questions
slide-4
SLIDE 4
slide-5
SLIDE 5
  • Bundled separate Pier 29 and 31.5 projects into one construction project
  • Engineering for each pier was done by different firm.
  • Port no longer has contract for firm that did Pier 29.
  • Therefore, there are separate specifications for the work at each of the

piers.

  • Pier 29
  • Pier 31.5 (which includes portions of Pier 31 and 33 Aprons)
  • Environmental Requirements
  • Bidder Qualifications
  • Reference Documents
slide-6
SLIDE 6
slide-7
SLIDE 7
slide-8
SLIDE 8
slide-9
SLIDE 9
slide-10
SLIDE 10
slide-11
SLIDE 11
  • U.S. Longshore and Harborworkers’ Act Insurance (Section 00 73 16)
  • Section 01 57 20 – Construction in Water Bodies or Near San Francisco Bay

Environmental Requirements

  • RWQCB Order R2-2016-0039 Port of SF Maintenance Program
  • NOAA/NMFS Concurrence & Response for Port of SF Maintenance

Program

  • BCDC Permit No. M1977.017.19
  • Submittals
  • Spill Prevention and Control Plan
  • Environmental Health and Safety Plan
  • Best Management Practices (BMPs). See drawings and Section 01 57 13.
slide-12
SLIDE 12
  • Pier 29 to have multiple contractors working simultaneously (Section 01 31

13-1.03)

  • Pier 27 Cruise Terminal will remain operational (Section 01 31 13-1.03)
  • 33 CFR 165.1183(b)(1) – 100 yards ahead, astern and extending 100 yards

along either side of any cruise ship.

  • Cruise Ship Schedule - http://sfport.com/cruise
  • Pier 31.5 an active terminal for Alcatraz Tours operated by Hornblower
  • Schedule Milestones
  • Address the Technical Specs
slide-13
SLIDE 13
slide-14
SLIDE 14
slide-15
SLIDE 15
slide-16
SLIDE 16
slide-17
SLIDE 17
slide-18
SLIDE 18
slide-19
SLIDE 19
slide-20
SLIDE 20

Presented By: Finbarr Jewell Local Business Enterprise Goal = 3% 1.1% MBE 0.2% WBE 1.7% OBE Refer to Section 00 22 11 for details.

slide-21
SLIDE 21
slide-22
SLIDE 22
slide-23
SLIDE 23
slide-24
SLIDE 24

Presented By: Anna Liu

slide-25
SLIDE 25
slide-26
SLIDE 26

Employers need to match or exceed the City’s Ordinances for the following:

  • Prevailing Wages
  • Sick Leave
  • Health Care
  • Worker Compensation
slide-27
SLIDE 27
slide-28
SLIDE 28
  • Required per San Francisco Administrative Code Section 6.22(g) and Chapter 82
  • See Section 00 73 30 for details
  • Applies to both Prime Contractor and ALL Subcontractors
  • Local Hire Requirement 30% by trade
  • At least 50% of Apprentice project work hours within each trade shall be

performed by local residents.

slide-29
SLIDE 29

QBD  Addendum

slide-30
SLIDE 30

ENSUING SITE VISIT AT PIER 29 & 31.5

slide-31
SLIDE 31

Questions?