Port of San Francisco Marine Structural Projects IV, (Pier 29 & 31.5 Substructure Repair) Contract No. 2790 January 3, 2018 AGENDA 1. Welcome & Introductions Andre Antonio 2. Project Overview Jonathan Roman 3. CMD Finbarr
SLIDE 2
SLIDE 3
AGENDA
- 1. Welcome & Introductions – Andre Antonio
- 2. Project Overview – Jonathan Roman
- 3. CMD – Finbarr Jewell
- 4. OLSE– Anna Liu
- 5. OEWD – Ian Fernando
- 6. Bid Documents – Andre Antonio
- 7. Questions
SLIDE 4
SLIDE 5
- Bundled separate Pier 29 and 31.5 projects into one construction project
- Engineering for each pier was done by different firm.
- Port no longer has contract for firm that did Pier 29.
- Therefore, there are separate specifications for the work at each of the
piers.
- Pier 29
- Pier 31.5 (which includes portions of Pier 31 and 33 Aprons)
- Environmental Requirements
- Bidder Qualifications
- Reference Documents
SLIDE 6
SLIDE 7
SLIDE 8
SLIDE 9
SLIDE 10
SLIDE 11
- U.S. Longshore and Harborworkers’ Act Insurance (Section 00 73 16)
- Section 01 57 20 – Construction in Water Bodies or Near San Francisco Bay
Environmental Requirements
- RWQCB Order R2-2016-0039 Port of SF Maintenance Program
- NOAA/NMFS Concurrence & Response for Port of SF Maintenance
Program
- BCDC Permit No. M1977.017.19
- Submittals
- Spill Prevention and Control Plan
- Environmental Health and Safety Plan
- Best Management Practices (BMPs). See drawings and Section 01 57 13.
SLIDE 12
- Pier 29 to have multiple contractors working simultaneously (Section 01 31
13-1.03)
- Pier 27 Cruise Terminal will remain operational (Section 01 31 13-1.03)
- 33 CFR 165.1183(b)(1) – 100 yards ahead, astern and extending 100 yards
along either side of any cruise ship.
- Cruise Ship Schedule - http://sfport.com/cruise
- Pier 31.5 an active terminal for Alcatraz Tours operated by Hornblower
- Schedule Milestones
- Address the Technical Specs
SLIDE 13
SLIDE 14
SLIDE 15
SLIDE 16
SLIDE 17
SLIDE 18
SLIDE 19
SLIDE 20
Presented By: Finbarr Jewell Local Business Enterprise Goal = 3% 1.1% MBE 0.2% WBE 1.7% OBE Refer to Section 00 22 11 for details.
SLIDE 21
SLIDE 22
SLIDE 23
SLIDE 24
Presented By: Anna Liu
SLIDE 25
SLIDE 26
Employers need to match or exceed the City’s Ordinances for the following:
- Prevailing Wages
- Sick Leave
- Health Care
- Worker Compensation
SLIDE 27
SLIDE 28
- Required per San Francisco Administrative Code Section 6.22(g) and Chapter 82
- See Section 00 73 30 for details
- Applies to both Prime Contractor and ALL Subcontractors
- Local Hire Requirement 30% by trade
- At least 50% of Apprentice project work hours within each trade shall be
performed by local residents.
SLIDE 29
QBD Addendum
SLIDE 30
ENSUING SITE VISIT AT PIER 29 & 31.5