Port of San Francisco Marine Structural Projects IV, (Pier 29 & 31.5 Substructure Repair) Contract No. 2790 January 3, 2018 AGENDA 1. Welcome & Introductions Andre Antonio 2. Project Overview Jonathan Roman 3. CMD Finbarr


  1. Port of San Francisco Marine Structural Projects IV, (Pier 29 & 31.5 Substructure Repair) Contract No. 2790 January 3, 2018

  2. AGENDA 1. Welcome & Introductions – Andre Antonio 2. Project Overview – Jonathan Roman 3. CMD – Finbarr Jewell 4. OLSE– Anna Liu 5. OEWD – Ian Fernando 6. Bid Documents – Andre Antonio 7. Questions

  3. Bundled separate Pier 29 and 31.5 projects into one construction project • Engineering for each pier was done by different firm. • Port no longer has contract for firm that did Pier 29. • Therefore, there are separate specifications for the work at each of the • piers. Pier 29 • Pier 31.5 (which includes portions of Pier 31 and 33 Aprons) • Environmental Requirements • Bidder Qualifications • Reference Documents •

  4. U.S. Longshore and Harborworkers’ Act Insurance (Section 00 73 16) • Section 01 57 20 – Construction in Water Bodies or Near San Francisco Bay • Environmental Requirements o RWQCB Order R2-2016-0039 Port of SF Maintenance Program o NOAA/NMFS Concurrence & Response for Port of SF Maintenance Program o BCDC Permit No. M1977.017.19 Submittals • o Spill Prevention and Control Plan o Environmental Health and Safety Plan o Best Management Practices (BMPs). See drawings and Section 01 57 13.

  5. Pier 29 to have multiple contractors working simultaneously (Section 01 31 • 13-1.03) Pier 27 Cruise Terminal will remain operational (Section 01 31 13-1.03) • o 33 CFR 165.1183(b)(1) – 100 yards ahead, astern and extending 100 yards along either side of any cruise ship. o Cruise Ship Schedule - http://sfport.com/cruise Pier 31.5 an active terminal for Alcatraz Tours operated by Hornblower • Schedule Milestones • Address the Technical Specs •

  6. Presented By: Finbarr Jewell Local Business Enterprise Goal = 3% 1.1% MBE 0.2% WBE 1.7% OBE Refer to Section 00 22 11 for details.

  7. Presented By: Anna Liu

  8. Employers need to match or exceed the City’s Ordinances for the following: Prevailing Wages • Sick Leave • Health Care • Worker Compensation •

  9. Required per San Francisco Administrative Code Section 6.22(g) and Chapter 82 • See Section 00 73 30 for details • Applies to both Prime Contractor and ALL Subcontractors • Local Hire Requirement 30% by trade • At least 50% of Apprentice project work hours within each trade shall be • performed by local residents.

  10. QBD  Addendum

  11. ENSUING SITE VISIT AT PIER 29 & 31.5

  12. Questions?

Download Presentation
Download Policy: The content available on the website is offered to you 'AS IS' for your personal information and use only. It cannot be commercialized, licensed, or distributed on other websites without prior consent from the author. To download a presentation, simply click this link. If you encounter any difficulties during the download process, it's possible that the publisher has removed the file from their server.