Port Lands Zoning Review SAC Meeting #1 February 21, 2019 5:30 PM 7:30 PM Agenda + Overview Purpose Introduce the Port Lands Zoning Review Present the emerging direction, including use permissions, density, height, animation and
Agenda + Overview
Purpose
- Introduce the Port Lands Zoning Review
- Present the emerging direction, including use permissions, density,
height, animation and parking
- Obtain feedback from the SAC ahead of upcoming public consultation
meeting in late March.
Agenda
- Zoning Review Process Overview and Consultations
- Zoning Review Emerging Direction
- Facilitated Discussion – SAC Questions, Feedback and Advice
Introduction
Goal
Implement the direction of the Port Lands Framework and Official Plan Modification (OPM) within zoning, summarized by the following:
- Align ZBL with Council direction set out in the OPM
- Refine Industrial District uses
- Introduce new Park Districts
- Preserve dockwall for uses that require it
Port Lands Projects
2018 2019 2020 2021
Port Lands Zoning Review McCleary District Precinct Plan PIC Core Urban Design Guidelines Broadview + Commissioners MCEA Port Lands Flood Protection + Enabling Infrastructure Project Port Lands Truck Route Strategy
6
Polson Slip Naturalization (2) River Valley - Naturalization Area (3) Don Greenway (Spillway & Wetland) (4) Don Roadway Valley Wall Feature (8) East Harbour Flood Protection Land Form (9) Sediment and Debris Management Area (10) Flow Control Weirs (11) Eastern Avenue Flood Protection (12) Villiers Island Grading (19) Keating Channel Modifications (16) Promontory Park South (17b) River Park North (20) River Park South (21) Lake Shore Road and Rail Bridge Modifications (13) Cherry Street Bridge North (14b) Cherry Street Bridge South (14c) Commissioners Street Bridge (15b) Old Cherry Street Bridge Demolition (14d) Site Wide Municipal Infrastructure (5) Don Roadway (7a, 7b) Hydro One Integration (18) Commissioners Street West (15a) Commissioners Street East (15c) Cherry Street Re-alignment North and South (14a)
A B C D E F G H I J K L M N O P Q R S T U V W X
Earthworks/Flood Protection Pa rks Bridges & Structures Roads and Municipal Infrastructure Port Lands Flood Protection and Enabling Infrastructure Boundary Parks not included in scope
Flood Protection (2018-2023)
Why a Port Lands Zoning Review
- Existing Zoning Bylaw No. 438-86 is almost 35 years
and reflects the Former City of Toronto OP
- Outdated regulations result in rezonings or
variances for many uses the City is encouraging in the Port Lands
- Council approves Port Lands Official Plan
Modification (OPM) in December 2017
- Council approves the Port Lands Zoning Review at
the Dec. 2017 meeting
- Interim Control By-law for the Port Lands expires on
October 2, 2019
PIC Core Urban Design Guidelines Study Objective
Further Expand on PLPF PIC Core Use Direction for Turning Basin and Media City Districts to:
- Recommend Zoning By-law performance
standards for PIC Core uses
- Enhanced Direction on the built form of buildings
and site layout
- Clarify relationship between buildings + secure
perimiter and public spaces
- Design guidance of the public realm
- Identify what is required for a urban modern film +
creative hub
Timelines: Public + Stakeholder Consultation PIC Core UDG and Zoning Bylaw Review Draft – For Discussion
9
SAC/LUAC Meeting Meeting # 1 (Introduction to ZBR+UDG) TEYCC + City Council (Zoning Bylaws) (Sept 2019) Opportunity for Public Input Opportunity for Public Input Opportunity for Public Input Waterfront Toronto Design Review Panel (UDG Direction) Public Meeting # 2 (draft final ZBA)
Q1 2019 The PIC Core Urban Design Guidelines and Port Lands Zoning Review processes are undertaken concurrently through an iterative process.
Public Meeting # 1 (Introduction to ZBR+UDG) SAC/LUAC Meeting # 2 (Technical Review of ZBR) SAC/LUAC Meeting # 3 (draft final ZBA)
Q2
SAC/LUAC Meeting # 4 (draft final UDG) Public Meeting # 3 (draft final UDG)
Q3
Opportunity for Public Input Waterfront Toronto Design Review Panel (draft final UDG ) WE ARE HERE
Context
Official Plan Designations
The Former City of Toronto Official Plan is in-force for the Port Lands and the land use designations are Industrial and Open Space within the Study Area.
Zoning By-Law 438-86
The Former City of Toronto Official Plan is in-force for the Port Lands and the lands in the Study Area are zoned IC, I2, I3 and I4, with a number of Section 12 Exceptions permitting site-specific uses that are not consistent with the underlying zoning.
Port Lands Planning Framework + OPM
A Film-Friendly Future
- Diverse range of film activities
accommodated
- Flexibility and adaptability for a
changing industry Industry + Port Thrives
- Sufficient lands to support industrial,
port and City-servicing uses Growing and Sustaining Our Economy
- Diverse opportunities
- Near-term vs longer-term
- Intensification of employment uses
to support 25-30 k employees
Port Lands Planning Framework + OPM
Zoning Review Study Area
Diverse Ownership
Zoning Review Approach
- Overall Strategy:
- Updating and modernizing Port Lands zoning
by using Zoning By-law No. 569-2013
- Draft Zoning By-law for each district to be
developed;
- All Zoning By-laws to be advanced in one
comprehensive package (1 Council Report)
- PIC Core Urban Design Guidelines will inform
Turning Basin, Media City and Warehouse District Zoning By-laws
- Allows for more robust consultation &
integration of outputs from studies
Direction
Using Zoning By-law No. 569-2013
- On May 9, 2013, City Council adopted City-
wide Zoning By-law No. 569-13
- Majority of the 569-13 LPAT Appeals have
been resolved
- Zoning By-law No. 438-86 has outdated use
definitions and requirements that are inconsistent with the PLFP
- Zoning Bylaw No. 438-86 is not on-line, not
up-to-date, and difficult to access
Zoning Bylaw Components
- Permitted Uses and Qualifications (size or
location)
- Activation Areas
- Height and Density
- Setbacks and Build-to Lines
- Minimum and Maximum Parking Rates
- Zoning Overlays
- New Definitions
South Ship Channel + East Port Issues
- Current Zoning does not
permit concrete batching as-of-right
- Uses that require dock
wall access are not prioritized adjacent to dock walls
- Marine/Port uses are
not included in the Zoning By-law
Harbour Lead Line Rail Siding
South Ship Channel + East Port Dockwall
- Uses that require dockwall access
prioritized
- Concrete Batching + City-serving
uses
- Screening and enclosure
- Servicing and interim uses
- Managing nuisances and land use
conflicts
Ship Channel + East Port
Planning Direction
South Ship Channel + East Port
Proposed Use Changes – Permitted Uses
- Port Priority Uses (e.g.
ship repair, marine shipping, container storage)
- Concrete Batching w/
enclosed storage
- Renewable Energy Uses
Removed Uses
- Open Storage
- Manufacturing and other Industrial
- Self-Storage Warehouse
- Automobile – related uses
- Noxious Uses (e.g. incinerator, sewage
disposal plant, rubber factory, gas plant)
South Ship Channel + East Port
Proposed Use Changes – Conditional Uses
Warehouse District Review Issues
- Heavy uses exist in this
area, which the City is not encouraging in the future (i.e. Canroof)
- Mix of City and Federal
- wnership, long-term
leases, and private lands
- Large parcels of land
- Is the transition from an
urban employment district to heavier industrial
PIC Core Review Issues
- Current Zoning (I4
segments) does not permit production and broadcasting
- Heavy and noxious uses are
permitted in this area, which the City is not encouraging in this area
- Mix of City and Provincial
- wnership, long-term
leases, and private lands
Warehouse and PIC Core Districts
Planning Direction
- Will transition from heavy to light
industrial and production uses
- Green industries, production and
studio infrastructure encouraged
- Urban form will support cycling,
walking and public realm
- utcomes
- Modern, compact, street related
buildings suited to adaptive re-use
Warehouse and PIC Core Districts
Proposed Use Changes – Permitted Uses
- Screen-Based Industries
- Renewable Energy Uses
- Industrial Workshops and Studios
- Arts, Design and Cultural Related
Uses
- Complemented by permissive
Light Industrial uses (e.g. manufacturing)
Warehouse and PIC Core Districts
Proposed Use Changes: Conditional Uses
- Office
- Retail
- College / University
- Entertainment
Removed Uses
- Self-Storage Warehouse
- Automobile – related uses
- Noxious Uses (e.g. concrete
batching, sewage disposal plant, rubber factory, gas plant)
Parks and Open Space Issues
- Current Zoning (I2, I3 & I4)
- Timing of parks/open
space delivery
- Accommodating interim
uses
PIC Core + Warehouse Activation Areas
Port/Industrial Uses
- 9 m setback
- Screening & landscaping
PIC Core
- 0 m setback from public
streets
- 3+ Stories
- Larger Production Spaces
Primary Retail Street
- 3+ Stories
- Require Retail
- 70% Transparency
Secondary Retail Street
- 3+ Stories
- Protect for Retail and Service
- 70% Transparency
Waters’ Edge Promenade
- Required Retail and Service
All Media City + Turning Basin District Animation Zones
- 1st Storey Min. 5m floor to Ceiling Heights
- Protect conversion to narrow (~7 m wide) Frontages for
fine grain retail + service in the future.
Activation Areas - Direction
33
- Selecting appropriate uses = permissive, flexible
- Activated and public facing
- Compact urban form, street-oriented ground plane
- Heights of 3 storeys minimum
- Smaller footprints or larger complexes with multiple
tenants
- EO uses can be a public facing component of an
adjacent Industrial Use
Translating Height and Density
34
- Based on PLPF direction and OPM policies
.
- 5m ground floor requirement on Priority and Secondary
Retail Streets for adaptive reuse
- Exploring height minimums and maximums
- Testing density permissions in Warehouse and PIC Core
- 3 storey (12 metre) minimum on major streets
- Modern, compact and street related buildings
Preliminary Direction: Height and Density
Right-Sizing Parking
Port Lands Planning Framework + OPM policies that support the travel mode targets include:
- Maximum parking standards are to be developed and
introduced for all uses permitted in the Port Lands.
- Minimum parking standards, if provided, will support
achievement of shifts to transit and active transportation as primary means of moving in and through the area. How will minimum and maximum parking rates be determined?
- “First principles” approach – align with future auto mode share
- Access to transit – reflect proximity to future higher-order
transit network
- Land use categories – reflect varying employee densities
- Parking surveys of existing industrial uses – serve as comparison
Preliminary Direction - Zoning Overlay
Feedback
What do you like about the emerging direction?
Had anything major been missed
- r of concern to you?