Committee of Nature Use, Environmental Protection and Environmental Safety Poligon Krasny Bor Alexey Trutnev Historical reference St. Petersburg State Unitary environmental enterprise "Polygon" Krasny bor" was created on


slide-1
SLIDE 1

Poligon Krasny Bor

Alexey Trutnev

Committee of Nature Use, Environmental Protection and Environmental Safety

slide-2
SLIDE 2

Historical reference

  • St.

Petersburg State Unitary environmental enterprise "Polygon" Krasny bor" was created on the basis of the Leningrad Executive Committee decision Number 1068 from 12.02.1967, entered Into operation in 1969.

  • The area - 73 hectares.
  • Located on the array of blue Cambrian clay

capacity of more than 80 m.

  • The landfill is surrounded by marsh, which is a

natural filter.

  • Enterprise

is intended for reception, decontamination and disposal of industrial and toxic waste companies in St. Petersburg and the Leningrad region.

  • There is a bypass channel created on the outer

contour of the polygon to intercept surface waters from the area to the landfill.

slide-3
SLIDE 3

The landfill is located in the area of Tosno district, Leningrad region, and is about 7 km south-easterly from the town of

  • Kolpino. The main area of the sanitary

protection zone of the landfill is located within the Tosno district, and only in the north-eastern sector in a small area it includes the Kolpino district of St. Petersburg.

Sanitary Protection Zone (SPZ) of the landfill is stretched up to 3 km from its border area, the total area of the SPZ is about 39 km2. In the sanitary protection zone there are some residential areas (villages Krasny Bor, Feklistov, Mishkino, Porkuzi and north-western sector of the village Nikolsky), a quarry on the development of Cambrian clay LSR Group and agricultural land. In addition, in a northern direction at a distance of 1 km from the boundaries of the landfill is located the former landfill of solid domestic and industrial waste "Ust-Tosna".

Polygon location

3

slide-4
SLIDE 4

Waste disposal technology

  • Hazard wastes of the I class were placed in sealed metal

containers in a specially prepared waste pit.

  • Hazard wastes of the II-IV classes were

placed in designated pits by type:

Organic (№№ of pits 64, 68);

 Oily (number 68);  Acid and alkaline (№№ 59,66,67).

  • Annually the Landfill took about 13 thousand tones of

waste.

  • Currently it has been accumulated more than 2 million

tons of waste. The existing pits of open storage of

  • rganic wastes (№№ 64, 68) contain about 700 000

tons of waste.

  • The

accumulated environmental damage requires immediate elimination.

64 68 59 64

slide-5
SLIDE 5

Accepted wastes

64 68 59 64

№ Name, hazard class Amount% State of aggregation Description classification

1 Hazard waste I class : salts of heavy metals, poisons, etc. (Containers) 5 Liquid– 20% Solids – 80% extremely dangerous 2 Hazard Waste II сlass 10 Liquid – 90% Solids – 10% highly dangerous 3 Hazard Waste III сlass 70 Liquid – 90% Solids – 10% moderately hazardous 4 Hazard Waste IV сlass 15 Liquid – 30% Solids – 705 low hazard The average annual flow of waste, tons 13 000

slide-6
SLIDE 6

Since January 2014 the Landfill does not accept waste

  • Unloading platforms of pits are covered

with a clay lock, waste disposal is impossible.

  • Polygon is guarded around the clock,

there is a running video surveillance system with recording, making impossible the smuggling of waste on the landfill.

Government of St. Petersburg has made a decision upon the indefinite cessation of the receiving of the wastes and the full remediation of the landfill

slide-7
SLIDE 7

Completed works

  • Works on the perimetral video

surveillance system reconstruction, fire alarm and access control systems

slide-8
SLIDE 8
  • Works on neutralizing the organic waste in

the pits № 59,66,67 using chalk.

  • Ph value level is raised to 3.5 with 1

Completed works

slide-9
SLIDE 9
  • Launch
  • f

wastewater treatment facility. Its performance is about 20 m3 per hour.

Completed works

slide-10
SLIDE 10
  • Works on the current repair of canal

cross regulator

  • New

gateway is equipped with automatic control and provides sealing

Completed works

slide-11
SLIDE 11
  • The works on grass cutting on slopes and

embankment of waste storages

  • The works on cleaning of internal and bypass

channels from sediment and vegetation

Completed works

slide-12
SLIDE 12

Before After Completed works

slide-13
SLIDE 13

Dangerous flood situation in 2016

In February 2016 there was a dangerous flood situation due to the early melting

  • f snow in the Polygon:
  • The fluid level rise in the open pits №64 and №68
  • The level of water in the inner channel
  • The level of water in the bypass channel

The following measures have been taken by the direction of Polygon and the Committee for elimination of dangerous flood situation:

slide-14
SLIDE 14

Embankment dams closure The pit №68 (in the area of the former unloading area) and the pit №64 (in the area of the pumping station)

Pit №68 Pit №64

slide-15
SLIDE 15

The upper part of the bypass channel is not filled. The water level in the bypass duct was lowered by the pumping water from the filled part in unfilled. An empty part is separated from the clay-filled lock

Liquid level lowering in the bypass channel

clay lock

slide-16
SLIDE 16

In addition the water level in the inner channel has been lowered by pumping water into the 130-th storage pond

slide-17
SLIDE 17
  • The water from the landfill goes into

the storage pond, then into the body of treatment facilities, then resets to the main channel.

  • Removal of untreated sewage doesn’t

take place

Polygon has received a permission for water disposal, the discharge of water is taking place after water treatment plant only

slide-18
SLIDE 18

1. The Committee established the Scientific and Technical Environmental Council (APEC) on the Krasny Bor issues. The council includes professors, academics, doctors and representatives of the Russian Academy of Sciences in the field of ecology, chemistry, geology, interested in solving the problem

  • f the Krasny Bor instead of lobbying for their own political and economic

interests. 2. Work out a solution with regard to the legal form of the SPB SUEE "Polygon Krasny Bor " - during the 2016 the Landfill will be transformed into a state budgetary institution. 3. In 2016 it was allocated a subsidy in amount of 52 million. rub., which is sufficient for the payment of wages to employees and organization of

  • peration of the Polygon hydraulic structures. Also it has been prepared a

rationale for additional subsidies in amount of 108 mln. rub. 4. The question of allocation of funds from the reserve fund of the Government

  • f St. Petersburg for 2016 for the elimination of Polygon debt, the purchase
  • f additional pollution control equipment, technology and additional
  • perations are being worked out.

The measures taken by the Committee to prevent dangerous situations in the future

slide-19
SLIDE 19

Information about the "breakthrough of the dam" 10/03/2016

Main canal Gateway

The dam covers the place of the main channel output to the landfill site. Since October 2015 the dam is closed and is in good working order. In October 2015, in a ditch before entering the Polygon there were established 2 clay locks in

  • rder to prevent the melt water drains out of the test site during the flood.

Ditch Clay lock

slide-20
SLIDE 20

10.03.2016 at 21:55 it was found a violation of the integrity of the first clay lock (1). The integrity of the second clay lock was not compromised (2). 10.03.2016 at 22:30 the integrity of the clay lock has been restored 1 2

The potentially contaminated water being caught between two clay locks was pumped out and placed in a hazardous waste storage card. By now, there is a single clay lock 20 m in length.

Information about the "breakthrough of the dam" 10/03/2016

slide-21
SLIDE 21

Prospects of Polygon

Priority actions: To close the pits №64 and №68 by special material This closing is intended to prevent the ingress of water in the pits and liquid level increase, besides the shelter will provide the fire safety of pits and eliminate the evaporation. The material to be used is resistant to chemicals and UV light. It’s expected to complete the works by the end of 2016

№68 №64

slide-22
SLIDE 22
  • 2. Creating a wastewater treatment system

Pit №64 Pit №68

The internal channel Bypass channel

pre-treatment 130th ponds Treatment 5 m³ / h 10 m³ / h Wastewater treatment Plant 115 20 m³ / h Wastewater treatment Plant 50 m³ / h 15 m³ / h

Main channel

15 m³ / h

2016 – project development 2017 – construction

slide-23
SLIDE 23

Long-term perspective

 Polygon territory shall be subject of recultivation for the purpose of complete elimination of the negative impact on the environment (appropriate applications are prepared and sent in the established order for funding from the federal budget to provide the complex engineering surveys (40 mln. rub.), develop a draft of the Polygon reclamation (200 mln. rub.) under the federal program for the elimination of the accumulated environmental damage).

Steps to bring the landfill in a safe state:

  • 1. Surveying the landfill site with a full range of

research (2016)

  • 2. Development of design estimates for

reclamation (2017)

  • 3. Obtaining a positive conclusion of State

Expertise on the design and estimate documentation (2018)

  • 4. Conducting reclamation landfills in

accordance with the developed project (2019- 2021).

  • 5. Postreclamation object monitoring (2022 - ...)
slide-24
SLIDE 24

The task on chemical soil pollution at Krasny Bor surrounding areas was also highlighted as one of the topic for future Russian-Finnish collaboration during ENI 2014-2020 program period. As a result we're planning to apply for ENI program with

  • ur Finnish colleagues from GTK (Geological Survey of Finland), ELY-centre (Centre for

Economic Development, Transport and the Environment of the Southwest Finland)

  • etc. this autumn.

Potential project is expected to include information and best practice sharing in the field of toxic waste treatment, risk assessment and management of landfills and their surroundings. Practical actions would be pathway identification and modeling and environmental sampling in the surrounding areas, but not on the landfill area

  • itself. As a result recommendations on soil pollution mitigation for the Krasny Bor

surrounding areas are being developed. The ENI planning meeting with focus on future projects discussion will be held on May, 26-27th 2016 in St. Petersburg.

Foreign cooperation

slide-25
SLIDE 25

Conclusions:

  • 1. Polygon does not take waste and in the future will never take
  • 2. Dangerous flood situation on the territory of the Polygon has been
  • prevented. It was ensured the protection of the territory, excluding the

unauthorized importation of waste into landfill.

  • 3. The water treatment plants are launched, the discharge of water is taking

place after water purification only.

  • 4. There are environmental risks of accidents associated with:
  • The ignition ability of easily flammable wastes, placed on the surface of

pits №64 and № 68.

  • The ability of open pits breakthrough due to embankment dams of the

pits №64 and № 68.

  • 5. As a part of the scientific and technical council it has been conducted an

intensive search for the best environmentally-safe technical solutions for the elimination

  • f

accumulated environmental damage and complete remediation of the Polygon.

  • 6. There is search of financing sources for the inspection and further

reclamation

  • f

landfills. Financial support from the international

  • rganizations would significantly speed up the problem solving.
slide-26
SLIDE 26

Thank you for attention!

Alexey Trutnev

Committee of Nature Use, Environmental Protection and Environmental Safety