Plug and Abandonment Guidelines, Challenges, the Future May 8, 2015 “To promote safety, protect the environment and conserve resources offshore through vigorous regulatory oversight and enforcement.”
zyxwvutsrqponmlkjihgfedcbaZYXWVUTSRQPONMLKJIHGFEDCBA Overview Regulatory Distinction TA vs PA, etc. zyxwvutsrqponmlkjihgfedcbaZYXWVUTSRQPONMLKJIHGFEDCBA Upcoming Revisions Departure/Alternate Compliance Regulations Going Forward 2
zyxwvutsrqponmlkjihgfedcbaZYXWVUTSRQPONMLKJIHGFEDCBA Classifications Zonal Isolation zyxwvutsrqponmlkjihgfedcbaZYXWVUTSRQPONMLKJIHGFEDCBA Defined by NTL 2010-G05 Well isolated downhole without further barriers (1715(a)(1),(a)(2), or (a)(3) May be left in this condition for two years Requires Alternate Compliance, if applicable 3
zyxwvutsrqponmlkjihgfedcbaZYXWVUTSRQPONMLKJIHGFEDCBA Classifications Temporary Abandonment zyxwvutsrqponmlkjihgfedcbaZYXWVUTSRQPONMLKJIHGFEDCBA Governed by 30 CFR 250.1721 Must meet all of 1715 minus 1715(a)(8) 100’ surface plug must be placed within 1000’ of mud line Annular isolation still required per 1715(a)(6) 4
zyxwvutsrqponmlkjihgfedcbaZYXWVUTSRQPONMLKJIHGFEDCBA Classifications Permanent Abandonment zyxwvutsrqponmlkjihgfedcbaZYXWVUTSRQPONMLKJIHGFEDCBA Must abide by 1715 Casing cut 15’ BML unless below 800 m (2624 feet) All zones must be plugged as per regulation or with District Manager approval All annuli must be isolated 5
zyxwvutsrqponmlkjihgfedcbaZYXWVUTSRQPONMLKJIHGFEDCBA Upcoming Changes 30 CFR 1715(a)(3)(iii)(B) Confusion due to outdated wording (B) refers to casing bridge plug zyxwvutsrqponmlkjihgfedcbaZYXWVUTSRQPONMLKJIHGFEDCBA (E) refers to tubing bridge plug (A),(B),(C) original PA regulation (D),(E) added to accommodate tubing left in hole Regulation (B) will be written to refer to “casing bridge plug” when practical 6
zyxwvutsrqponmlkjihgfedcbaZYXWVUTSRQPONMLKJIHGFEDCBA Regulatory Deviations zyxwvutsrqponmlkjihgfedcbaZYXWVUTSRQPONMLKJIHGFEDCBA Alternate Compliance Allows operator to meet the “intent” of regulation Require PE certification to read as above. Example: Program meets intent of 1721, etc. Granted at District level 7
zyxwvutsrqponmlkjihgfedcbaZYXWVUTSRQPONMLKJIHGFEDCBA Regulatory Deviations zyxwvutsrqponmlkjihgfedcbaZYXWVUTSRQPONMLKJIHGFEDCBA Departure Requested when operator cannot meet regulation Example: Deepwater casing annulus lacks 200’ of cement PE certification must read “cannot meet” regulation Granted, rarely, at the Regional level 8
zyxwvutsrqponmlkjihgfedcbaZYXWVUTSRQPONMLKJIHGFEDCBA Going Forward zyxwvutsrqponmlkjihgfedcbaZYXWVUTSRQPONMLKJIHGFEDCBA Annular isolation Balanced cement plugs (“Horse collar”) Potential for filter cake on casing Hole cleaning Quality of isolation? 9
zyxwvutsrqponmlkjihgfedcbaZYXWVUTSRQPONMLKJIHGFEDCBA Going Forward zyxwvutsrqponmlkjihgfedcbaZYXWVUTSRQPONMLKJIHGFEDCBA Annular isolation Deep Penetration (DP) guns Effectiveness? Testing? Quality of cement job 10
zyxwvutsrqponmlkjihgfedcbaZYXWVUTSRQPONMLKJIHGFEDCBA Going Forward zyxwvutsrqponmlkjihgfedcbaZYXWVUTSRQPONMLKJIHGFEDCBA Annular isolation Deepwater No monitoring of outer annuli Mud line hanger wells without annular mechanical barriers 11
BSEE Website: www.bsee.gov @BSEEgov BSEEgov Bureau of Safety and Environmental Enforcement zyxwvutsrqponmlkjihgfedcbaZYXWVUTSRQPONMLKJIHGFEDCBA “To promote safety, protect the environment and conserve resources offshore through vigorous regulatory oversight and enforcement.”
BRINGING WELL ABANDONMENT CEMENT PLUG OPERATIONS INTO THE 21 ST CENTURY WITH
Plug & Abandonment Forum (PAF) Desired P&A direction - P&A
Contents Eclipse Plug-ins Introducing OSGi Eclipse Plug-ins 1 Plug-in
Abandonment Case WAB17-0004 (Old Mount Rose Highway) Abandonment Area Washoe
WALL PLUG PLUG-IN SWITCH & POWER METERING MANY FEATURES IN A SINGLE
Plug-In Folly Part 5 by Pat Murphy, Plan Curtail Part 5A: Conclusion Plug-In
Checkout Usability Guidelines for reducing cart abandonment Rachele DiTullio
Plug-In Folly Part 4 by Pat Murphy, Plan Curtail PART 4A: The Plug-In Hybrid
PLUG PLUG Presentation Layer Universal Generator Presentation Layer
AutoPowerOff plug banks - or Standby killers The background How it works for
ME 101: Engineering Mechanics Rajib Kumar Bhattacharjya Department of Civil
The Office of Oil and Gas; Oil and Gas Wells West Virginia Department of
Richard L. Prager, MD Project Director, MSTCVS Quality Collaborative Medical
LE TAVI AUJOURDHUI ET DEMAIN DOIT ON ENCORE CONTRE INDIQUER LE TAVI DANS LA
EPOXY RESIN DEMONSTRATES INTEGRITY & FINANCIAL ADVANTAGES IN O&G WELL
FMC Subsea Drilling Systems UWD-SB 13 5/ 8 Wellhead System June 2010 Chelsi
Subsea Facilities Decommissioning Selected Practical Optimisations and
Carlsbad Brine Well Remediation Project Carlsbad, New Mexico State of New
Lumbar disc herniations in athletes Gino Chiappe+a, M.D. University
Interim May Report 2019 TRC-B&C-02-19 MEASUREMENTS TO QUANTIFY THE
21/08/2013 The Path to Disaster The Deepwater Horizon BPs disaster in the
Case Presentation: Undetected Hypoventilation Hillary Loomis-King, MD