Pier 23 & 19 Restroom Upgrades Contract No. 2809 January 16, 2019 1 AGENDA 1. Welcome, Introductions, & General Information Andre Antonio 2. Project Overview Raman Singh 3. CMD Finbarr Jewell 4. OLSE Anna Liu 5. OEWD


slide-1
SLIDE 1

Pier 23 & 19 Restroom Upgrades Contract No. 2809

January 16, 2019

1

slide-2
SLIDE 2
slide-3
SLIDE 3

AGENDA

  • 1. Welcome, Introductions, & General Information – Andre Antonio
  • 2. Project Overview – Raman Singh
  • 3. CMD – Finbarr Jewell
  • 4. OLSE– Anna Liu
  • 5. OEWD – Joyce Wong
  • 6. Environmental – Soko Made
  • 7. Bid Documents – Andre Antonio
  • 8. Questions
slide-4
SLIDE 4
slide-5
SLIDE 5
slide-6
SLIDE 6
  • Refer to Section 00 73 16 for details.
  • Worker’s Compensation, Commercial General Liability, Commercial

Automobile Liability

  • U.S. Longshore and Harborworkers’ Act Insurance; Jones Act; Workers’

Compensation

  • Watercraft Liability Insurance
  • Water Pollution Insurance
  • Builder’s Risk Insurance (Section 1.3A-1)
  • The amount of coverage shall be equal to 100% of the bid total.
slide-7
SLIDE 7
slide-8
SLIDE 8
slide-9
SLIDE 9

Presented by: Raman Singh raman.singh@sfport.com

slide-10
SLIDE 10
  • Bid Opening

February 14, 2019

  • Award of Contract

March 12, 2019

  • NTP, Construction Start

May 2019

  • Duration

120 Consecutive Calendar Days after NTP

  • Substantial Completion

September 2019

  • Final Completion

November 2019

slide-11
SLIDE 11
  • Project Coordination (Section 01 31 13)
  • Pier 23 and Pier 19 both occupied with tenants. Impacts to tenants should be minimized.
  • Critical Submittals
  • Health and Safety Plan per Section 01 35 45.
  • Site-Specific Dust Control Plan (DCP) per Section 01 57 19.
  • Spill Prevention and Control Plan for overwater work per Section 01 57 20.
slide-12
SLIDE 12
slide-13
SLIDE 13
slide-14
SLIDE 14

Presented By: Finbarr Jewell finbarr.jewell@sfgov.org

  • Local Business Enterprise (LBE)

Subcontracting Goal = N/A

  • Must be a certified Micro-LBE at bid time.
  • Must complete a minimum 25% of contract value.
  • Refer to Section 00 22 11 for details.
slide-15
SLIDE 15
slide-16
SLIDE 16

16

slide-17
SLIDE 17
slide-18
SLIDE 18

Presented by: Anna Liu anna.liu@sfgov.org

slide-19
SLIDE 19
slide-20
SLIDE 20
slide-21
SLIDE 21
slide-22
SLIDE 22

Presented by: Joyce Wong joyce.s.wong@sfgov.org

  • Required per San Francisco Administrative Code Section 6.22(g) and Chapter 82
  • See Section 00 73 30 for details
  • Applies to both Prime Contractor and ALL Subcontractors
  • Local Hire Requirement 30% by trade
  • At least 50% of Apprentice project work hours within each trade shall be

performed by local residents.

NOT REQUIRED

slide-23
SLIDE 23

Presented by: Soko Made rusununguko.made@sfgov.org Construction & Demolition (C&D) Debris Management Requirements

  • See Section 01 74 50 for details
  • Minimum Diversion Rate of 75% Required
  • Source‐separated C&D debris material must be taken to a facility that reuses

and/or recycles that material

  • MIXED C&D debris material must be taken to a REGISTERED FACILITY by a

REGISTERED TRANSPORTER

  • Diversion Reporting – Use Form C for initial, monthly, and final reports
  • Weight Tags are required for monthly reporting
  • Contractor MUST include materials from ALL Subcontractors in reports
  • City Representative is responsible for reviewing, signing, and approving all

reports submitted by the Contractor.

slide-24
SLIDE 24

QBD  Addendum