Pillar Point Marina Johnson Pier Improvements Objectives: Roadway Geometric Remove Existing Timber Pier & Dock Improvements Improve Truck Maneuverability Expand Pier (Infill) Extend Pier (South) Replace Fuel Dock


slide-1
SLIDE 1

Johnson Pier Improvements

Pillar Point Marina Fuel Dock Replacement South Pier Extension Pier Infill Roadway Geometric Improvements

Objectives:

  • Remove Existing Timber Pier & Dock
  • Improve Truck Maneuverability
  • Expand Pier (Infill)
  • Extend Pier (South)
  • Replace Fuel Dock
  • Environmental Compliance
slide-2
SLIDE 2

Pillar Point Marina – Johnson Pier Improvements

Site Plan

slide-3
SLIDE 3

Pillar Point Marina – Johnson Pier Improvements

Truck Access

Available space for 3 trucks

slide-4
SLIDE 4

M&N Proposal

Pillar Point Marina – Johnson Pier Improvements

Board Presentation March 2019 Phase 1 – Conceptual Design TBD Geotechnical, Bathymetry Pile Assessment Phase 2 – Preliminary Design TBD Board Presentation Phase 3 – Permitting TBD CEQA, Regulatory Permits (Johnson Pier, Fuel Dock, Dock H) Phase 4 – Final Design TBD Board Presentation(s) Phase 5 – Bid & Construction Support TBD

slide-5
SLIDE 5

Anticipated Construction Cost (ROM)

Pillar Point Marina – Johnson Pier Improvements

slide-6
SLIDE 6

Phase 1 – Proposed Fee

Pillar Point Marina – Johnson Pier Improvements

Estimated Total Professional Services Fee (Phases 1-5): $888 ,000 - $1,318,000