www.england.nhs.uk
Phil Smith NHS England Projects Appraisal Unit Skipton House, 80 London Road, London SE1 6LH. phil.smith8@nhs.net Monday 23rd November 2015
Phil Smith NHS England Projects Appraisal Unit Skipton House, 80 - - PowerPoint PPT Presentation
Phil Smith NHS England Projects Appraisal Unit Skipton House, 80 London Road, London SE1 6LH. phil.smith8@nhs.net Monday 23rd November 2015 www.england.nhs.uk g ? g g PAU At a glance guide This 'At a Glance' guide is provided to
www.england.nhs.uk
Phil Smith NHS England Projects Appraisal Unit Skipton House, 80 London Road, London SE1 6LH. phil.smith8@nhs.net Monday 23rd November 2015
www.england.nhs.uk
NHS England Project Appraisal Unit
Construction / refurbishment capital investment and project activity guide: 2015-2016
Financial Close Financial Close Pre AssessmentIssue Interim Certificate?
?
RIBA 2007► RIBA 2013 ►
OBC FBC Construction Phase
Approved clinical service strategy Approved Estates Strategy Approved Travel Plan Approved Sustainable Dev. Policy/Plan Commissioner support
For SOC g For OBC g For FBC g Allow 13 weeks post written approval for judicial review where full planning approval (FPA) is pre 30th June 2013. Allow 6 weeks where FPA is from 1st July 2013This 'At a Glance' guide is provided to assist those staff /organisations new to NHS business case process for construction and refurbishment projects. It is recommended that exact requirements and timings are confirmed with key stakeholders including the approving body before progressing individual project proposals.
Stage C Design Concept Stage 2 Mid Design OBC procurement decision 3 Definition Strategic Outline Case (SOC) LIFT Stage 1 business caseRoyal Institute of British Architects (RIBA) Stages
Dependant on nature of scheme and Local Authority planning requirements Construction Phase Stage A Project Appraisal Stage B Design Brief Stage J: Mobilisation Stage K: Construction to practical completion. Stage L Post Practical Completion Check drawing requirement with approving body Strategic Definition 1 Preparation & BriefPrivate Finance Initiative (PFI /PF2) business case phasing
Strategic Outline Case (SOC) [Project Initiation Document - PID- for smaller schemes]Developing Operational Policies to support the design and budget options
Strategic Outline Case (SOC)NHS Local Improvement Finance Trust (LIFT) business case phasing
DATA EXCHANGE 2 Outline Solution ModelPost Project Evaluation
Stage E: Technical Design Stage F: Production Stage G: Tender documentation Stage H: Tender Action DATA EXCHANGE 1 Requirement & Constrain Model DATA EXCHANGE 3 Construction Information ModelPSCP selected Contract entered into Design Development Building Information Modelling (BIM) (BIM Task Group update July 2013)
6 Handover 7 In useExternal Design Review Panel (DRP)
via CABE / Design Council
Stage 1 Briefing DATA EXCHANGE 4 Operation and Maintenance Information Model Post Project Evaluation (PPE) Phase Post Project Evaluation (PPE)Other key project activity Optimum time period 1
SOC
Local Authority Planning Approval (Full)
NHS England PAU (1) September 2014 (2) Spring 2015 (3) May 1st 2015 Construction Phase Construction Phase Post Project Evaluation (PPE) Gateway 0 (Strategic Assessment) Gateway 5 (Benefits Evaluation) Gateway 2 Procurement Strategy) Outline Business Case (OBC) Full Business Case (FBC) Dependant on nature of scheme Dependant on nature of scheme and Local Authority planning requirementsBRE Environmental Assessment Model (BREEAM) Design (Quality Indicator) assessments (DQI) with Construction
Industry Council update 2014
Stage 5 In use Gateway 1 (Business Justification) Design Stage Assessment Stage 4 Ready for Occupation EvaluationIssue Final Certificate
2 Concept Stage D/E Design and cost estimates Minimum1:200 drawings for preferred option. Possibly greater detail for novel, contentious, derogated designsStandard project/business case phasing
Pre OBC procurementDepartment of Health (DH) ‘Health Gateway Reviews’ (DH Health Gateway update July 2013)
LIFT Stage 2 business case Gateway 3 (Investment Decision) Gateway 4 (Readiness for Service) DATA EXCHANGE 5 Post Occupation Validation Information Model and on-going O&M Construction Phase Post Project Evaluation (PPE) PhasePrivate Finance Initiative (PFI /PF2) business case approvals
Post Project Evaluation (PPE) Outline Business Case (OBC) Post Project Evaluation (PPE) Construction Phase Stage 3 Detailed DesignTrust registers scheme PSCP selection process
Phase P21+ Stage 5 P21+ Stage 1 P21+ Stage 2 P21+ Stage 3 P21+ Stage 4 Stage D Developed Design (1:200)Procure 21 plus (P21+) Key Stages Optimum time period 1 Construction
BUSINESS CASES stages
DQI f H
RIBA design stages BREEAM stages
RIBA stage A, B RIBA stage C to E RIBA stage F to H RIBA stage J, K RIBA stage L
0 & 1 Preparation 0 & 1 Preparation 2 Concept Design 2 Concept Design 3 Developed Design 3 Developed Design 4 Technical Design 4 Technical Design 5 Construction 5 Construction 6 Handover & close out 6 Handover & close out 7 Use & Aftercare 7 Use & Aftercare Condition survey and recording Condition survey and recording Quantity takeoff and commercial management Quantity takeoff and commercial management Construction phasing and sequence planning Construction phasing and sequence planning Spatial programming Spatial programming Site analysis Site analysis Design review processes Design review processes Design process Design process Design output generation Design output generation Analysis of design - engineering Analysis of design - engineering Lighting analysis Lighting analysis Sustainability analysis and evaluation Sustainability analysis and evaluation Planning and Building regulations validation Planning and Building regulations validation 3D Co-ordination 3D Co-ordination Site utilisation planning Site utilisation planning Construction system design Construction system design Fabrication processes Fabrication processes 3D project control 3D project control Field management Field management Physical record modelling Physical record modelling Data transfer and authoring - CAFM Data transfer and authoring - CAFM Performance monitoring Performance monitoring System control System control Space utilisation - monitor and planning Space utilisation - monitor and planning Asset management Asset management Hard / Soft FM procurement and market test Hard / Soft FM procurement and market test Planned maintenance Planned maintenance Scenario modelling Scenario modelling Agency – marketing / leasing / disposal to market Agency – marketing / leasing / disposal to market Development appraisal Development appraisal Unachievable Unachievable Achievable / challenging Achievable / challenging Achievable Achievable Asset management Asset management