Phase 4

slide-2
SLIDE 2

MARTIN LUTHER KING JR. BLVD. DOWNING BROADWAY

RTD COMMUTER RAIL

BRIGHTON

S O U T H P L A T T E R I V E R

CITY PARK GOLF COURSE

BASIN RUNOFF

We’re installing a storm sewer system with a five-year capacity to service Five Points, Whittier, City Park West and Cheeseman Park. Our goal is to improve drainage during storm events and address areas where significant flooding could occur.

WHAT

slide-3
SLIDE 3

MARTIN LUTHER KING JR. BLVD. DOWNING BROADWAY

RTD COMMUTER RAIL

BRIGHTON

S O U T H P L A T T E R I V E R

CITY PARK GOLF COURSE

BLAKE 33RD ON T MAR

We’re installing a storm sewer system with a five-year capacity to service Five Points, Whittier, City Park West and Cheeseman Park. Our goal is to improve drainage during storm events and address areas where significant flooding could occur. This project includes additional improvements to connecting systems upstream in areas to the east, which are also at increased risk of flooding.

WHAT

slide-4
SLIDE 4

CURTIS

MESTIZO-CURTIS PARK

MARTIN LUTHER KING JR. BLVD. CHAMPA 32ND ST. 33RD ST. DOWNING 33RD AVE. MARION LAFAYETTE

COLE MIDDLE SCHOOL

This is a map of the Phase 4 project and all steps included.

WHAT

slide-5
SLIDE 5

36th & Walnut Welton & Washington Welton & 27th

WHY

The new storm system will carry storm runof and snowmelt safely to the South Platte River, reducing the risk of damage to residential and commercial properties. These are some examples of the worst flooding in the neighborhood.

slide-6
SLIDE 6

MARTIN LUTHER KING JR. BLVD. DOWNING BROADWAY

RTD COMMUTER RAIL

BRIGHTON

S O U T H P L A T T E R I V E R

CITY PARK GOLF COURSE

MART R IN L DOWNING BRIGHT

BASIN

WHY

slide-7
SLIDE 7

MARTIN LUTHER KING JR. BLVD. DOWNING BROADWAY

RTD COMMUTER RAIL

BRIGHTON

S O U T H P L A T T E R I V E R

CITY PARK GOLF COURSE

BASIN BOUNDARY

WHY

R RA

MART R IN LUTHER KING JR B M

FLOODING DEPTH IN 100-YEAR EVENT

6” to 12” 12” to 36”+

slide-8
SLIDE 8

MARTIN LUTHER KING JR. BLVD. DOWNING BROADWAY

RTD COMMUTER RAIL

BRIGHTON

S O U T H P L A T T E R I V E R

CITY PARK GOLF COURSE

WHY

R RA

MART R IN LUTHER KING JR B M

WORST INTERSECTIONS

BASIN BOUNDARY

slide-9
SLIDE 9

MARTIN LUTHER KING JR. BLVD. DOWNING BROADWAY

RTD COMMUTER RAIL

BRIGHTON

S O U T H P L A T T E R I V E R

CITY PARK GOLF COURSE

33RD L N IN TO HT

WHY

R RA

MART R IN LUTHER KING JR B LU M

BASIN BOUNDARY

slide-10
SLIDE 10

WHY

These are photos of some of the existing 100-year-old brick storm vaults — they are severly undersized and contribute to flooding issues. Phase 4 of the 33rd Street Outfall project will increase capacity throughout the whole system, taking pressure

  • f of older structures

like these.

slide-11
SLIDE 11

WHY

The existing storm system underneath the streets in these neighborhoods is severly undersized — some are only 18 inches wide, which contributes greatly to flooding. The new box culverts we will be installing are 10 foot wide by 8 feet deep — that means almost 43 times as much water can flow through this new and improved system.

EXISTING 18" CIRCULAR STORM DRAIN IN MLK JR BLVD (CROSS-SECTIONAL AREA = 1.8 SQUARE FEET) NEW 10'x8' CONCRETE BOX IN MLK JR BLVD (CROSS-SECTIONAL AREA = 78.0 SQUARE FEET) EXISTING SYSTEM NEW 5-YEAR SYSTEM TWO 6'-TALL CONSTRUCTION WORKERS

slide-12
SLIDE 12

CURTIS M A R T I N L U T H E R K I N G J R . B L V D . CHAMPA 33RD ST. DOWNING

To safely perform this extremely

HOW

complicated construction, we will need to close this intersection for approximately 3 months. We will be providing ample warning, workarounds and detour route This project is very information repeatedly throughout large and complex, and the project. this will cause impacts — which we will work Our goal is the safety of the to minimize. traveling public, and that of the residents in the surrounding As you can see, the neighborhood — hence the structure underneath necessity of this closure. the intersection of Downing and MLK is incredibly massive and complex.

slide-13
SLIDE 13

DOWNING STREET, LOOKING SOUTH

PROPOSED TRENCH

HOW

In addition to this massive structure that we are installing, we have to navigate around and relocate an incredibly dense network of utilities.

PROPOSED PRECAST STORM DRAIN EXISTING SANITARY SEWER WATER LINE EXISTING STORM DRAIN EXISTING SANITARY SEWER EXISTING FIBER OPTIC GAS LINE

20 TO 40 FEET WIDE 27 FEET DEEP

slide-14
SLIDE 14

MARTIN LUTHER KING JR. BLV DOWNING BROADWAY

RTD COMMUTER RAIL

BRIGHTON

S O U T H P L A T T E R I V E R

CITY PARK GOLF COURSE

YORK BRUCE RANDOLPH 31ST. 29TH. WILLIAMS CURTIS 32ND.

LOCAL DETOURS REGIONAL DETOURS

WHERE

Detours will be in place throughout the duration of the project. Signage will clearly define and direct the detour routes, and we will be sending out weekly impact / detour maps in our email updates — so be sure to sign up for these crucial emails. Access to businesses and residents inside the project will always be open.

slide-15
SLIDE 15

MARTIN LUTHER KING JR. BLV DOWNING BROADWAY

RTD COMMUTER RAIL

BRIGHTON

S O U T H P L A T T E R I V E R

CITY PARK GOLF COURSE

I-70 PROJECT

WHERE

The project team is actively coordinating with the I-70 project engineers — no conflicts between the two projects are currently known.

slide-16
SLIDE 16

CURTIS

MESTIZO-CURTIS PARK

MARTIN LUTHER KING JR. BLVD. CHAMPA 32ND ST. 33RD ST. DOWNING 33RD AVE. MARION LAFAYETTE

COLE MIDDLE SCHOOL

WHEN

Phase 4 of the 33rd St. Outfall project will take approximately 32 weeks. Each project segment is shown here, with approximate timeframes for each segment.

A

1

PPROXIMATELY 6 WEEKS A

2

PPROXIMATELY 14 WEEKS A

3

PPROXIMATELY 12 WEEKS

(PERFORMED BY MULTIPLE CREWS)

slide-17
SLIDE 17

Stay informed!

slide-18
SLIDE 18

Visit the project website: denvergov.org/33rdStreetOutfall

slide-19
SLIDE 19

Sign up for weekly construction updates at info@33rdstoutfall.com. Email us at info@33rdstoutfall.com.

slide-20
SLIDE 20

Call the project hotline at 720.295.9761 for weekly updates, and to leave a message with questions or concerns.

slide-21
SLIDE 21

Other contacts: David Shaw, Project Manager 303.446.3456 / david.shaw@denvergov.org Dustin Clark is the Project Superintendent for the contractor, Concrete Works of Colorado. 303.419.3837 / dustinc@cwc-email.com