1
PT PT PAM LYON PAM LYONNAISE JAYA JAYA
PALYJA PALYJA
The W he Water ater O Oper perat ation
- n f
for
- r Wes
este tern J n Jaka akart rta
6 March 2013
PALYJA PALYJA The W he Water ater O Oper perat ation on f - - PowerPoint PPT Presentation
PALYJA PALYJA The W he Water ater O Oper perat ation on f for or Wes este tern J n Jaka akart rta 6 March 2013 1 PT PT PAM LYON PAM LYONNAISE JAYA JAYA HISTO HISTORY AND AND BACK BACKGROUN UND 2 2 HISTORY HISTORY UPP
1
PT PT PAM LYON PAM LYONNAISE JAYA JAYA
The W he Water ater O Oper perat ation
for
este tern J n Jaka akart rta
6 March 2013
2 2
HISTO HISTORY AND AND BACK BACKGROUN UND
3
HISTORY HISTORY
3
Western part of Jakarta since February 1st 1998. 25 years concession contract. Eastern part of Jakarta since February 1st 1998. 25 years concession contract. June 1997 : Cooperation Agreement between PAM PAM Jaya (DKI Water Operator) and Sue Suez Environnement (Western Jakarta) and with Thames Water (Eastern Jakarta) : boundary of Ciliwung River. Form of Cooperation: Delegation of PAM Jaya water service to the private
after the end of cooperation period.
UPP PUSAT UPP BARAT UPP SELATAN CILIWUNG RIVER4
INSTI TITUT TUTIONA IONAL S L STAKEHO EHOLDE LDERS M RS MAPPING ING
4
5 51% Suez Environnement 49% Astratel Nusantara
PALY ALYJA JA S SHAR HARE H E HOLD OLDIN ING
* * Astrat Astratel el is fully is fully owned
by PT Astra Intern Internat atio ional al Tbk Tbk.
5
6
Water suppl Water supply
Production
Distributi tion
Customer servi service ces
(metering – billing – collection)
Maintenanc nce & & Repair Repair
Investment nt
PALY ALYJA JA SCOP COPE
6
Techni Technical al Target Targets and and Servic Service Stand Standard rds
Contract p performances measured i in terms o
7
PALY ALYJA JA S SNAP NAPSH SHOT A T AS O OF 2 2012 012
≈ 4.5 million
Population
407,000
Connections
≈ 5,300 km
Network
159,8M m3
Volume Billed 2012
≈ 1,400
Employees
≈ 1,171 BIDR
Revenue 2012
≈ 1,7 BIDR*
Investment
* 1998-2012
8
HEALTH AND HEALTH AND SAFETY SAFETY
9
HEALTH AND HEALTH AND SAFETY SAFETY
.
**frequency rate: Num ber of accident per total of hours worked by all em ployees. ***severity rate: Num ber of days away from work due to work place injury or illness per total num ber of hours worked by all em ployees.
2010 2011 2012 Frequency rate 2,7 0,403 0,79 (target 2.1) Severity Rate 0,01 0,008 0,0012 (target 0.08) Fatal Accident Medical check up for all PALYJA employees Vehicle Rate Accident
10 10
Water Water Oper Operati ting Syste System
11 11
JAKA AKART RTA MAI AIN W N WATE ATER R R RESO ESOUR URCES
61% 33% 1% 4% 1%
12
PALY ALYJA JA W WATE ATER T R TREA REATM TMENT NT PLAN LANTS TS A AND D ND DISTR ISTRIBU BUTIO ION CENT ENTER ERS
12
WTP Cilandak 400 l/s
WTP Pejompongan 1&2 Max 2000 + 3600 l/s DCR 5 1,100 l/s
DCR 4 2,200 l/s
Raw Water PJT-II Max 6200 l/s
Current water delivery to the system 8.1 m3/sec
BTW Cikokol Max 100 l/s BTW Cisadane Max 2900 l/s
13
WATE ATER T R TREA REATME MENT P T PLAN LANTS TS AND M ND MAJOR AJOR R RESE ESERV RVOIR IRS
Pejompongan 1 / Degremont 1953
Capacity: 2,000 l/s Clarifiers → 6 Accelerators Filter → 48 Rapid Sand Filter
Pejompongan 2 / Degremont 1964
Capacity: 3,600 l/s Clarifiers → 4 Pulsators Filter → 34 Aquazur Type T Filter
WTP Capacity
Pejompongan 1 2,000 l/s Pejompongan 2 3,600 l/s Cilandak Taman Kota 400 l/s 150 l/s
Major Reservoir Volume
DCR 4 22,500 m 3 DCR 5 22,500 m 3
Cilandak / 1977 & 1999 (Degremont)
Capacity: 2 x 200 l/s
Taman Kota / 2012
Capacity: 150 l/s with biological filtration
13
14
300 km km
320 km km
008 km km of
pipe. Materials:
CI: Cast Iron DCI: Ductile Cast Iron GIP: Galvanized Iron HDPE: High Density Polyethylene PVC: Polyvinyl Chloride STL: Steel Others: Asbestos-Cem ent and unknown
Distribution Network Distribution Network
14
PALYJA NETWORK
15 15
Network maintenance Network maintenance
More than 63,000 Visible and invisible leaks repaired HELIUM DETECTION: 4,665 km of network inspected to find leakages 2,999 invisible leakages detected
2012 Figures
16 16
Key Performa formance I nce Indicators cators
17
17
KEY P EY PERFO ERFORMAN ANCE I E INDI NDICA CATOR ORS
+6.5 millions m3
Volume Sold
37,9%
Non Revenue Water
18
KPI KPI improvements improvements - 1998 1998 to to 2011 2011
19
Improvement Improvement of
Supply Conditions Conditions
Continuous Supply Intermittent Supply No Water 19
In 15 years, around 2300 km of pipe have been laid for rehabilitating or extending the network
2012 2012 1998 1998
20
TARI ARIFF FFS
21
TARI ARIFF FF S STRU TRUCT CTURE RE S SINCE INCE J JANU ANUAR ARY 2007 007
Note: The above tariff grid is based on volumetric calculation
Categories Description Governor’s decree. No. 17/2006 Dated: 15 January 2007 0-10 m 3 11-20 m 3 >20 m 3 K I Social Customers 1,050 1,050 1,050 K II Low Income Domestic 1,050 1,050 1,575 K III A Middle Class 3,550 4,700 5,500 K III B Upper Class & Small Business 4,900 6,000 7,450 K IV A Upper Class & Small Business 6,825 8,150 9,800 K IV B Non Domestic 12,550 12,550 12,550
21
22
TARI ARIFF FF S STRU TRUCT CTURE RE
SOCIAL (KI) LOW-INCOME (KII) MIDDLE CLASS (KIIIA) UPPER CLASS & SMALL BUSINESS (KIIIB) UPPER CLASS & SMALL BUSINESS (KIVA) NON DOMESTIC (KIVB)
22
Customer category is defined based on housing surface : KII : ≤ 28.8 m 2 KIIIA : 28.8 to ≤ 70 m 2 KIIIB : 71 to ≤ 120 m 2 KIVA : > 120 m 2 KIVB : defined based on the usage of the building or the business activity present in the building.
23
CROS ROSS S S SUBS UBSIDI DIZED ED S STRUC TRUCTUR URE
Customers, Volume sold and Revenue per Tariff group
23
24
CROS ROSS S S SUBS UBSIDI DIZED ED STRUC TRUCTUR URE
Water Tariff per Tariff group (volumetric)
W ater Charge (Indexed)
24
Around 83% of customers, consuming ≈ 50% of the water is paying less than the cost of the service
Indexed Water Charge 8,102 IDR/m3 Frozen Water Charge 7,248 IDR/m3
25
Evolu Evolution of
Customer er data databas ase 1998 / 1998 / 2012 2012
1998 : 201,668 2012: 407,470
Domestic and in particular low income population (K2 +K3A) benefited the most of Coverage extension and increase in connections + 78% + 842% + 43% + 52% + 92% + 72%
25
26 26
ISO ISO Certification Certifications
27
ISO 17025: 2000 certification on Laboratory M anagement
System Application awarded in 2005 for Central Laboratory and its supporting process.
ISO 9001: 2008 certification on Quality M anagement
System Application awarded in: UPP and support process (awarded in 2009) Water Treatment Plant and its supporting
Water Distribution Process and its supporting process, (awarded in 2011) Customer complaints handling (awarded in 2012)
OHSAS Certificate: awarded in 2010 for Occupational
Health and Safety.
Certification Certifications
ISO 1 17025 / ISO 9 9001 / / OHSAS
27
28
NEW EW ISO SO 9001 01-20 2008 C 08 CERTIF TIFICAT ICATION ION
Certification for Complaints Handling by Customer Care Department, August, 6 2012
29 29
CORPORATE CORPORATE SOCIAL SOCIAL RESPONSIBILITY RESPONSIBILITY
30
PALY ALYJA JA C CORP ORPOR ORATE TE S SOCIA OCIAL RESPO PONSI NSIBILI BILITIE TIES V S VISION ON
WATER FOR ALL
ON OUTPUT BASED AID (GPOBA)
HEALTH & EDUCATION
FACILITIES
SCHOOL STUDENT
EXHIBITION
ENVIRONMENT
COM M UNITY
CAM PAIGN
TREE
HUMANITARIAN RELIEF
DONATIONS AND SUPPORT ACTIONS FOR DISASTER VICTIM S, M ISSION RELIEF: ACEH, YOGYAKARTA, TASIKM ALAYA & PADANG
31
PT PT PAM LYON PAM LYONNAISE JAYA JAYA
Melayani Dengan Hati