Royal Geographical Society of Queensland Our New Home we are not moving far 28 Fortescue Street Spring Hill 237 Milton Road Milton Central Station 28 Fortescue Street Spring Hill Level 1 (whole floor) 28 Fortescue Street Spring Hill


slide-1
SLIDE 1

Royal Geographical Society

  • f Queensland

Our New Home

slide-2
SLIDE 2

28 Fortescue Street Spring Hill 237 Milton Road Milton

we are not moving far…

slide-3
SLIDE 3

Central Station 28 Fortescue Street Spring Hill

slide-4
SLIDE 4

Level 1 (whole floor) 28 Fortescue Street Spring Hill

slide-5
SLIDE 5

Side Entry to 1st Floor Side Entry to Underground Car Park 28 Fortescue Street Front and rear views

slide-6
SLIDE 6
  • Most existing desks

to go

  • Small meeting

room retained

  • Boardroom to stay
slide-7
SLIDE 7

transport options..

slide-8
SLIDE 8

Public Transport Nearby Bus Stops and Train Stations

slide-9
SLIDE 9
  • 30 - Spring Hill Loop

(free bus) – Join bus at Stop 141- Central Station; Nearest stop to future RGSQ – Stop 180 in Boundary Street

  • P341 - to Bracken Ridge

Join bus at Central; Nearest stop to future RGSQ – Stop 178 – in Little Edward St Key Bus Services

slide-10
SLIDE 10

Parking Stations Metered roadside parking available

slide-11
SLIDE 11

Daytime Parking: Street Parking: metered at $1.60 per hour Car Parking Stations: Far too expensive per hour Evening Parking: Street Parking: After 7:00pm – Free Car Parking Stations: Cheapest – BCC Station at Wickham Terrace, Central Station. $5 for evening, then walk to RGSQ

BCC Car Park – Wickham Tce.

slide-12
SLIDE 12

Building Details

  • Premises built in 1985
  • 3 commercial levels & 3 residential levels
  • RGSQ now owns whole of 1st floor
  • Underground car park - RGSQ has 4 spaces
  • 1st floor: 316 sq. m. floor area. For context - upper floor on

237 Milton Road approx. 400 sq.m. (including former Auditorium)

  • Access to 1st floor via Lift - capacity approx. 10 people
  • Dual fire escape stairwells
  • Entry: Via key card access or intercom admittance
  • Disabled parking is available at rear of building
  • 10 minute Set Down at front of building
slide-13
SLIDE 13

Level 1 Details

  • Size: 316 sq.m. floor space, plus common property Lift &

Stairwells

  • Existing Kitchen: Equipped with refrigerator, water cooler,

microwave, cupboards, food trolley

  • Existing Fit-Out: From previous tenant. Some will be kept
  • Fit-Out Kept: Board Room table and chairs, overhead

projector; electronic white board; Concertina Walls and 2 small meeting rooms; enough desks and chairs to cover RGSQ needs; some wall partitioning; storage room extended

  • Toilets: Men’s and Women’s toilets and shower exist,

disabled toilet on ground floor.

slide-14
SLIDE 14

Space Usage (Initial Concept)

  • 4 layout plans drawn (3 included Reception Area)
  • 1 layout included GTAQ small office – no longer required
  • Board Room & Small Meetings Room
  • Kitchen
  • Library and Map Library + small meeting room
  • Staff Offices including Utility/Printing area
  • Larger Meetings Area (enough seating for lecture nights). To

to be Multi-Use: daytime/night time talks, other activities, Geography Competition work area

  • Storage Areas: Collection/Archives, & Furniture/Equipment

Final space allocations being determined in consultation with interested parties – will see alterations to Initial Concept.

slide-15
SLIDE 15
  • Concept Plan “C”

– Committee considers this Concept the best

  • f 4 proposed

layouts.

  • Has Been Altered

by Consultations – interested parties involved.

  • Partially in Place

during Move – eg Library set up early as can’t store journals or maps

slide-16
SLIDE 16

The relocation will be done in stages

  • Settlement Date: Was in late August, 2018
  • Move Office Staff and RGSQ Collection: Before end September,

2018 (exit Milton Road & rental agreement – save $15,000)

  • Premises Fit-Out: Need to prepare with works starting in late

Oct/early Nov, 2018. Then move staff & everything else to final locations by end of 2018 year.

  • Welcome to Members Evening: By early 2019 RGSQ will be “ready

for members”. Expect February, 2019 Meeting in “new” premises.