OBrien Street Roadway Improvements Cypress Street to Spruce Street - - PowerPoint PPT Presentation

o brien street roadway improvements
SMART_READER_LITE
LIVE PREVIEW

OBrien Street Roadway Improvements Cypress Street to Spruce Street - - PowerPoint PPT Presentation

OBrien Street Roadway Improvements Cypress Street to Spruce Street CUMBEY & FAIR, INC i AGENDA AGENDA PROJECT UNDERSTANDING ROADWAY DESIGN DRAINAGE & PERMITTING MANAGEMENT PLAN PROJECT UNDERSTANDING Project


slide-1
SLIDE 1 CUMBEY & FAIR, INC

O’Brien Street Roadway Improvements

Cypress Street to Spruce Street

slide-2
SLIDE 2

i

AGENDA

slide-3
SLIDE 3

AGENDA

 PROJECT UNDERSTANDING  ROADWAY DESIGN  DRAINAGE & PERMITTING  MANAGEMENT PLAN

slide-4
SLIDE 4

PROJECT UNDERSTANDING

slide-5
SLIDE 5

Project Understanding

CURRENT TRAFFIC OVERVIEW

  • Queues from the dual

northbound left‐turn lanes frequently extended back to the south end of O’Brien St.

Afternoon Peak Dual Northbound left-turn lanes fail Morning Traffic from Veterans Expressway and Courtney Campbell Causeway utilizes Spruce Street Exit

slide-6
SLIDE 6

Project Understanding

FUTURE TRAFFIC OVERVIEW

  • SR 60 @ I-275 Ultimate

configuration with express lanes

  • The conceptual graphic was

created for planning and discussion proposes as of 12/19/13

  • The improvements will not

significantly improve the traffic on O ‘Brien St.

Afternoon Peak Reo St. to Kennedy

  • Blvd. to SR 60
slide-7
SLIDE 7

PUBLIC INVOLVEMENT

O’ BRIEN ST SPRUCE ST

Hillsborough County Aviation Authority (HCAA) South Terminal Roadway Design/Build

slide-8
SLIDE 8

Project Understanding

Pedestrian & Bike Accommodations

  • Multi-Use Path

Terminal

  • Connection to Rail

Station Area at I-275 along Cypress Street

City of Tampa Future Bike Lanes & Sidewalks Project Westshore Alliance Future Sidewalks Project HCAA Airport Sidewalks & Multi- Use Path Project FDOT Sidewalks & Multi- Use Path Project

RAIL STATION
slide-9
SLIDE 9

ROADWAY DESIGN

slide-10
SLIDE 10

ROADWAY DESIGN

PROJECT LOCATION MAP & EXISTING TYPICAL SECTION

O’ BRIEN ST SPRUCE ST LAUREL ST CYPRESS ST PHASE ONE PHASE TWO
slide-11
SLIDE 11

ROADWAY DESIGN

Existing Typical Sections

  • Phase One Laurel St. to Spruce St.

– 3-lane rural roadway – two-way left-turn center lane – Right-of-way width varies (85 ft min) – Existing sidewalk on west

  • Phase Two Cypress St. to Laurel St.

– 2-lane rural roadway – Right-of-way width varies (70 ft min) – No sidewalk

slide-12
SLIDE 12

ROADWAY DESIGN

Typical Sections

  • Phase One Laurel St. to Spruce St.

– 4-lane urban roadway – two-way left-turn center lane – 6 ft. sidewalk on west

  • Phase Two Cypress St. to Laurel St.

– 4-lane urban roadway – two-way left-turn center lane – 6 ft. sidewalk both sides

slide-13
SLIDE 13

DRAINAGE & PERMITTING

slide-14
SLIDE 14

Stormwater Management Plan

  • Eliminate South Basin Pond
– Maintain existing discharge rate to Lemon St. Canal – Add new outfall to Spruce Street Canal – Hydraulic modeling works! – No regrading of existing pond
  • No rework of pond liner
  • No regrading of existing 10 ft wide maintenance berm
– $600K Pond Construction & ROW Savings!!! – Added value for the City
  • Excess treatment capacity
  • Eliminate 8 Parcel Takes
  • Minimize Reconstruction, Maximize

Resurfacing in South Basin

– Lower existing pond control to match adjacent pond – Discharge low areas to Outfall Ditch untreated – Minimize gravity walls – Reduced storm drain construction
slide-15
SLIDE 15

Permitting

  • Southwest Florida Water Management District (SWFWMD)
– Met with Richard Alt, Jeff Glass & Estella Gray on July 1st – Agreeable to Spruce Street Canal Outfall – Agreeable to discharging low inlets directly to outfall ditch – Attenuation required for existing outfall to Lemon Street Canal
  • FDOT Drainage/Driveway Connections
– Met with Daniel Lauricello, District Drainage Engineer, on July 1st – Agreeable to Spruce Street Canal Outfall
  • Army Corp of Engineers Section 404 Permit
  • Hillsborough County EPC Permit
  • FAA Regulations for Pond Design
  • City of Tampa Stormwater Technical Standards Manual for

Public Development

slide-16
SLIDE 16

MANAGEMENT PLAN

slide-17
SLIDE 17

Management Plan

Project Objectives

  • Keep projects independent (flexibility for construction funding)

– Phase One Laurel Street to Spruce Street – Phase Two Cypress Street to Laurel Street

  • Minimize Right-of-Way Impacts
  • Simplify drainage/permitting
  • Coordinate with adjacent developers, FDOT, utility companies,

HCAA, Westshore Alliance & other stakeholders

slide-18
SLIDE 18

Management Plan

Notice to Proceed Phase II (Plans & ROW Maps) Submittals 268 Date (Documents to Right-of-Way) North Segment (Plans & Maps) Submittals South Segment (Plans & Maps) Submittals 15% Line and Grade Submittal Design Survey Obtain SWFWMD/USACOE Permit Approval Submit SWFWMD/USACOE Permit Application SWFWMD/USACOE Joint Pre-App Meeting 45% Drainage Submittal

Permitting Plan Preparation

2016 2015 2017

Project Schedule

slide-19
SLIDE 19

Management Plan

  • Public Involvement (Coordinate with all of the project’s stakeholders)

Public Workshop April 2016 City of Tampa Commission Meeting May 2016 Working with HCAA EOR on the reconstruction of the Airport Service Road Working with FDOT on the SR 60 @ I-275 Interchange

  • Drainage/Permitting (Min. ROW Impacts & Meet Permitting

Requirements)

Submit Permit Application for SWFWMD/USACOE Permit March 2016 Eliminate “New Pond” reconfigure existing pond Lower Tail water elevation with new outfall

  • Roadway (Min. ROW & Utility Impacts)

ROW requirements For City Review April 2016 Eliminate reconstruction & walls utilize overbuild and widening Livable Communities (Westshore Alliance & HCAA #1 Concern Peds & Bikes)

slide-20
SLIDE 20

Questions?

Cumbey & Fair, Inc. is certified as both a Small Disadvantaged Business (SBE) and a Small Business Administration 8(a) Business by the Federal Government.