Main Street Paving & Streetscape Reconstruction
From FM 731 (Crowley Road) to Beverly Street
Proposed Roadway Improvements
2
- 0.56-mile (3,000 LF) concrete roadway with curb
and gutter
- Curb inlets and an underground drainage system
- Roundabouts at Beverly Street and Roberts Street
- On-street parking improvements
Proposed Streetscape Improvements
3
- Protected 6-foot wide bike lanes
- 7-foot to 11-foot wide Americans with Disabilities
Act (ADA) compliant sidewalks
- Pedestrian light posts and landscape planting
- Street furniture – benches, trash receptacles,
bike racks, tree grates
- Enhanced paving pattern on sidewalks and
pedestrian crosswalks
Proposed Typical Sections
4
Proposed Typical Sections
5
Project Cost and Construction Schedule
6
- Estimated Cost: $7.2 Million
- Anticipated Construction Start: Mid-2019
- Anticipated Construction Duration: 1 Year