12 1 3 2018
play

12/1 3 /2018 Proposed Roadway Improvements Main Street Paving & - PDF document

12/1 3 /2018 Proposed Roadway Improvements Main Street Paving & 0.56-mile (3,000 LF) concrete roadway with curb Streetscape Reconstruction From FM 731 (Crowley Road) to Beverly Street and gutter Curb inlets and an underground


  1. 12/1 3 /2018 Proposed Roadway Improvements Main Street Paving & • 0.56-mile (3,000 LF) concrete roadway with curb Streetscape Reconstruction From FM 731 (Crowley Road) to Beverly Street and gutter • Curb inlets and an underground drainage system • Roundabouts at Beverly Street and Roberts Street • On-street parking improvements 1 2 Proposed Streetscape Improvements Proposed Typical Sections • Protected 6-foot wide bike lanes • 7-foot to 11-foot wide Americans with Disabilities Act (ADA) compliant sidewalks • Pedestrian light posts and landscape planting • Street furniture – benches, trash receptacles, bike racks, tree grates • Enhanced paving pattern on sidewalks and pedestrian crosswalks 3 4 Proposed Typical Sections Project Cost and Construction Schedule • Estimated Cost: $7.2 Million • Anticipated Construction Start: Mid-2019 • Anticipated Construction Duration: 1 Year 5 6 1

  2. 12/1 3 /2018 Main Street Rendering Main Street Rendering 9 10 Main Street Rendering 11 2

Download Presentation
Download Policy: The content available on the website is offered to you 'AS IS' for your personal information and use only. It cannot be commercialized, licensed, or distributed on other websites without prior consent from the author. To download a presentation, simply click this link. If you encounter any difficulties during the download process, it's possible that the publisher has removed the file from their server.

Recommend


More recommend