12/1 3 /2018 Proposed Roadway Improvements Main Street Paving & - - PDF document

12 1 3 2018
SMART_READER_LITE
LIVE PREVIEW

12/1 3 /2018 Proposed Roadway Improvements Main Street Paving & - - PDF document

12/1 3 /2018 Proposed Roadway Improvements Main Street Paving & 0.56-mile (3,000 LF) concrete roadway with curb Streetscape Reconstruction From FM 731 (Crowley Road) to Beverly Street and gutter Curb inlets and an underground


slide-1
SLIDE 1

12/13/2018 1

1

Main Street Paving & Streetscape Reconstruction

From FM 731 (Crowley Road) to Beverly Street

Proposed Roadway Improvements

2

  • 0.56-mile (3,000 LF) concrete roadway with curb

and gutter

  • Curb inlets and an underground drainage system
  • Roundabouts at Beverly Street and Roberts Street
  • On-street parking improvements

Proposed Streetscape Improvements

3

  • Protected 6-foot wide bike lanes
  • 7-foot to 11-foot wide Americans with Disabilities

Act (ADA) compliant sidewalks

  • Pedestrian light posts and landscape planting
  • Street furniture – benches, trash receptacles,

bike racks, tree grates

  • Enhanced paving pattern on sidewalks and

pedestrian crosswalks

Proposed Typical Sections

4

Proposed Typical Sections

5

Project Cost and Construction Schedule

6

  • Estimated Cost: $7.2 Million
  • Anticipated Construction Start: Mid-2019
  • Anticipated Construction Duration: 1 Year
slide-2
SLIDE 2
slide-3
SLIDE 3

12/13/2018 2

Main Street Rendering

9

Main Street Rendering

10

Main Street Rendering

11