City of St. Pete Beach Pass-a-Grille Way Roadway Improvements Cabrillo Ave. to 19 th Ave. April 2, 2014 Public Meeting Presentation by: Welcome Seeking Public Input on Roadway Corridor Construction Project Overview Tree Preservation


slide-1
SLIDE 1

City of St. Pete Beach

Pass-a-Grille Way Roadway Improvements Cabrillo Ave. to 19th Ave.

April 2, 2014 Public Meeting

Presentation by:

slide-2
SLIDE 2

Welcome

Seeking Public Input on Roadway Corridor Construction

Pass-a-Grille Way Roadway Improvements Cabrillo Ave. to 19th Ave.

  • Project Overview
  • Tree Preservation
  • Sidewalks & Bike Lanes
  • Intersection of 21st &

Pass-a-Grille

  • Traffic Calming
  • Construction Phasing
  • Communication
  • Q & A Session

Existing Roadway and Sidewalk

slide-3
SLIDE 3

Pass-a-Grille Way Roadway Improvements Cabrillo Ave. to 19th Ave.

Project Overview

Deteriorating Asphalt and Wastewater Lines

  • 4,300 LF (0.8 miles)
  • 15 Intersections
  • Replace Gravity Sewer

Line & Manholes

  • Construct 8-inch Potable

Water Line

  • Construct 24-inch

Stormwater Line, Inlets & Tide Control Structures

Cabrillo Ave. 19th Ave.

slide-4
SLIDE 4

Tree Preservation

Preservation, Relocation, and Revegetation

Pass-a-Grille Way Roadway Improvements Cabrillo Ave. to 19th Ave.

  • Preserve Palm Trees on

east and west side of Pass-a-Grille Way, if possible

  • Remove Australian Pines

Australian Pine East Side Tight ROW

slide-5
SLIDE 5

Sidew alks & Bike Lanes

Pass-a-Grille Way will Continue to be a Multi-modal Thoroughfare

Pass-a-Grille Way Roadway Improvements Cabrillo Ave. to 19th Ave.

  • Current Configuration
  • 12 ft. travel lanes
  • 2 ft. bike lanes both

sides

  • 1-ft curb
  • 5 ft. sidewalk W. side
  • 60 ft. right-of-way
  • 28 ft. pavement width
  • Options
  • Bike lanes both sides
  • Sidewalks both sides
  • One sidewalk, one

bike lane Pass-a-Grille Way

slide-6
SLIDE 6

Full Alternative Cross Section

Full Reconstruction

Pass-a-Grille Way Roadway Improvements Cabrillo Ave. to 19th Ave.

5’ 6’ 4’ 4’ 6’ 5’ 12’ 12’ 2’ 2’

  • 60 feet existing right-of-way and 28 feet existing pavement width
  • Alternative is within existing ROW, but expands pavement width by 6’
slide-7
SLIDE 7

Roadw ay Only Cross Section

Limited Reconstruction

Pass-a-Grille Way Roadway Improvements Cabrillo Ave. to 19th Ave.

  • Tree preservation on east side
  • Pavement restriped to remove north-bound bike lane
  • New sidewalk added to east side
  • Current sidewalk on west side remains in place

5’ 6’ 4’ 6’ 5’ 12’ 12’ 2’ 2’

slide-8
SLIDE 8

Intersection of 21 st Ave. & Pass-a-Grille Way

Intersection Reconstructed to Increase Aesthetics

Pass-a-Grille Way Roadway Improvements Cabrillo Ave. to 19th Ave.

  • Alternatives:
  • Keep existing traffic

signal

  • Replace with pole-

mounted decorative signal

  • Replace with 4-way

stop signs

  • Add brick accents at

corners

  • Relocate aerial electric

lines at intersection underground Traffic Signal Existing Trees Overhead Wires Local Businesses

slide-9
SLIDE 9
slide-10
SLIDE 10

Traffic Calming

Pass-a-Grille Way Roadway Improvements Cabrillo Ave. to 19th Ave.

  • Speed tables/Bumps/Humps
  • High Emphasis Crosswalks
  • Stamped Pavement
  • Flashing Signals
  • Bulb-Outs
  • Other Traffic Calming

Measures

Speed Table

Traffic Logix

Stamped Pavement & Bulb-Outs

FHWA

Ped Activated Signal

slide-11
SLIDE 11

Construction Phasing

Target Start Date Fall 2015; Anticipated to Last 14 Months

Pass-a-Grille Way Roadway Improvements Cabrillo Ave. to 19th Ave.

  • Potential Phasing Plan
  • 1. S. of 30th to Cabrillo
  • 2. N. of 28th to S. of 30th
  • 3. N. of 21st to N. of 28th
  • 4. S. of 19th to N. of 21st
  • Considerations
  • Day vs. night time

construction

  • Maintenance of business

access

  • Homeowner access for

roadway and baffle box construction

Usafetyflorida.com

slide-12
SLIDE 12

Construction Detours

Safety and Access

Pass-a-Grille Way Roadway Improvements Cabrillo Ave. to 19th Ave.

1. Flaggers 2. 28th – Sunset – 30th 3. 21st – Gulf – 22nd – Sunset – (30th and 28th) 4. 18th – Gulf – 22nd

1 2 3 4

slide-13
SLIDE 13

Construction Costs

Pass-a-Grille Way Roadway Improvements Cabrillo Ave. to 19th Ave.

Roadway $2,300,013 Stormwater $2,118,681 Wastewater $1,138,125 Total $5,556,819

  • Key Points about Costs
  • Shared between various funds
  • Stormwater may be grant funded
slide-14
SLIDE 14

Communication

There will be multiple ways to access up-to-date project information

Pass-a-Grille Way Roadway Improvements Cabrillo Ave. to 19th Ave.

  • City Staff
  • Overall Control
  • CPWG – Design Engineer
  • Solve Problems
  • Contractor (Once Selected)
  • Day to Day Issues
  • Newspaper
  • Website
  • www.stpetebeach.org
slide-15
SLIDE 15

Thank You for Attending

For further information please contact:

Pass-a-Grille Way Roadway Improvements Cabrillo Ave. to 19th Ave.

City of St. Pete Beach Steve Hallock, Public Services Director 155 Corey Avenue

  • St. Pete Beach, FL 33706-1839

727.363.9224 S.Hallock@stpetebeach.org

Have questions? Please stay for a One-on-One Q & A Session