play

City of St. Pete Beach Pass-a-Grille Way Roadway Improvements - PowerPoint PPT Presentation

City of St. Pete Beach Pass-a-Grille Way Roadway Improvements Cabrillo Ave. to 19 th Ave. April 2, 2014 Public Meeting Presentation by: Welcome Seeking Public Input on Roadway Corridor Construction Project Overview Tree Preservation


  1. City of St. Pete Beach Pass-a-Grille Way Roadway Improvements Cabrillo Ave. to 19 th Ave. April 2, 2014 Public Meeting Presentation by:

  2. Welcome Seeking Public Input on Roadway Corridor Construction  Project Overview  Tree Preservation  Sidewalks & Bike Lanes  Intersection of 21 st & Pass-a-Grille  Traffic Calming  Construction Phasing  Communication Existing Roadway and Sidewalk  Q & A Session Pass-a-Grille Way Roadway Improvements Cabrillo Ave. to 19 th Ave.

  3. Project Overview Deteriorating Asphalt and Wastewater Lines Cabrillo Ave.  4,300 LF (0.8 miles)  15 Intersections  Replace Gravity Sewer Line & Manholes  Construct 8-inch Potable Water Line  Construct 24-inch 19 th Ave. Stormwater Line, Inlets & Tide Control Structures Pass-a-Grille Way Roadway Improvements Cabrillo Ave. to 19 th Ave.

  4. Tree Preservation Preservation, Relocation, and Revegetation East Side  Preserve Palm Trees on east and west side of Pass-a-Grille Way, if possible  Remove Australian Pines Australian Pine Tight ROW Pass-a-Grille Way Roadway Improvements Cabrillo Ave. to 19 th Ave.

  5. Sidew alks & Bike Lanes Pass-a-Grille Way will Continue to be a Multi-modal Thoroughfare  Current Configuration  12 ft. travel lanes  2 ft. bike lanes both sides  1-ft curb  5 ft. sidewalk W. side  60 ft. right-of-way  28 ft. pavement width  Options  Bike lanes both sides  Sidewalks both sides Pass-a-Grille Way  One sidewalk, one bike lane Pass-a-Grille Way Roadway Improvements Cabrillo Ave. to 19 th Ave.

  6. Full Alternative Cross Section Full Reconstruction  60 feet existing right-of-way and 28 feet existing pavement width  Alternative is within existing ROW, but expands pavement width by 6’ 5’ 12’ 12’ 4’ 6’ 2’ 4’ 2’ 6’ 5’ Pass-a-Grille Way Roadway Improvements Cabrillo Ave. to 19 th Ave.

  7. Roadw ay Only Cross Section Limited Reconstruction  Tree preservation on east side  Pavement restriped to remove north-bound bike lane  New sidewalk added to east side  Current sidewalk on west side remains in place 5’ 12’ 12’ 6’ 2’ 4’ 2’ 6’ 5’ Pass-a-Grille Way Roadway Improvements Cabrillo Ave. to 19 th Ave.

  8. Intersection of 21 st Ave. & Pass-a-Grille Way Intersection Reconstructed to Increase Aesthetics  Alternatives:  Keep existing traffic signal  Replace with pole- mounted decorative signal Traffic Signal Existing Trees  Replace with 4-way stop signs  Add brick accents at corners  Relocate aerial electric lines at intersection Overhead Wires Local Businesses underground Pass-a-Grille Way Roadway Improvements Cabrillo Ave. to 19 th Ave.

  9. Traffic Calming  Speed tables/Bumps/Humps  High Emphasis Crosswalks Traffic Logix  Stamped Pavement Speed Table  Flashing Signals  Bulb-Outs  Other Traffic Calming Measures Stamped Pavement & Bulb-Outs FHWA Ped Activated Signal Pass-a-Grille Way Roadway Improvements Cabrillo Ave. to 19 th Ave.

  10. Construction Phasing Target Start Date Fall 2015; Anticipated to Last 14 Months  Potential Phasing Plan 1. S. of 30 th to Cabrillo 2. N. of 28th to S. of 30th 3. N. of 21st to N. of 28th 4. S. of 19th to N. of 21st  Considerations  Day vs. night time construction  Maintenance of business access  Homeowner access for Usafetyflorida.com roadway and baffle box construction Pass-a-Grille Way Roadway Improvements Cabrillo Ave. to 19 th Ave.

  11. Construction Detours Safety and Access 1 1. Flaggers 2. 28th – Sunset – 30th 2 3. 21st – Gulf – 22nd – Sunset – (30th and 28th) 4. 18th – Gulf – 22nd 3 4 Pass-a-Grille Way Roadway Improvements Cabrillo Ave. to 19 th Ave.

  12. Construction Costs Roadway $2,300,013 Stormwater $2,118,681 Wastewater $1,138,125 Total $5,556,819  Key Points about Costs  Shared between various funds  Stormwater may be grant funded Pass-a-Grille Way Roadway Improvements Cabrillo Ave. to 19 th Ave.

  13. Communication There will be multiple ways to access up-to-date project information  City Staff  Overall Control  CPWG – Design Engineer  Solve Problems  Contractor (Once Selected)  Day to Day Issues  Newspaper  Website  www.stpetebeach.org Pass-a-Grille Way Roadway Improvements Cabrillo Ave. to 19 th Ave.

  14. Thank You for Attending For further information please contact: City of St. Pete Beach Steve Hallock, Public Services Director 155 Corey Avenue St. Pete Beach, FL 33706-1839 727.363.9224 S.Hallock@stpetebeach.org Have questions? Please stay for a One-on-One Q & A Session Pass-a-Grille Way Roadway Improvements Cabrillo Ave. to 19 th Ave.

Download Presentation
Download Policy: The content available on the website is offered to you 'AS IS' for your personal information and use only. It cannot be commercialized, licensed, or distributed on other websites without prior consent from the author. To download a presentation, simply click this link. If you encounter any difficulties during the download process, it's possible that the publisher has removed the file from their server.