NTPEP 2014 Nomination and Selection of Vice Chair Update on - - PowerPoint PPT Presentation

ntpep 2014
SMART_READER_LITE
LIVE PREVIEW

NTPEP 2014 Nomination and Selection of Vice Chair Update on - - PowerPoint PPT Presentation

Polymer Concrete Overlays/ High Friction Surfacing NTPEP 2014 Nomination and Selection of Vice Chair Update on Program 2012 Test decks 4 total systems 1 Concrete pavement 1 Bridge deck 4 Asphalt pavement Program Update


slide-1
SLIDE 1

NTPEP 2014

Polymer Concrete Overlays/ High Friction Surfacing

slide-2
SLIDE 2

Nomination and Selection

  • f Vice Chair
slide-3
SLIDE 3

Update on Program

  • 2012 Test decks

 4 total systems

 1 Concrete pavement  1 Bridge deck  4 Asphalt pavement

slide-4
SLIDE 4
slide-5
SLIDE 5

Program Update

  • 2012 Data

 Laboratory nearly completed  Initial field data collected:

 Friction Number 40 mph  Adhesion  Percent delamination

slide-6
SLIDE 6
slide-7
SLIDE 7

Program Update

  • 2012 Data Cont.

 Year 1 field data collected:

 Friction Number:

 20mph, 40mph 60mph (ribbed and smooth tire)  Grip number 20mph, 40mph, 60mph (Virginia Tech)  Dynamic Friction Test  Laser Contour/ Texture Testing  Adhesion  Delamination percentage

slide-8
SLIDE 8

Program Update

  • 2013 Initial Data

 Friction number:

 20mph, 40mph, 60mph (ribbed and smooth tire)  Grip number 20mph, 40mph, 60mph (Virginia Tech)  Dynamic Friction Tester  Laser Contour/ Texture Testing  Adhesion  Delamination Percentage

slide-9
SLIDE 9
slide-10
SLIDE 10

Workplan Discussion

  • Perimeter cracking of asphalt installations

 Kentucky has seen a large number of installations

where cracking has occurred on the perimeter.

 Coring pavement (if possible) and measuring crack

depth.

 Potential for a non destructive test.

slide-11
SLIDE 11
slide-12
SLIDE 12

INDUSTRY INPUT

We need more friends

slide-13
SLIDE 13

OPEN DISCUSSION

Action Items for 2014?

slide-14
SLIDE 14

YOU MAY LEAVE NOW!